_ __ _ . ~ . . __ . . _ .

1 BEFORE THE i UNITED STATES NUCLEAR REGULATORY COMMISSION i

l i

f I

In the Matter of .

Docket Nos. 50-277 P:lILADELPHIA ELECTRIC COMPANY  : 50-278 APPLICATION FOR AMENDMENT OF PACILITY OPERATING LICENSES

! DPR-44 & DPR-56 l

l Edward G. Bauer, Jr.

Eugene J. Bradley 2301 Market Street Philadelphia, Pennsylvania 19101 l

Attorneys for Philadelphia Electric Company I

t 8108110419 810807' L PDR ADOCK 05000277, p PDRj l

L _ _ _ _ _- _ _ _ __ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ __ . - _ _ _ _ _. . -__ _ - _ .:

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 PilILADELPl!IA ELECTRIC COMPANY  : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Philadelphia Electric Company, Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Atomic Power Station Units No. 2 and 3, hereby requests that the Technical Specifications incorporated in Appendix A of the Operating Licenses be amended by revising a section as indicated by a vertical bar in the margin of attached page 5.

r l

The changes to the Technical Specifications are being requested to correct several technical errors and to simplify the definition for Refuel Mode. The errors appear to be the result of an oversight in the original preparation and issuance of the Peach Bottom Operating Licenses.

The requirement that the Source Range Monitors indicate at least three counts per second before a control rod may be withdrawn has been deleted since this requirement does not only apply to the Refuel Mode and is still covered by a Limiting condition of Operation specified in section 3.3.B.4 of the Technical Specifications.

The statement in the definition that only one control rod may be withdrawn when "...the refueling crane is not over rhe reactor;..." has been deleted since with certain restrictions a control rod may be withdrawn while the refueling crane is over the reactor as specified in Section 7.6.3.h of the FSAR.

The statement in the definition that "...the main steam line isolation scram and main condenser low vacuum scram are bypassed if reactor pressure is below 1055 psig." is not unique t

to the refuel mode and has been deleted.

Pursuant to 10 CFR Section 170.22, Philadelphia Electric Company, for fee purposes, proposes that the Application for Amendment be considered a Class II Amendment for Unit 2 and a Class I Amendment for Unit 3, since the proposed changes are deemed to be administrative in nature.

The Plant Operation Review Committee and the Operation and Safety Review Committee have reviewed these proposed changes to the Technical Specifications, and have concluded that they do not involve an unreviewed safety question or a significant hazards consideration, and will not endanger the health and safety of the public.

Respectfully submitted, Vice Pr'sidenA e 4

e COMMONWEALTH OF PENNSYLVANIA  :

ss.

COUNTY OF PHILADELPHIA  :

S. L. Daltroff, being first duly sworn, deposes and says:

That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the foregoing Application for Amendment of Facility Operating Licenses and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belle;.

Subscribed and sworn to before me this Dd day of T

dkIt tary Pub:.i e-

. Ett 'DdTH H. BOkE

. bhe, Phila , Phila.

My Commesion Expires Jan. 341983

  • ?

CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R. Steele, Chairman of the Board of Supervisors, R.D. No. 1, D61ta, Pennsylvania l'l314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to George K.

Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Wilmer P. Bolton, Chairman of the Board of Supervisors, R.D. No. 1, Holtwood, Pennsylvania 17532; all this day of 1981.

[w4 I n/u m;

/ Eugene J. Bradley Attorney for Philadelphia Electric Company 4