Forwards IE Insp Rept 50-344/81-20 on 810727-31.No Noncompliance Noted
ML20010E146
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/14/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20010E147 List:
References
NUDOCS 8109030143
Download: ML20010E146 (2)


See also: IR 05000344/1981020

Text

.

,

.

,

%

2

y

u

AUG 14 1381

7 {CCL

//

Docket No. 50-344

f

f "EpW[hh

S

Portland General Electric Company

r

g2 ISSA ~2

"

121 S. W. Salmon Street

Portland, Oregon 97204

{ v4 k g

Attention: Mr. h rt D. Withers

/

4

Vice President, Nuclear

g

Gentlemen:

Subject: NRC Inspection of the Trojan Nuclear Plant

This refers to the inspection conducted Ly Mr. P. P. Nart ut and W. J. Wagner

of this office on July 27-31, 1981 of activities authorized by NRC License No.

NPF-1, and to the discussion of our findings held with Messrs. R. P. Barkhurst

and other members of your staff at the conclusion of the inspection.

Areas examined dering this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirenents were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any infomation that you (or your

contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it

is necessary that you (a) notify this office by telephone within ten (10) days

from the date of this letter of your intention to file a request for with-

holding; and (b) submit within 25 days from the date of this letter a written

application to this office to withhold such information.

If your receipt of

this letter has been delayed such that less than seven (7) days are available

for your review, please notify this office promptly so that a new due date

may be established. Consistent with section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which contains

a full statement of the basis on which it is claimed that the infomation

should be withheld from public disclosure. This section further requires

the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The infomation sought to be withheld shall be incorporated

$

$r

n

om> .

.R.V

"""" > B. FAU LKENB ERRY /j c . 8109030143 elogi4

6L/81. gDRADOCK 05000344 ' " 1. . poR _ __ _: '" ~3= mc e cmu mo emc u o2" OFFICIAL RECORD COPY

_ _ _ _ _ _ _ _ _ _ . I'21 E3I Portland General Electric Corpany -2- as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room. Should you have any questions concerning this inspection, we will be glad to discuss then with you. Sincerely, B. H. Faulkenberry, Chief Reactor Construction Projects Branch Enclosure: IE Inspection Report No. 50-344/81-20 cc w/o enc'!osure: C. P. Yundt, PGE J. W. Durham, Esq., PGE , l l l Sent to DMB for DCS processing. l l Distributed by RV: l RV PDP Resident Inspectors (3 copies) 00E (Godard) RHE (w/o enclosure) .

}}