ML20010B032

From kanterella
Jump to navigation Jump to search
Forwards LER 81-045/03L-0
Date released: 01/24/2020 Download: ML20010B032


LER 81-045/03L-0:on 810710,during Routine Shutdown Operation,Reactor Bldg Pressure Indicator BS-17-PI Was Inoperable.Caused by Instrument Drift.Instrument Recalibr. Mod Is Being Developed for Transmitter Replacement
ML20010B035
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/04/1981
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B035 (2)
Forwards LER 81-045/03L-0
ML20010B031
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/04/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B031 (1)