ML20010B370

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-354/81-10 & 50-355/81-10 on 810618,19 & 22-26 & Notice of Violation
ML20010B370
Person / Time
Site: Hope Creek  
Issue date: 07/31/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Martin T
Public Service Enterprise Group
Shared Package
ML20010B371 List:
References
NUDOCS 8108140413
Download: ML20010B370 (2)


See also: IR 05000354/1981010

Text

. * ,

.

.

JUL 311981

Dockat Nos. 50-354

,7

50-355

W

~

/g\\

Public Service Electric & Gas Company

Q

'

ATTN: Mr. T. J. Martin

g

'

Vice President

J-

-3

Engineering and Construction

.I

N l 319g 4

~

80 Park Plaza - 17C

3; "8 g

g

Newark, New Jerse) 07101

4

Gentlemen:

8

Subject:

Inspet. tion Nos. 50-354/81-10; 50-355/81-10

.

This refers to the routine safety inspection conducted by Mr. R.A. McBrearty

of this office on June 18, 19, 22-26, 1981 at Hancocks Bridge, New Jersey

of activities authorized by NRC License Nos. CPPR-120 and CPPR-121 and to

the discussions of our findings held by Mr. S. Chaudhary and Mr. McBrearty

with Mr. A.E. Giardino of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was nct conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of

noncompliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980. You are required to

respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's ragulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document.

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your int tion to file a

equest for withhol

ng;

R1:DE

tyM R1:DETI

K1 ETI

-R

R1: . PI

McBrearty/wb

Chaudhary

Tripp

Greenman

Ke mi

7/23/81

7/22/81

7/22/81

7/23/81

7/J /81

0FFICIAL RECORD COPY

/

~

~

8108140413 810731

PDR ADOCK 05000354

_G

PDR

,

l_

.

.,

.

,

..

Public Service u ectric & Gas Company

2

M 3 I 1%I

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information. Consistent wit' section

2.790(b)(1), any such application must be accompanied by ar .ffidavit

executed by the owner of the information which identifies tne document or

part sought to be withheld, and which contains a full statement of the

reasons or the basis which .it is claimed that the information should be

withheld from public disclosure. This section = further require s the statement

to address .with specificity the considerations listed in 10 CTR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of-the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room. The telephone notification of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

/

n.q. 4

-

R.R. K imig, Chief, Proje ts

Branch #2, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Number 50-354/81-10; 50-355/81-10

cc w/encis:

J. Boettger, General Manager, Corporate QA

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Jersey

bcc w/encls:

Region I Docket Room (with cincurrences)

NRC Resident Inspector

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

-

-

-

-

- - - -

-

. .

. -

.

--

-

.