ML20010B023

From kanterella
Jump to navigation Jump to search
Forwards LER 81-113/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010B023


LER 81-113/03L-0:on 810706,main Steampressure Transmitter Inadvertently Isolated Resulting in Channel Being Declared Inoperable.Caused by Misunderstanding in Telcon Re Instruments Needing to Be Isolated
ML20010B026
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/05/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B026 (1)
Forwards LER 81-113/03L-0.Detailed Event Analysis Encl
ML20010B022
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/05/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B022 (2)