ML20010B625

From kanterella
Jump to navigation Jump to search
Forwards LER 81-025/03L-0
ML20010B625
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/05/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20010B626 List:
References
NUDOCS 8108170353
Download: ML20010B625 (1)


Text

.

'

  • ppa l LEE A & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, n ichigan 49tM /

g' l 4198g August 5,1981

\h g g Mr. J.G. Keppler, Regional Director #M l

Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

Pursuant to the requirements of the Appandix A Technical Specifications, the following report /s are submitted:

R0 81-025/03L-0.

Sincerely,

  • 4r D.V. Shaller Plant Manager

/bab cc: J.E. Dolan R.S. Hunter R.W. Jurgensen -gg/M R.F. Kroeger K.J. Vehstedt jf /f i/

E. Swanson/N. DuBry R0:III R.C. Callen MPSC G. Charnoff, Esq.

J.M. Hennigan W. Lavallee EPRI PNSRC J.F. Stietzel E.L. Townley Dir., IE (30 copies)

Dir., MIPC (3 copies) 8108170353810805l DR ADOCK 05ooo 0 1981