Forwards IE Insp Rept 50-070/81-03 on 810612.No Noncompliance Noted
ML20010E104
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 08/04/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Darmitzel R
GENERAL ELECTRIC CO.
Shared Package
ML20010E105 List:
References
NUDOCS 8109030091
Download: ML20010E104 (2)


See also: IR 05000070/1981003

Text

.

9,

3

i

T

2

-

%

$

S

AUG

4 1981

Docket No. 50-70

fG ?t ! ,Q,/

s-

s

' h. /7

%

General Electric Conpany

I

Vallecitos Nuclear Center

N

h LIlbId '

Vallecitos Road

Pleasanton, Caltfornia 94566

. 9j SEp 02198} m

'

Attention: Mr. R. W. Damitzel, Manager

"@

~

9

Irradiation Processing Operation

f

k

4

to

Gentlenen:

g

Subject: NRC Inspection of GETR Modifications

This refers to the inspection conducted by Mr. J. F. Burdoin of this office

on June 12, 1981 of activities authorized by NRC License No. TR-1, and

to the discussion o' his findings held by the inspector with members of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report.

Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any infomation that

you (or your contractors) believe to be exenpt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days frem the

date of this letter a written application to this office to withhold such

information.

If your receipt of this letter has been delayed such that

less than seven (7) days are available for your review, please notify this

Consistent with

office prorptly)so that a new due date may be established.section 2.790(b (1),

executed by the owner of the infomation which identifies the document or

part sought to be withheld, and which contains a full statenent of the

basis on which it is claimed that the infomation should be withheld from

public disclosure. This section further requires the statement to address

l

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

58k!

l

810903o091 810804

PDR ADOCK 05000070

  • 0,

PDR

. . . .

"~4

.BURDOI

. BIS

.

.EAULKlNBERRY

I

em) 7//f/8

7/23/81

8/3 /81

um e-=

._

,

. OFFICIAL RECORD C.O PY.-

_

- _ - _

_

-

uc rosu m ac sm ucu c2"

-

-

-

._

.

,

General Electric Company

-2-

%

4 881

!

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed

in the Public Document Roon.

Should you have any questions concerning this inspection, we will te glad

to discuss them with you.

Sincerely,

Cngsnu) signed oif

8- l-L RLiLiker10emj

B. H. Faulkenberry, Chief

i

I

Reactor Construction Projects Branch

Enclosure:

!

IE Inspection Report

!

No. 50-70/81-03

i

i

Sent to Reproduction, HQ, for distribution.

l

,

Distributed by RV-

State of CA

'

LFMB (w/o enclosure)

RHE (w/o enclosure)

i

.

I

I

l

i

l

i

<

---

. ,

,

- - _ _ _ - - -

-.

__.

- _ . _ _ _ , _ _ - _ _ _ . . , _ ~ - -

___, - -,

- . - _ _ _ _ _ _ -

- - . _ .