ML20010A857
| ML20010A857 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/16/1981 |
| From: | Mike Williams Office of Nuclear Reactor Regulation |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20010A856 | List: |
| References | |
| NUDOCS 8108130024 | |
| Download: ML20010A857 (1) | |
Text
+f STATES NUCLEARf ATORY COMMISSION e
n 3g jj 50-2'l 3 m
m.o.c.2csss Y<
p$
sly 16, l. 31
~
ME"0Rt.NDUM FOR:
Thomas A. Ippolito, Chief Operating. Reactors Branch #2 Division of Licensing FROM:
"liark H. William's, Project !!anager Operating Reactors Branch f2 Division of i.icensing
SUBJECT:
NOTICE OF MEETING WITH THE BOSTON EDISON COMPANY REGARDING (BECo.) CORE. PRAYJSPARGER CRACKS J
a DATE AND TIME:
July 30,1981-10:00 a.m.
LOCATION:
P-110
/
PURPOSE:
Tc evaluat.e the BECo. proposal to operats through Cycle C_
with cracks in the core spray sparger.
PARTICIPANTS:
NRC BECo.
K. R. Wichman ORAB C. Y. 'Cheng
- ORAB, J. Keys H. O Connor R. K. Frahm ORAB J. Nicholson G. R. Mazetis RSB F. Fawlari S. S. Pawlicki Mt. EB J. Gossnell W. S. Hazelton Mt. EB Joe dollins 01E W. Cooper Telepyne Q
4.
c rvQ Mar'k H. Williams, Project Manager Operating Reactors Branch f2 Division of Licen' sing s
r 8108130024 810806' PDR ADOCK 05000293 P
_a
DosTot4 EDISONCOMPANY
' ObODE l OtwtaAL OFF 6CES SQQ SOTLgYg D
A. V. M O RtBI OSTOM, Mate 4CMunstTs Oj ed $Yaggt t99 HUCLEAR, PCRATIONSMANAGCR SUPPORT DEPARTMENT s
July 14, 1981 BEco. Ltr. #81-160 Operating Reactors Branch #2Mr. Thomas A. Ippolito, C Division of Licensing Office of Nuciear Reactor Reg l
'J.S. Nuclear Regulatory Comissi u ation Washington, D. C.
on 20555
/
License No. OPR-35
_P_eguest For a Meetin( Docket No. 50-293 e
ear Sir:
Since Boston Edison Company fi sparger General Electric Company in that Pilgrim Nuclear Power Stationrst re during Cycle 6 manufacturing efforts necessary t we have been actively involved withn the co e planning,, design work, tooling d o replace the core spray for powerevelopment and However as a perform, independent sparallel effort, Tele operation Engineering Services, tress analyses o!yne Engineering Services was of these studies and analyses and Inc. to perfornt fracture mechanif the sparger indications contracted to video tape of our 1980 refueling with the aid of an improved imagecs studies.
, an
= 200.,
need to replace the core spray spaG.E., Teledyne and Ap Is a result outage inspections, subsequently revi enhanced provided.for,its operability th rough Cycle 6rger at this time as adeo'Jate ewed by We would appreciate the oppo t ere is no ssurance can be find outage. al inspection and testing to be perfor tion acceptance criteria foryour staff, our e
fac.cs of our presentationTo icconmodate' the appropriat uring our upcoming refueling we req'uest a meeting date on eithee c ntra 1981.
appreciate confirmation at youShould one of these, dates be e different acceptable to yo r July 30 or' 31, r earliest convenience.u and your staff, we would Very truly yours, m,.
e l'u N
- __