ML20010B034

From kanterella
Jump to navigation Jump to search
Forwards LER 81-027/03L-0
Date released: 01/24/2020 Download: ML20010B034


LER 81-027/03L-0:on 810714,during Test,A Train Penetration Room Filtration Sys Was Declared Inoperable When Associated Fan Damper Failed to Open.Caused by Faulty Solenoid Valve. Valve Replaced.Sys Returned to Svc
ML20010B036
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/06/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B036 (1)
Forwards LER 81-027/03L-0
ML20010B033
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/06/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B033 (1)