ML20010E254

From kanterella
Jump to navigation Jump to search
Forwards LER 81-037/03L-0 & Updated LER 81-034/04X-1
Date released: 01/24/2020 Download: ML20010E254


Updated LER 81-034/04X-0:between 810617 & 810715,detector on Rms Channel R-19 Failed & Steam Generator Blowdown Flash Tank Experienced Small primary-to-secondary Leak.Caused by Failure of Meter,Model 654.Procedures Revised
ML20010E259
Person / Time
Site: Cook 
Issue date: 08/25/1981
From: Rischling J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20010E259 (3)
LER 81-037/03L-0:on 810728 & 29,containment Pressure hi-hi Bistable Found to Trip Outside Tech Spec Requirements.Caused by Instrument Drift.Bistable Recalibr.During Retest,Bistable Actuation Point Found Excessive.Bistable Replaced
ML20010E257
Person / Time
Site: Cook 
Issue date: 08/25/1981
From: Rischling J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20010E257 (2)
Forwards LER 81-037/03L-0 & Updated LER 81-034/04X-1
ML20010E253
Person / Time
Site: Cook 
Issue date: 08/25/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20010E253 (1)