ML20010A276

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-306/81-16 on 810713-14.No Noncompliance Noted
ML20010A276
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 07/29/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML20010A277 List:
References
NUDOCS 8108110269
Download: ML20010A276 (2)


See also: IR 05000306/1981016

Text

r

u

.

.

' Jill 2 9 1981

s$b/h

fg

^'

Docket No. 50-306

V

.

-

\\

Northern States Power Company

pi

-

ATTN:

Mr. Dennis E. Gilberts

7-f

. J 01

~

Power Supply

d, u.s D s! @ '088by

Sr. Vice President

414 Nicollet Mall

el

Vr/

/

Minneapolis, MN

55.'l

'{1I

N

9

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. L. Robinson

of this office on July 13-14, 1981, of activities at Prairie Island Nuclear

Generating Plant, Unit 2, authorized by NRC Operating License No. DPR-60 and

to the discussion of our findings with Mr. Tierney and others at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of thic inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the. owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

f

l

'8108110269 010729

(8(

7-

m

.

-

--

-

-

,.

..

.

.-

Northern States Power Company

-2-

W 2 919W

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

d.k.

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

cc w/ encl:

F. P. Tierney, Jr. ,

Plant Manager

DMB/ Document Cont.rol Desk (RIDS)

Resident Inspector, RIII

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

,

kIII

RIII

RIII

RIII

.

-

'

r

R

n/jp

pes ar

us

0g

7/ 7/ 1

7/

F/

qT

7

f

1 Li

'

. -

-

-

-

-

-

.

-

-

-