Forwards IE Insp Rept 50-271/81-10 on 810504-07 & Notice of Violation
ML20010A564
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/28/1981
From: Snyder G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20010A565 List:
References
NUDOCS 8108110547
Download: ML20010A564 (3)


See also: IR 05000271/1981010

Text

-

.

.-

s

..

<

2% JUL 193i

Docket No. 50-271

cnN

'

Vermont Yankee Nuclear Power Corporation

/q/

,

.

ATTN:

Mr. Robert L. Smith

gII

q

. N 'ss-

g

s

Licensing Engineer

-

-

v

h

1671 Worcester Road

% HW L

.

i)

Framingham, Massachusetts 01701

AUG 101981* T2

%, " "commmT'"' 8/

Gentlemen:

Subject:

Inspection 81-10

4

to

This refers to the routine inspection conducted by Mr. J. .

of this

office on May 4-7, 1981 at Vermont Yankee Nuclear Power Station, Vernon,

Vermont of activities authorized by NRC License No. DPR-28 and to the

discussions of our findings held by Mr. Jang with Mr. W.P. Murphy and

others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

In addition, our Mobile Laboratory was also brought to your site and used

by the inspector to make certain independent measurements. The basic

purpose of these independent measurements is to verify your capability for

analyzing radioactive effluents, and to achieve and maintain comparable

methods of analyses between your facility and the NRC.

The complete data

from these measurements will be reported in a subsequent Inspection Report.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of

noncompliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You are required to

respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790 cf the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

TBNPSB

B

(hang /wb

yB c

f--

DEP&OS

3

s

y

Snyder

J

f 5/21/81 7-M I

7 lb d

7-28-8/

[s

OFFICIAL RECORD COPY

-

8108110547 810728

PDR ADOCK 05000271

0

PDR

- -- - .

-

.

.-

.

-

-

1

.

.

.

1

Vermont Yankee Nuclear Power Corporation

2

2% RM

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days from the date of this letter a written

application to this office to withhold such information.

Consistent with

section 2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

!.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room. The telephone notification of your

intent to request withholding, or any request for an extension of the 10

,

day period which you believe necessary, should be made to the Supervisor,

'

Files, riail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

,

Sincerel ,

6

d

Ga y L. Snyder, Chief, Emergency

Preparedness and Program Support

Branch, Division of Emergency

Preparedness and Operational

'

Support

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 81-10

cc w/encis:

Mr. Warren P. Murphy, Plant Superintendent

Mr. W. F. Conway, Vice President and Manager of Operations

Mr. J. E. Griffin, President

Mr. L. H. Heider, Vice President

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

State of Vermont

OFFICIAL RECORD COPY

...

.

- - . - .

.

.

.

Vermont Yankee Nuclear Power Corporation

3

2 7, jgt 1931

bec w/encls:

Region I Document Room (with concurrencu )

NRC Resident Inspector

Chief, Operational Support Section (w/o encis)