ML20010A269
| ML20010A269 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/16/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20010A260 | List: |
| References | |
| NUDOCS 8108110255 | |
| Download: ML20010A269 (2) | |
See also: IR 05000321/1981007
Text
_
.
OFFICIAL COPY
.[ga arc,,k
g
UNITED STATES
.
!*h,.U
%
NUCLEAR REGULATORY COMMISSION
5
i
REGION 11
k
k/[
101 MARIETTA ST., N.W., SUITE 3100
%
~ *y
ATLANTA, GEORGIA 30303
,
%-'
JUN 161981
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
Subject: Report Nos. 50-321/81-07 and 50-366/81-07
This refers to the routine inspection conducted by Mr. D. M. Montgomery of this
office on April 27 - May 12, 1981, of activities authorized by NRC Operating
License No. DPR-57 and License No. NPF-5 for the Hatch facility. Our preliminary
findings were discussed with Mr. T. Greene, Assistant Plant. Manager, at the con-
clusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
The Region II Mobile Laboratory
was also brought to your site and used by the inspector to make certain indepen-
dent measurements.
The basic purpose of these independent measurements is to
verify your capability for analyzing radioactive effluents, and to achieve and
maintain comparable methods of analyses betweer. your facility and the NRC. The
complete data from these measurements will be reported in a subsequent Inspection
Report.
During the inspection, it was found that certain activities under your license
appear to violate NRC requ%ments.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a ccpy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such
information. If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure. This section further
e108110255 810730
PDR ADOCK 05000321
G
.-
- - -
-
.
-- -
- -
.
._.
.
-
. .
.
.
.
JUN 161981
Georgia Power Company
2
requires the statemer
to address with specificity the considerations listed in
The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
1
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
d?:t .
,R. C. Lewis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/81-07 and 50-366/81-07
cc w/ encl:
W. A. Widner, Vice President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
'
C. E. Belflower, Site QA Supervisor
.
,
, , _ , ,
.-
_
..
_.
. . .
. .
.
. . , . _ _
, , - , . . , . . _ . . _ , _ , . . . - - .
, _ .