ML20010D578

From kanterella
Jump to navigation Jump to search
Opposes United Nuclear Corp Further Delays in Removal of Waste Matl from Lagoons for Proper Packaging & Disposal Scheduled for Jul
ML20010D578
Person / Time
Site: 07002153
Issue date: 07/17/1981
From: Garrahy J
RHODE ISLAND, STATE OF
To: Palladino N
NRC COMMISSION (OCM)
Shared Package
ML20010D576 List:
References
NUDOCS 8108280273
Download: ML20010D578 (1)


Text

. =:

~

aan

=...

State of Rhode Island and Provid:nce Plantations

~~'

sv mctmVE CHWBER. PRO 41DENCE

..... =

=

- ~ ~. -

2 J. Joseph Garrahy Governor i:, _

July 17, 1981

'2!~)?

t9!=E'. ~..

{.

k

'Ihe Honorable Ntunio J. Palledino

""~

Chairman

g;;,

Nuclear Regulatory Comission

.:e;;= &

Washington, DC 20555 g

:-

Dear Mr. Chainnan:

.5 p.=Uiri It has been brought to my attention that the United Nuclear Corporation O..;.;s.

proposes to delay removal and solidification of low byel radioactive waste ip. M.

from storage lagoons at its Wood River Junction, Rhode Island facility on

[}

the basis that solidification might not be an acceptable disposal method to the Department of Energy if and when that agency agrees to assume re-

"=

sponsibility for disposal of UNC's waste as requested by the company under m

provisions of P.L.96-573.

pi We can find no merit to the company's reasoning and arguments in this matter and believe any further delays in the removal of waste material

~.3$

from the lagoons for proper packaging and disposal to be both unwarranted and unconscionable. As you are doubtlessly aware, waste storage lagoons at the Wood River Junction site have leaked in the past and are the source of persistent groundwater contamination. The State of Rhode Island cannot, Fi therefore, accept as reasonable or justified any action or inaction by hb+;:

the United Nuclear Corporation which wou7d result in postponement of the

[i yr.==

scheduled late July beginning of sludge removal and solidification.

1.

mm

=3 I am confident that the Nuclear Regulatory Corraission will come to a like c nelusion and take all necessary steps to ensure that the delays proposed by the company are not tolerated.

=

I will look forward to your early response.

i5 Sincerely,

/

i=M"'

. = = = =

([.JsephGarrahy

"" ~ "

YOV" NOR Ef._...

C.5?I

' '

r=

.s.-~~.-

am-

- %.c :.g. g.;.7m:m, " " - ' -

.. a ce.

.m,,,,,.,

r=

==

==

7.
;;;.
  • ~ ~ ~ ^ " ' "

0108280273 810807 1

PDR COMMS NRCC CORRESPONDENCE PDR

-