Recommends Confirmation of NRC Position That Ansi/Ans 3.1 Applies to Util Personnel,Per Rf Heishman 810623 Memo to El Jordan
ML20010A758
Person / Time
Site: LaSalle 
Issue date: 07/15/1981
From: Harpster T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20010A756 List:
References
NUDOCS 8108120181
Download: ML20010A758 (1)


Text

_

&c/os w'

,:.uc y.'f.

(C.

UNITED STATES

,. ( 7 h '

NUCLEAR REGULATORY COMMISSION g

  1. O W ASHINGTON. D. C. 20555 s ?~gg[j.j 3

l g '.v JUL 1513Q

~

~

Docket 50-373 I

MEMORANDUM FOR:

A. Schwencer, Chief, Licensing Branch 2, Division of Licensing, NRR FROM:

T. Harpster, Chief, Reactor Projects and Resident Inspection Branch, DRRRI, IE

SUBJECT:

STAFFING FOR LASALLE NUCLEAR STATION The enclosed memoranda, Heishman to Jordan, dated June 23,1981, and Walker to Reimann, dated May 27, 1981, describe a situation which s

we believe warrants NRR action.

We recognize that the original SER evaluation of plant staffing was performed in 1978, and that it is not. feasible to continuously reevaluate all prior reviews.

The TMI Lessons Learned have, however, necessitated some retrofit action.

We believe that this matter falls within that envelope. We have reviewed the licensee's submission in Section L.7 of A..dment 54 to the LaSalle FSAR. We concur with Roger Walker, the resident ingector, that the submission does not adequately address the concerns ot' the joint NRR/IE inspection team as documented in IE Inspection Report LO-373/80-41 The inspection team used the " Draft Criteria for Utility Maiagement Structure and Technical Competence," which has since been imposed on licensees and' references ANSI /ANS 3.1 - 1979, as the acceptance criteria for its inspection.

Accordingly, we reconmend that you co.ifirm the NRC position that ANSI /ANS 3.1-1979 applies to LaSalle and secure from the licensee an FSAR commitment to ANSI /ANS 3.1 and a revision to Section L.7 which resolves the NRR/IE team concerns.

f

/0 p( A s

c T. L. Harps Sr, Chief l

Reactor P ects and Resident Inspecti n Branch Division of Resident and Regional Reactor Inspection, IE t

. Enclosures :

' 1.

Memo, Walker to Reimann 2.

Memo, Heishman to Jordan 3.

Section L.7 of LaSalle FSAR 4.

Inspection Report 50-373/80-41 8108120181 810803 1 CONTACT:

J. B. Henderson, IE PDR ADOCK 05000373-49-24872 A