PROMPT PUBLIC NOTIFICATION 4
PROPOSED CHANGE OF IMPLEMENTATION DATE AususT 27, 1981 i
4 0
6 re.e.
8109040031 810827 PDR 10CFR PT9.7 PDR
4
\\
IMPLbENTATIONOFEARLYWARN'INGSYSTEMS BACKGROUND EMERGENCY PLANNING RULE PUBLISHED AUGUST 19, 1980 EFFECTIVE NOVEMBER 3, 1980 MAJOR ELEMENTS SUBMIT PLANS JANUARY 3, 1981 SUBMIT PROCEDURES MARCH 1,'1981 IMPLEMENT PLANS APRIL 1, 1981 PROMPT NOTIFICATION SYSTEM July 1, 1981 COMMISSION DECISION TO CHANGE DATE AUGUST 11, 1981 FOR PROMPT NOTIFICATION SYSTEM ISSUE WHAT NEW DATE SH0ulD BE AND WHETHER ENFORCEMENT ACTION BE TAKEN PROMPTLY AFTER THAT TIME.
S
+
e A
IMPLE'iENTATION PROBLEMS
- EXTENSIVE TIME REQUIRED FOR ENGINEERING STUDIES.
- OBTAINING DESIGN CONCURRENCE FROM LOCAL COUNTIES, STATES, AND FEMA.
- OBTAINING NECESSARY PERMITS FROM NUMEROUS GOVERNMENTS.
- NEGOTIATIONS FOR PUBLIC AND PRIVATE RIGHT-OF-WAYS.
- DELAYS IN EQUIFAENT DELIVERY.
- INSTALLATIONS IN OTHER UTILITIES' SERVICE ARTAS.
- OBTAINING FCC LICENSE FOR THE FREQUENCIES NEEDED TO ACTIVATE THE SIRENS OR THE NOAA WEATHER RADIOS.
- CONTROL INTERCONNECTIONS WITH COUNTY SPECIFIC EQUIPMENT.
NOTE:
LICENSEES HAD REQUESTED RELIEF FROM DATE AT 29 0F 48 SITES BEFORE JULY 1, 1981.
CURRENT COMISSION ACTION WILL BE THE RESPONSE TO THESE REQUESTS.
M w
9
CONSIDERATIONS It'! MAKliiG DECISION THOSE FACILITIES WITH EQUIPMENT ON ORDER BY JULY 1, 1981 HAVE ESTIMATED OPERATIONAL DATES NOT LATER THAN JANUARY 1,1982.
TWO-THIRDS OF THE OPERATING PLANTS WILL THEN HAVE INSTALLED SYSTEMS.
REMAINING ONE THIRD OF SITES HAVE ESTIMATED COMPLETION DATES NOT LATER THAN JULY 1982.
(EXCEPT SIX SITES WHICH OPPOSE' REQUIREMENT AT LEAST IN PART).
EARLIER DATE THAN Jutv 1, 1982 MAY PROVIDE INCENTIVE TO EXPEDITE COMPLETION OF SYSTEMS.
LATER DATE WOULD PROVIDE BETTER ASSURANCE THAT ANY DIFFICULTIES WITH OFFSITE AUTHORITIES COULD BE OVERCOME.
G e
O
,-.2,
-Q-r
-+-
fiUMBER Ill EACH CATEGORY CATEGORY NUMBER PERCENT A (COMPLETE BY JULY 1) 6 12.5%
l B (N0w COMPLETE) 6 12.5%
B (PARTI ALLY OPERATIONAL) 5 10.4%
B (SYSTEMS ORDERED) 14 29. 2'.'
C (EQUIPMENT NoT ORDERED BY JULY 1) 17 35.4%
I t
,,,,-.-,,n-w.,w--~a--
y-+-.
,a-ay,-
w-,,n-,--,
,,-,---,-g,-.,
.g,-_--.
cc,,,,g.p_w.
,,,,-,7-,,,,,,,-.,na-
,,,,,c,-
CATEGORY A FACILITIES h
FACILITY COMPLETION DATE CALVERT CLIFFS 6/29/31 CRYSTAL RIVER 7/01/81 HATCH 7/01/81 MCGUIRE 7/01/81 OCONEE 7/01/81 ARKANSAS 7/01/81 4
O e
CATEGORY E FACILITIES PROJECTED COMPLETION DATE FOR ALL "B" FACILITIES - JANUARY 1, 1932 FACILITIES PROJECTED COMPLETION DATE COOPER NOW COMPLETE (7/31/31)
MAINE YANKEE N0w CGMPLETE (7/27/81)
SAN ONOFRE N0w COMPLETE (8/7/81)
TROJAN N0w COMPLETE (7/24/81)
SEQUOYAH N0w COMPLETE (8/01/81)
COOK N0w COMPLETE (8/07/81-)
BRUNSWICK 9/30/81 (PARTI ALLY OPERATIONAL)
RosINSON 9/30/81 (PARTIALLY OPERATIONAL)
FARLEY 10/1/81 (PARTI ALLY OPERATIONAL)
NORTH ANNA 10/31/81 (PARTIALLY OPERATIONAL)
SURRY 10/31/81 (PARTI ALLY OPERATIONAL)
TMI 8/31/81 SALEM 10/01/81
- 1/1/82 INDIAN POINT 2/3 10/22/81
-0YSTER CREEK 10/81 FiTzPATRICK/NINEMILEPOINT 10/81 GINNA 11/95/81 VERMONT YANKEE 11/30/81 YANKEE R0wE 11/30/81 n
e e.
, +, - -
,-.,,-7,-
,,---,,m e
-m
=
CATEGORY B FACILITIES (CONTO)
FACILITIES PROJECTED COMPLETION DATE BEAVER VALLEY 11/81 i
PILGRIM 12/31/81 ST LuCIE 12/31/31 TURKEY POINT 12/31/81 FT. CALHOUN 1/01/82 DAVIS-BESSE i
EQUIPMENT ONSITE - AWAITING FCC FREQUENCY CLEARANCE I
e 6
--..-a,-y,- - - -, - - - -,, - -~.g.n,e.w.,w,,-
y.,
-,..g,
.,w,,
yw,,
,n..-~,nw-r---,--,---~-
,m-
-wm--p-s--,em,m---ev,-,g4qwe-pyy w - p r,w g,
CATEGORY C FACILITIES PROJECTED COTiPLETION DATE FOR MOST "C" FACILITIES MID 1982 FACILITY PROJECTED COMPLETION DATE DUANE ARNOLD 10/01/81 KEWAUNEE SPRING 82 BROWNS FERRY 11/81 - EARLY 82 DRESDEN 3/82 POINT BEACH 2/82 OUAD CITIES 4/82 ZION 4/82 PRAIRIE ISLAND 5/82 (5 MILES ONLY PROPOSED)
RANCHO SECO 5/82 MONTICELLO 6/82 (5 MILES ONLY PROPCSED)
PALISADES 6/81*
HADDAM NECK MID 1982 MILLSTONE MID 1982 PEACH BOTTOM 7/82 Bla ROCK POINT FT. ST. VRAIN LACROSSE 10/12/81 (1-1/4 MILES ONLY PROPOSED)
SYSTEM COMPLETE TO 5 MILES - NO PROPOSAL FOR S TO 10 MILES LICENSEE REQUESTED TOTAL EXEMPTION FROM RULE n
._..-._p-,
..e,-
y,-,
..,,,m,.
n
~,-g
OPERATING FACILITIES NOT COMPLETING SYSTEM BY SEPTEMBER 1 AND WHICH DID NOT NOTIFY NRC IN WRITING BEFORE JULY 2, 1981 0F FAILURE TO MEET JULY 1, 1981 DATE LACROSSE PALISADES BROWNS FERRY KEWAUNEE DUANE ARNOLD FITzPATRICK OYSTER CREEK INDIAN POINT 2 INDIAN POINT 3 FARLEY ADDITIONALOPERATINGFACILITIESFAILINGTONOTIFYNRCINWRITING BUT WHICH COMPLETED SYSTEM IN JULY OR AUGUST SAN ONOFRE MAINE YANKEE IROJAN O
_ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _.. _ _. _ _ _ _. _ _ _ _ _ _ _ _ _ _. _. _ _ _ _.. _ _ _ _ _ _. _ _ _ _.. _ _ _ _