Forwards IE Insp Repts 50-321/81-07 & 50-366/81-07 on 810427-0512 & Notice of Violation
ML20010A269
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/16/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20010A260 List:
References
NUDOCS 8108110255
Download: ML20010A269 (2)


See also: IR 05000321/1981007

Text

_

.

OFFICIAL COPY

.[ga arc,,k

g

UNITED STATES

.

!*h,.U

%

NUCLEAR REGULATORY COMMISSION

5

i

REGION 11

k

k/[

101 MARIETTA ST., N.W., SUITE 3100

%

~ *y

ATLANTA, GEORGIA 30303

,

%-'

JUN 161981

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

Subject: Report Nos. 50-321/81-07 and 50-366/81-07

This refers to the routine inspection conducted by Mr. D. M. Montgomery of this

office on April 27 - May 12, 1981, of activities authorized by NRC Operating

License No. DPR-57 and License No. NPF-5 for the Hatch facility. Our preliminary

findings were discussed with Mr. T. Greene, Assistant Plant. Manager, at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

The Region II Mobile Laboratory

was also brought to your site and used by the inspector to make certain indepen-

dent measurements.

The basic purpose of these independent measurements is to

verify your capability for analyzing radioactive effluents, and to achieve and

maintain comparable methods of analyses betweer. your facility and the NRC. The

complete data from these measurements will be reported in a subsequent Inspection

Report.

During the inspection, it was found that certain activities under your license

appear to violate NRC requ%ments.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a ccpy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such

information. If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure. This section further

e108110255 810730

PDR ADOCK 05000321

G

PDR

.-

- - -

-

.

-- -

- -

.

._.

.

-

. .

.

.

.

JUN 161981

Georgia Power Company

2

requires the statemer

to address with specificity the considerations listed in

10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

1

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

d?:t .

,R. C. Lewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/81-07 and 50-366/81-07

cc w/ encl:

W. A. Widner, Vice President and

General Manager-Nuclear Generation

M. Manry, Plant Manager

'

C. E. Belflower, Site QA Supervisor

.

,

, , _ , ,

.-

_

..

_.

. . .

. .

.

. . , . _ _

, , - , . . , . . _ . . _ , _ , . . . - - .

, _ .