Text
.
,
.
,
%
2
y
u
AUG 14 1381
7 {CCL
//
Docket No. 50-344
f
f "EpW[hh
S
Portland General Electric Company
r
g2 ISSA ~2
"
121 S. W. Salmon Street
Portland, Oregon 97204
{ v4 k g
Attention: Mr. h rt D. Withers
/
4
Vice President, Nuclear
g
Gentlemen:
Subject: NRC Inspection of the Trojan Nuclear Plant
This refers to the inspection conducted Ly Mr. P. P. Nart ut and W. J. Wagner
of this office on July 27-31, 1981 of activities authorized by NRC License No.
NPF-1, and to the discussion of our findings held with Messrs. R. P. Barkhurst
and other members of your staff at the conclusion of the inspection.
Areas examined dering this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirenents were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any infomation that you (or your
contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it
is necessary that you (a) notify this office by telephone within ten (10) days
from the date of this letter of your intention to file a request for with-
holding; and (b) submit within 25 days from the date of this letter a written
application to this office to withhold such information.
If your receipt of
this letter has been delayed such that less than seven (7) days are available
for your review, please notify this office promptly so that a new due date
may be established. Consistent with section 2.790(b)(1), any such application
must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which contains
a full statement of the basis on which it is claimed that the infomation
should be withheld from public disclosure. This section further requires
the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The infomation sought to be withheld shall be incorporated
$
$r
n
om> .
.R.V
"""" > B. FAU LKENB ERRY /j c . 8109030143 elogi4
6L/81. gDRADOCK 05000344 ' " 1. . poR _ __ _: '" ~3= mc e cmu mo emc u o2" OFFICIAL RECORD COPY
_ _ _ _ _ _ _ _ _ _ . I'21 E3I Portland General Electric Corpany -2- as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room. Should you have any questions concerning this inspection, we will be glad to discuss then with you. Sincerely, B. H. Faulkenberry, Chief Reactor Construction Projects Branch Enclosure: IE Inspection Report No. 50-344/81-20 cc w/o enc'!osure: C. P. Yundt, PGE J. W. Durham, Esq., PGE , l l l Sent to DMB for DCS processing. l l Distributed by RV: l RV PDP Resident Inspectors (3 copies) 00E (Godard) RHE (w/o enclosure) .
}}