ML20010A901

From kanterella
Jump to navigation Jump to search
Forwards LER 81-116/03L-0
Date released: 01/24/2020 Download: ML20010A901


LER 81-116/03L-0:on 810709,safety Injection Sys Train B Was Declared Inoperable Due to Centrifugal Charging Pump Discharge Line That Would Not Cycle.Caused by Mixture of Oil & Water in Gear Case of Valve
ML20010A904
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/07/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010A904 (1)
Forwards LER 81-116/03L-0
ML20010A900
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/07/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010A900 (1)