ML20010A574

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-389/81-10 on 810616-19.No Noncompliance Noted
ML20010A574
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/22/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20010A575 List:
References
NUDOCS 8108110563
Download: ML20010A574 (2)


See also: IR 05000389/1981010

Text

_

q.

.

.

JUL 2 21981

<s

in

2

%

Florida Power and Light Company

7

ATTN: Dr. R. E. Uhrig, Vice President

g2

-

g* g'019g7 A

Advanced Systems and Technology

l

P. O. Box 529100

g

"g% *

Miami, FL 33152

s

Gentlemen:

g\\

subject: Report No. 50-389/81-10

This refers to the routine safety inspection conducted by Mr. N. Ecc iomos of this

office on June 16-19, 1981, of activities authorized by NRC Construction Permit

No. CFPR-144 for the St. Lucie facility and to the discussion of our findings

held with Mr. B. J. Escue, Plant Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previcusly identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessarj that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be~ accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, and a full

statament of the reasons on the basis of which it is claimed that the information

should be withheld from public disclosure. This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790-

(b)(4). The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit. If we do not hear from you in

this regard within the specified periods noted above, the report will be placed

in the Public Document Room.

kDO

OobO$89)

[St (

D

G

PDRi

.

.

-

-

- -

-.

V

f-

.

.

Florida Power and Light Company

2

JUL 2 21981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

P. J. Kellogg, Acting Chief

Reactor Projects Branch #2

Division of Resident and

Rt. actor Project Inspection

Enclosures:

Inspection Report Nos. 50-389/81-10

cc w/ encl:

B. J. Escue, Plant Mar.ager

N. Weemt, Assistant QA

Lonstruction Manager

bec w/ encl:

NRC Resident inspector

Central Files

Local Public Document Room

Washington Public Document Room

Nuclear Safety Information Centar

Technical Information Center

Document Management Branch

State of Florida

RII

-

RII

RII

RII \\fn

rih [/

RII

chf$os:ht

C G&

QV

W'

(1

J

NEcono

4ARHerdt

MEMurphy

AFGibson

MShymlock

PJ K.

g~

7//f/81

7/so/81

7/u/81

7/ /81

7/pl /81

7/

1

- - - - -- --- --

--

-- -- -

-

- - - - -

-

- - - - -

- - - - - .