ML20010A412
| ML20010A412 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/29/1981 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8108110406 | |
| Download: ML20010A412 (1) | |
Text
b 5
O k
)
U*,*;,,,
INDIANA & MICHIGAN ELECTRIC COMPANY y
3; }
i
'Q DONALD C. COOK NUCLEAR PLANT P.O. Box 458 Bridgman, Michigan 49106 gy G 1 Q 193l >",-
(616) 465-5901 7c,g
,g
,(c" '"
- G.
July 29, 1981 h/j
,7/'
- L ':-
Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regule. tory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
This is to confirm our verbal report to Mr. E.R. Swanson, NRC Region III Inspector, on July 29,. 981, at 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br /> at which time we reported that we have a shim plate and some support shims missing from the #12 Reactor Coolant Pump.
A followup report will be submitted by August 11, 1981, as required by Technical Specification Section 6.9.1.8.i.
Sincerely, D.V. Shaller Plant ifanager
/bab cc:
J.E. Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger K.J. Vehstedt E. Swanson/N. DuBry R0:III R.C. Callen ItPSC 7p>
J.M. Hennigan 3
W. Lavallee EPRI j
PNSRC
/ /p J.F. Stietzel E.L. Townley Dir., IE (40 copies)
Dir., f1IPC (4 copies) 8108110406 810729 DR ADOCK 05000315
'AUG 3 198j
\\