ML20010D212

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-028/03L-0 & 81-031/03L-0
Date released: 01/24/2020 Download: ML20010D212


LER 81-031/03L-0:on 810718,pressurizer Level Indicators LI-459,460,461 & 462,pressurizer Heaters,Wide Range RCS Pressure Channel PT402,pressurizer Pressure PT-455 & 456,RCS Pressure PT402 & Subcooling Monitors Input Inoperable
ML20010D226
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/18/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010D226 (2)
LER 81-028/03L-0:on 810717,main Control Board Steam Flow Indicator of FT-474 Instrumentation Loop Failed High.Caused by Transmitter Vent Pipe Break Due to Use of Oversized Valve in Sensing Line.Lighter Valve Installed
ML20010D218
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/18/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010D218 (1)
Forwards LERs 81-028/03L-0 & 81-031/03L-0
ML20010D211
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/18/1981
From: Clayton F
ALABAMA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010D211 (1)