ML20010A216

From kanterella
Jump to navigation Jump to search
Forwards Affidavit of M Grotenhuis,In Response to ASLB 810728 Order Requesting Info Re Discovery of Void in Containment Wall Adjacent to Equipment Hatch During Preparations for Steam Generator Repair
ML20010A216
Person / Time
Site: Turkey Point  
Issue date: 08/07/1981
From: Goldberg S
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Luebke E, Mark Miller, Paris O
Atomic Safety and Licensing Board Panel
Shared Package
ML20010A217 List:
References
NUDOCS 8108110186
Download: ML20010A216 (1)


Text

-

'y g

y August 7,19dl liarshall E. Miller, Esq., Chairudn Dr. Oscar 11. Paris Adninistrative duoge Acrainistrative Judge Atomic Safety arid Licensing Board Atoaic Safety and Licensing Board a

Panel Panel U.S. huclear Regulatory Cocuission U.S. Nuclear Regulatory Cocnission Wdshington, D.C.

20b00 Washington, D.C.

2055b Ur. Enaeth A. Luebke g

g Aduinistrative Judge Q

Atouic Safety and Licensing board O,.

Panel

/ ?

p

.i T/

$Uu J

U.S. Nuclear Regulatory Cocaission p

Mdshiflyton, D.C.

205b5 j,ls"o 1 O I98I'"~ ~

^

0 In the liatter of

(

u.ogjsI Florida Power and Light Conpariy

?

Turkey Point iluclear Generating Unit Hos. 3 and'g'/ h Docket Hos. 50-250 and 50-251 (Proposed Amendments to Facility Operoting

~ ' -

Licenses to Pernit Stean Generator Repair)

Dear Licensing Board F.eabers:

un July 26, 1981, tne Board issued an Order in the captioned proceeding in which it directed the Applicant and Staff to furnish infonuition concerning the Applicant's discovery of a void in the conteiinicat wall adjacent to the equipnent hatch during preparations for the steam generator repairs. The Board indicated that the discovery of this catter was noted in a July 13, 1981 daily report prepared by the Region 11 Office of Inspection and Enforcecent. The Board expressed a concern over whether this incident was a result of breaching the contointent unich trie Board had understood would not occur in connection with tne steaa generator repairs.

The information requested by the Board is supplied in the attached affidavit of Marshall 6rotenhuis, the HRC Staff project canager for the Turkey Point facility. As explained in this affidavit, the discovery in question did not result fron a breach of the containuent wall, the containnent wall will not be breachec during the steau generator repair, dnd the aaC Region II Office of 1&E was properly apprised of the natter and will ossure that the concrete void is fully ano safely repaired.

Distribution:

507 9

REG Central Files Sincerely,

.s OELD Formal Files (2)

Shapar/Engelhardt

//

Christenbury/Scinto Olmstead/Karman Steven C. Goldberg hb]

Goldberg/Chron Counsel for URC Staff MGrotenhtis

/

,,0Rp,[^),

0 % g..,

,,0gg..k...

omer>

cc:

Service List su ~,ury SCGoldberg:st WTtffstead EChristenbury" *