Forwards Questions Asked in Facility FSAR Review to Which Util Has Not Responded.Util Should Confirm When & If Questions Will Be Answered
ML20010D803
Person / Time
Site: Callaway  
Issue date: 08/12/1981
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Bryan J
UNION ELECTRIC CO.
References
NUDOCS 8108310532
Download: ML20010D803 (8)


Text

/

/

/

w

~

y.

o 6

6 6

g o

(y df Dist.

Docket File LBf1 Rdg bcc:

E DEisenhut TERA BJYoungblood NRC/PDR Docket Nos.: STN 50-483 MRushbrook L/PDR and STN 5%486 GEdison NSIC RVollmer TIC TMurley ACRS(16)

Mr. J. K. Bryan RMattson Vice President RHartfield, MPA Union Electric Company OELD Post Office Box 149 OIE (3)

St. Louis, Missouri 63166

Dear Mr. Bryan:

Subject:

Callaway FSAR Review Questions As we approach the final sta es of preparation of the Safety Evaluation Report for Callaway Unit 1, we find it necessary to determine the status of responses to questions that have been asked in our review of the Callaway FSAR. These include questions transmitted to you by mail with NRC review branches iden-tification numbers, as well as questions discussed at public meetings and documented in meeting sumaries.

We have listed in Enclosures 1 and 2 questions for vhich we have no record of a response, either by letter or by FSAR revision up to and including Revision 5 to the SNUPPS FSAR and Revision 3 to the Callaway FSAR site addendum.

We recognize that you may have responded to a number of these items in recent letters and FSAR revisions. However, to expedite the review proess your assistance is requested in confirming the status of these items.

You are requested to review Enclosures 1 and 2.

If a respcase has been made to any of these questions, please identify a reference (letter and date) for each.

For those questions still requiring a response, please provide a schedule within seven days of your receipt of this letter indicating when you intend to respond, consistent with the SER schedule. With regard to the SER schedule we require satisfactory responses to all questions to be submitted within two weeks in order to meet the SER schedule with no open items remaining.

i If you require further information or clarification of this request, please contact the NRC Licensing Project Manager Dr. G. E. Edison.

Sincerely, h

'dii1gim1Trinned W8 y'

c Bi' N ood,Cbf

  • ' g #.o/ [2 Np Licensing ranchNo.\\Lj Division of Licensin )

e ob d

Enclosure:

,g ig As stated

/n i i cc: ser next page

......... t@..

...pB DL:LB#1 DL

'1 y

"""*d NN&2 Q

.GEdisun/ys.... BJYo nhblood.

n

../..}. 81 DATE),A

..........,.......P.D.R.....

8/

.... n. /81 8

I NRC FORM 3'8 HOz80l NHCM O240 OFFICIAL REC"ORD COPY

' " *2"2 '

Mr. J. K. B ryan Vice President - Nuclear Union Electric Company P. O. Box 149 St. Louis, Missouri 63166 cc: Mr. Nicholas A. Petrick Mr. William Hansen Executive Director - SNUPPS Resident Insoector/Callaway NPS 5 Choke Cherry Road c/o USNRC Rockville, Maryland 20850 Steedman, Missouri,.65077 Gerald Charnoff, Esq.

Shaw, Pittman, Potts &

Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Mr. J. E. Birk Assistant to the General Counsel Union Electric Company P. O. Box 149 St. Louis, Missouri 63166 Dr. Vern Starks Route 1, Box 863 Ketchikan, Alaska 99901 Ms. TrovaHearn, Assistant General Counsel Missouri Public Scrvice Co:nnission P. O. Box 360 Jefferson City, Missouri 65102 Mr. D. F. Schnell Manager-Nuclear Engineering Union Electric Company P. O. Cox 149 St. Louis, Missouri 63166 i

~

i 1

i I

1 7

i Questions Documented in Letters for NRC for Which No Response has Been Recorded Callaway, Unit 1 Branch Question Number Date to Applicant Date Due tea terials 123.1C 7/28/81 8/14/81 Engineering 123.2C 7/28/81 8/14/81 123.3C 7/28/81 8/14/81 123.4C 7/28/81 8/14/81 123.5C 7/28/81 8/14/81 123.6C 7/28/81 8/14/81 123.7C 7/28/81 8/14/81 123.8C 7/28/81 8/14/81 123.9C 7/28/81 8/14/81 123.10C

'/28/81 8/14/81

/

123.11C 7/28/81 8/14/81 "aterials 250.1C 4/8/81 5/29/81 Engineering Quality 260.52C 3/26/81 4/25/81 Assurance 260.53C 3/26/81 4/25/81 260.54C 3/26/81 4/25/81 260.55C 3/26/81 4/25/81 260.56C 3/26/81 4/25/81 260.57C 3/26/81 4/25/81 260.58C 3/26/81 4/25/81 260.59C 3/26/81 4/25/81 260.60C 3/26/81 4/25/81 260.61C 3/26/81 4/25/81 260.62C 3/26/81 4/25/81 260.63C 3/26/81 4/25/81 260.64C 3/26/81 4/25/81 260.65C 3/26/81 4/25/81

[

260.66C 3/26/81 4/25/81 260.67C 3/26/81 4/25/81 l

260.68C 3/26/81 4/25/81 260.69C 3/26/81 4/25/81 260.70C

'3/26/81 4/25/81 i

Generic 730.1 7/9/81 8/10/81 Issues Emergency 810.1C 6/29/81 7/13/81 l

Preparedness 810.2C 7/22/81 8/7/81 Procedures &

640.1 8/7/81 8/21/81 Test Review 640.2 5/7/81 8/21/81 640.3 8/7/81 8/21/81 640.4 8/7/81 8/21/81 640.5 8/7/81 8/21/81 640.6 8/7/81 8/21/81 I

640.7 8/7/81 8/21/81 l

Branch _

  • Question fiumber Date to Applicant _

Due Date Procedure &

640.8 8/7/81 8/21/81 Test Review 640.9 8/7/81 8/21/81 640.10 8/7/81 8/21/81 640.11 8/7/81 8/21/81 640.12 8/7/81 8/21/81 640.13 8/7/81 8/21/81 640.14 8/7/81 8/21/81 640.15 8/7/81 8/21/81 640.16 8/7/81 8/21/81 640.17 8/7/81 8/21/81 640.18 8/7/81 8/21/81 640.19 8/7/81 8/21/81 640.20 8/7/81 8/21/81 640.21 8/7/81 8/21/81 640.22 8/7/81 8/21/81 640.23 8/7/81 8/21/81 640.24 8/7/81 8721/81 640.25 S/7/81 8/21/81 640.26 8/7/81 8/21/81 640,27 8/7/81 8/21/81 640.1C 8/7/81 8/21/81 640.2C 8/7/81 8/21/81 640.3C 8/7/81 8/21/81 640.4C 8/7/81 8/21/81 640.5C 8/7/81 8/11/81 640.6C 8/7/81 8/21/81 640.7C 8/7/81 8/21/81 l

640.8C 8/7/81 8/21/81 l

l 1

Questions Documented in Public Meeting Sunmaries for.Which No Response has Been Recorded - Callaway, Unit 1 Branch Meeting Date Date of Mtg. Summary Question

  • Status
  • I EB 6/9,10/81 7/6/81 VI.1 3

3 3

4 3

5 3

6 3

8 3

9 3

11 3

12 3

14 3

15 3

16 3

17 3

_ 18 3

19 3

21 1

22 3

23 3

24 3

25 3

26 3

27 3

28 3

29 1

30 1

33 1

34 3

35 3

36 3

37 3

38 3

39 3

SEB 5/5/81 5/8/81 2.

1 3.

1 HGEB 4/27/81 5/18/81 D.1 1

2.a 1

[

1 2.b 1

2.c 1

l 3.

1 l

4.

1 QAB 4/24/81 4/28/81 1.

3 2.

3 3.

1 l

c 1 = Applicant Action - Open 3 = Applicant Action - Method of resolution agreed upon with NRC reviewers, awaiting FSAR Amendment

Branch Meeting Date Date of Mtg. Summary Question

  • Status
  • ASB 2/12/81 2/18/81 2.a 1

2.b 1

2.c 1

2.d 1

3/19/81 3/23/81 4.a 1

4.b 1

4.c 1

4.d 1

4.e 1

4/29/81 5/1/81 2.a 3

2.b 3

5/13/81 5/26/81 2.b 1

3.a 1

3.b 1

ICSB 7/27/81 Expected 2.

1 8/14/81 3.

1 8.

1 9.

3 10.

3

'2.

1 13.

1 14.

3 16.

I 19.

1 20.

3 21.

3 24.

3 12 5.

1 34.

1 36.

3 39.

1 40.

3 43.

1 45.

3 46.

3 48.

1 49.

3 50.

1 51.

1 52.

3 54.

1 60.

1 68.

1 i

o 1 = Applicant Action - Open 2 = Applicant Action - Method of resolution agreed upon with f;RC reviewers, awaiting FSAR Admendment Branch _

Meeting Date_

Da te of Mtg. Suntnary, Ouestion*

S ta tus_*

ICSB 7/27/81 Expected Position 1.

1 (Continued) 8/14/81 2.

1 6.

1 7.

3 8.

1 9.

I 10.

3 PSB 5/14/81 5/27/81

2. (430.22) 1
3. (430.3,22) 1
4. (430.5) 1
5. (430.6) 1
6. (430.9) 3
7. (430.11) 1
8. (430.14) 1 9.

430.15) 1

'9.

430.30,32) 1 il.

430.34,35) 1

12. (430.38) 1
13. (430.41) 1
14. (430.42) 1
15. (430.43) 1
16. (430.51)
17. (430.54) 1 18.

1 7/16/81 Expected 8/14/81 3.

3 4.

3 6.c 1

6.d 3

6.e 3

6.f 3

69 3

6.h 3

9.

3 10.

1 i

11.a 1

11.b 3

11.c 3

11.d 3

l 14.

3 l

15.

1 18.

3 19.

1 l

o 1 = Applicant Action - Open l

3 = Applicant Action - Method of resolutior, agreed upon with flRC reviewers, awaiting FSAR Amendment

_4 Branch tjeetingDate Date of Mtg. Summary Question

  • S_ta tus
  • RSB 7/21/81 Expected 2.

3 8/12/81 3.

3 5.

1 9.

3 14.

1 16.

1 440.101 1

440.104 1

440.105 1

440.106 1

440.205 3

440.207 1

CSB 6/23/81 7/23/81 6.2.1.1 A-2 3

A-3 1

A-4 3

A-6 3

6.2.1.4-1 3

6.2.1.2-1 3

6.2.1.3-4 3

6.2.1.4-1 3

-3 3

6.2.2.-3 3

-4 3

6.2.4-1 3

6.2.4-5 3

1 = Applicant Action - Open 0

3 = Applicant Action - Method of resolution agreed upon with !!RC reviewers, awaiting FSAR Amendment

.