ML20010A671

From kanterella
Jump to navigation Jump to search
Amend 44 to License DPR-66,revising Tech Specs to Eliminate Containment Purge Exhaust & Supply Valve Isolation Time Requirement for Modes 1,2,3, & 4 Operation
ML20010A671
Person / Time
Site: Beaver Valley
Issue date: 07/29/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20010A672 List:
References
NUDOCS 8108120012
Download: ML20010A671 (4)


Text

- _,

d RfC

'o UNITED STATES y

y g".n

. -j NUCLEAR REGULATORY COMMISSION g~

,; C WASHINGTON, D. C. 20555

\\.

l DUQUESME LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-334 BEAVER VALLEY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE-Amendment No. 44 License No. DPR-66 1.

The Nuclear Regulatory Commission'(the Commission) has found that:

A.

The application for amendment by Duquesne Light Company, Ohio Edison Company, the Pennsylvania P6wer-Company, (the licensees) dated July 2 9,1981, conplies with the standards and requirements of the

- Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 2

i B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;

.i C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health t

and safety of the public, and (ii) that-such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common I

defense and security or to the health and safety of the public; j

and j

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

).

.1 I

I l

?

?

.i h

t c'PDR ADOCKB10812OO12 ' 810729",

e 05000334 P

pm

,w..

+

,w

.._.y c

r - ~.

.n. - -

W

~

-2.-

2.

Accordingly, the license is amenced by changes' to the Technical.

. Specifications as indicated in the attachment = to'this license-amendment, and paragraph 2.C.(2) of Facility Operating License

~

No.- DPR-66 is hereby amended to read as follows:

(2)

Technical

.ci fications

'The Technical Specifications contained in Appendices A and B, as. revised through Amendment No. 44, are hereby incorporated in the license. The licensee shall-operate the facility in accorcance with the Technical Specifications.

3.

This license amendment is effective as of the cate of its issuance.

r?R THE NUCLEAR REGULATORY C0KNISSION h

td.

' N.)ven n].arga, Chijf Operating Reactors Svanch =l Division of Licensing Attachme nt:

Changes to the Technical Specifications Date of Issuance:

July 29,1981 4

M

F o

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT 90. 44 TO FACILITY OPERATING LICENSE NO. OPR-66 DCCKET NO. 50-534 Revise Appencix A as folicws:

Remove Pages Insert Pages 3/4 6-19c 3/4 6-19c

.e e

I 1

v

i TABLE 3.6-1 (Continued) mg ISOLATI0tl TIME-

s,

_ VALVE NUMBER TESTABLE DURING (Sec) u INSIDE/0UTSIDE furlCTION PLANT OPERATION INSIDE/0UTSIDE p_

. C.

Containment Purge and Exhaust O

'1.

VS-D-5-3B VS-D-5-3A Containment Purge Exhaust No 8(i>)

8 (1) -

2.

VS-D-5-5B VS-D-5-5A L,ntainment Purae Supply No 11 (-1) 8 (1) c=

3.

VS-D-5-6 Containment Purae Vacuum Breaker No N/A N/A q

D.

Manual p

s g

1.

ICll-181 MOV-CH308A Seal Injection Water to RC Pump No N/A. N/A n

2.

1C11-182 MOV-Cll3088 Seal Injection Water to RC Pump No N/A N/A 3.

ICH-183 MOV-Cll308C Seal Injection Water to RC Pump No N/A N/A

  • 4.

MOV-CH142 Reactor Coolant System Letdown Yes.

N/A N/A

  • 5.

MOV-CCll2B3 1CCR-252 CCW from RilR lix & RilR Pump Seal Coolers Yes N/A :N/A-

  • 6 MOV-CCll2A3 1CCR-251 CCW from RilR lix & RilR Pump Seal Coolers Yes N/A N/A
  • 7.

MOV-CC112A2 1CCR-247 CCW to RHR lix & RHR Pump Seal Coolers Yes N/A N/A y

  • 8.

M0V-CC11282 1CCR-248 CCW to RilR lix % RHP Pump Seal Coolers Yes N/A N/A g

  1. 9.

MOV-FH-151A Auxiliary Feedwater Yes N/A N/A

  1. 10.

M0V-FW-151 B Auxiliary Feedwater Yes N/A N/A g

  1. 11.

MOV-FW-151 C Auxiliary Feedwater Yes N/A N/A

  1. 12.

MOV-FW-151 D Auxiliary Feedwater Yes n/A N/A-g

. #13.

MOV-FH-151E Auxiliary feedwater Yes N/A N/A 4

  1. 14.

MOV-FW-151 F Auxiliary Feedwater Yes N/A N/A 7

  1. 15.

MOV-RW104A Riverwater to Recire. Spray lix Yes

.N/A N/A

  1. 16.

MOV-RW104C Riverwater to Recire. Spray lix Yes N/A N/A yw:

  1. 17.

MOV-RW104B Riverwater to' Recirc. Spray llX Yes N/A N/A g

  1. 18.

MOV-RW104D Riverwater to Recric. Spray lix Yes N/A. N/A (1) Applicable in modes 5 & 6 only.

The provisions of specification 3.0. 4 are not applicable. The Containment Purge Exhaust and Supply valves will be locked shut during operation in modes 1, 2, 3 and 4 W4?em=-g g e e - s-1 wg-wp--Wv' vv6rwtm e+--Wy1y-3p-w&Wg-

+ ate==P 1-~-*

O-gr-T-'wNw'7Tp1--N=Nt wwgy N m

+-~fTF w

m-P $

--+y0' - - ' -

=vTw e-e9 99'*

    • M v'i-3 gm-Tue r

ha-+i

- gr

-dr-'g

-1y y

s e'vg y

yW,_y

-