ML20010C465

From kanterella
Jump to navigation Jump to search
Forwards LER 81-049/03L-0
Date released: 01/24/2020 Download: ML20010C465


LER 81-049/03L-0:on 810714,testing Following Reactor Trip Revealed That MSIV 33,35,36 & 37 Lifted at Less than Required Setpoint.Caused by Setpoint Drift.Valve lift-reseat Setpoints Reset
ML20010C467
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/12/1981
From: Charles Brown
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010C467 (2)
Forwards LER 81-049/03L-0
ML20010C464
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/12/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010C464 (1)