ML20010C890
| ML20010C890 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/20/1981 |
| From: | Hoefling R NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | Perry S Federal Emergency Management Agency |
| References | |
| ISSUANCES-OL, NUDOCS 8108210177 | |
| Download: ML20010C890 (1) | |
Text
.g fDN 4
nr 3 fib'2!
I~
M /M 2 019816-f S**' W ##^"
rusust 20, 1981 A
bOh,-
Spence W. Perry, Esq.
~
Acting Assistant reneral Counsel Federal Enersency riz.nagerent Agency 500 C Street, SU Washington, DC 2CC01 In the t'atter of Southern California Edison Conpany, et al.
(San Cnofre nuclear Generating Station, Units 2 and 3) recket Nos. 50-361 OL, 50-3r;2 CL 1
Dear !:
- r. Perry:
Lith respect to the two recent additional contentions adnitted into the proceeding, i.e., EPZ size detemination and earthquake considerations, FEMA testi. cony should be developed expeditiously to remit presentation at the upconing hearing sessions. The l'EC Staff is targeting Septerber /.,1931, as the filing cate for its testinony in these areas. L'c should be in a position to apprise the Coard of our filing dates at the beginnine of next s.eek's session.
The Applicants have requested certification of the Licensing Loard's Ordce of August 7,1931, regarding consideration of earthquakes in connection with energency plenning.
However, to assure that FENA and the fiRC Staff are in a position to proceed on this issue should this avenue of appeal fail, efforts to prepare testirony should ;.roceed, consisten* uith the above filing date.
Dist Sincerely, NRC Central Shapar/Engelhardt Chri stenbu ry/Scinto Rutberg Richard }:. Poeflino 7
Vogler Counsel for NRC Staff D90 Chandler Hoefling S
Itassell jO Chron 8108210177 810820 PDR ADOCK 05000361 FF(2)
G PDR Friiraglia HRood
,j[
wk/-
OELD OELD
- " ' ~ mmmur 8../. 20../.8.1....g.
.u-,
8../. 2. 0../. 81 om>
Nnc ronu ais oo em nscu ma OFFICIAL RECORD COPY usaro. mi-m m