Forwards IE Insp Repts 50-454/81-08 & 50-455/81-07 on 810707-10 & Notice of Violation
ML20010C332
Person / Time
Site: Byron  
Issue date: 08/07/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20010C333 List:
References
NUDOCS 8108190359
Download: ML20010C332 (2)


See also: IR 05000454/1981008

Text

t

. .

.,

.

...

.

AUG 0 7 C

~

'

s

,g

\\

- @kV@h

I.Y

Docket No. 50-454

Docket No. 50-455

T

g

<V

,Il

Commonwealth Edison Company

P

jx

f

  • y

9'

ATTN:

Mr. Cordell Reed

Vice President

D.

Post Office Box 767

gM

'

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. N. Gardner,

R. S. Love, R. B. Landsman and J. F. Norton of this office on July 7-10, 1981,

of activities at Byron Station, Unit I and 2, authori2 ed by NRC Construction

Permit No. CPPR-130 and No. CPPR-131 and to the discussiv.1 of our findings with

Mr. G. Sorensen and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspectioe. Within these areas, the inspection consisted of a selective

examination o_ procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requittments, as specified in enc.osed Appendix A.

A

written respons?, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room

If the enclosures contain any

informati m that you or your contractors believe to be exempt from ..

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days frcm the date of this letter a written application

to this office to withhold such information.

Section 2.790(b)(1) requires

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

TGo/

.s

/ /

8108190359 810807

PDR ADOCK 05000454

G

PDR

r -

.

.

.

.

Commonwealth Edison Company

-2-

AUG 0 ? Igat

to be withheld, and which contains a full statement of the reasons on the

basis which it is claimed that the informatioa should be withheld from

public disclosure.

This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, e copy of this letter,

the enclosures, and your response to this letter will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosures:

1

!...pendix A, Notice

of Vioiation

2.

IE Inspection Report

No. 50-454/81-08 and

No. 50-455/81-07

cc r/encls:

Louis 0. DelGeorge

Director of Nuclear

Licensing

Gunner Sorensen, Site

Project Superintendent

V. I. Schlosser,

Project Manager

R. E. Querio, Station

Superintendent

DMB/ Document Contorl Desk (RIDS)

Mary Jo Murray, Office of

Assistant Attorney General

Myron M. Cherry

RIII

RIII

II

RIII

TI

RIII

RIII

RIII

k

Git <>

dd'h) y'

it a

n

k af

Sp ::;rd Norelius

Gardner/jp Love

dsman NIfon

i liams

j{

8/3/81

e'

8#Nm

/