Interim Deficiency Rept Re Approved QA Program to Only Certain ASME code-related Parts of safety-related Diaphragm Valves,Originally Reported on 810305.Evaluation Underway to Determine safety-related Function of Valves in Question
ML20010A263
Person / Time
Site: Marble Hill
Issue date: 08/03/1981
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S81-05, S81-5, NUDOCS 8108110246
Download: ML20010A263 (2)


Text

'- -

N ji6D 68(& l 0803814072 PUBLIC -

SERVICE s ws INDIANA 6g{ .k S. W. Shields ( AUG l 0 198 *'

Senior Vice President . ,

Nuclear Division k YMg's

~b  ?'

August 3, 1981 , ,

S81-05 "-~i .*

Mr. James G. Keppler, Director Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Commission STN 50-547 Region III Construction Permit Nos.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On March 5, 1981, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During an audit of ITT Crinnell Valve Company, PSI quality assurance personnel determined that ITT Grinnell was applying its PSI approved quality assurance program to only certain ASME Code related parts of safety-related diaphragm valves intended for use at Marble Hill. Further examination indicated that certain other parts of some of these valves may serve safety-related functions and were not handled u.. der a PSI approved quality assurance program.

As discussed in PSI's interim report of April 3, 1981, an engineering evaluation is being conducted to determine the safety-related functions of the valves in question. This evaluation is underway at this time and will be used to determine which parts of each valve must be handled in accordance with 10 CFR 50, Appendix B requirements. Based upon this infor-mation, PSI will determine what correctivt 'ction, if any, is necessary .

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before December 1, 1981.

Ib

/ I 8108110246 810803 cDR i, DOCK 05000546 S PDR P. O. Box 190, New Washington, Indiana (7162 812. 289.1000 AUG 5 1981 J

~

0803814002 1 .

PUBUC SERVICE INDIANA Letter: James G. Keppler August 3, 1981 S81-05 If you have any questions on this matter, please feel free to contact me.

Sincerely, S. W. Shields TDG/mjg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 E. R. Schweibinz, P. E.

J. T. Ilarrison