Advises That Licensing Schedules Projecting Plant Completion in 1984 Are Being Developed.Requests Updated Const Completion Date within 14 Days
ML20010D802
Person / Time
Site: Vogtle 
Issue date: 08/10/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Ehrensperger W
GEORGIA POWER CO.
References
NUDOCS 8108310527
Download: ML20010D802 (3)


Text

_

Dist.

' Docket Files LB#1 Rdg bcc:

DEisenhut TERA i

AUGUST 1 0 1981 BJYoungblood NRC/PDR JGrant L/PDR MRushbrook NSIC Docket No.:" 50-424= w RTedesco TIC

/d"Qtfig AGR RVollmer TMurley if-1 S@s Mr. W. E. Ehrensperger RMattson Q b( g, I *(

3, Senior Vice President - Power Supply RHartfield, MPA 4

u Georgia Power Company WJohnston p

gg 131981 1

P. O. Box 4545 OELD Aclanta, Georgia 30302 OIE (3) gec*'

0

Dear Mr. Ehrensperger:

Y)

We are developing licensing schedules for facilities projecting plant"c'ossle'tIo ]

n in 1984. Your licensing schedule will be developed using your estimated con-struction completion date and a set of standard hearing assurnptions.

The preliminary hearing schedules will assume a standard eleven-month time period from the issuance of the final Supplement to the Safety Evaluation Report (SSER) to the Comission decision date. This time period incorporates the efficiency measures projected to be in place in the near future. This time period is based on five months from issuance of the SSER to the start of hearing, five months from start of hearing to the initial decision by the Atomic Safety Licensing Board, and one month from the initial decision by the Atonic Safen Licensing Board to the Coalission decision date. These assumptions, and your relative priority, will be re-examined on a case-by-case basis after the Coamission completes its consideration of proposed changes to the regulations.

To assure proper allocation of resources it is ir.portant that you provide us a realistic and up-to-date projected construction coupletion date.

Because of manpower limitations eacn review will be scheduled to fall in a

" window" of tiac wherein our reviews must be conpleted. An unexpected change of your completion date will likely have an iapact on the schedule for your review. Accordingly, you should examine your construction completion date in the attached Table and confirn or change the date within 14 days of receipt of this letter.

You should also provide us quarterly updates thereaf ter until issuance of the Safety Evaluation report for the facility.

Sincerely, Origiuni signed by I)arroll G, r,isenhat Darrell G. Eisenhut, Director Division of Licensing

Enclosure:

As stated

,dk)

A cc: See next page UL:Lbel UL UL :-

t DL DIR

....or..........

I OFFICE )

W9u.e..a. acau.... v.

=.....

jar *u88R7a%h..............

J.a.r.e.e.m.s.......m XM__ 4W__ dao_

Sp__

NRC FORM 318 10-80) NRCM 0m OFFICIAL RECORD COPY esopo: mi-meo t

r-i 1984 PLANT COMPLETIONS PROJECTED BY APPLICANTS

  • PLANT APPLICANTS ESTIMATED CONSTRUCTION COMPLETION DATE Bellefonte 1 6/84 Limerick 1 7/84 Vogtle I 11/84 Harris 1 12/84 Washington Nuclear 1 12/84
  • Lists only first unit

Mr"..W.

E. Ehrensperger Senior Vice President Power Supply Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 cc:

Mr. L. T. Gucwa Chief fluclear Engineer -

Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Vice President Southern Services, Inc..

' P. O. Box 2625 Birmingham, Alabama 35202 Mr. J. A. Baily Project Licensing I'anager Southern Company Services, Inc.

P. O. Box 2625 Birmingham, Alabama 35202

' George F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge i800 M Street, fi. W.

Washington, D. C.

20036 e

o e

\\.

J