ML20010A387
| ML20010A387 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 06/16/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20010A381 | List: |
| References | |
| NUDOCS 8108110383 | |
| Download: ML20010A387 (2) | |
See also: IR 05000389/1981009
Text
' . .
OFFICIAL COPY
- g49'o
c;jipp
-
i
UNITED STATES
'
[E
NUCLEAR REGULATORY COMMISSION
e
REGION 11
r [e
- . -
101 MARIETTA ST., N.W.. SUITE 3100
o,
%./
b
ATLANTA, GEORGIA 30303
o
+....
JUN 161981
Flooida Power and Light Company
ATTN:
Mr. R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100
Miami, FL 33152
,
Gentle nen :
Subject: Report No. 50-389/81-9
This refers to the routine safety inspectten conducted by Mr. T. D. Gibbons of
this office on May 12-15, 1981, of activitie; authori:ec by NRC Construction
Permit No. CPCR-144 for the St. Lucie facility.
Our preliminary findings were
discussed witn Mr. B. J. Escue, Plant Manager. at the conclusion of the inspec-
t i o n, .
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your licase
appear to violate NRC requirements.
This item and references to pertinent
requi, aments are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response ara delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy this
letter and the enclosed report will be placed in the NRC's Pub 1fc Docum
Room.
If the report contains any information that you believe to be exempt from
asclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telaphone within tei days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five. days from the date
nf this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this. office promptly so that a new
due date ;nay be established. Consistent with section 2.790(b)(1), su h applica-
tion must be accompanied by an af'idavit executed by the owner of the information
.
'
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4).
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
81081103s3 s10733
PDR ADOCK 05000389
O
PDR-
-
.-
.
,a
.
JUN 161981
Florida Power and Light Company
2
Should yuu have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
$ [.
p
R. C. ' ewi s, Acting Director
Division of Resicent and
Reactor Project Inspection
Enclosuias:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-389/81-9
cc w/ encl:
B. J. Escue, Plant Manager
N. Weems, Assistant QA
Construction Manager
s
L
-