ML20010A107
| ML20010A107 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/17/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20010A108 | List: |
| References | |
| NUDOCS 8108110075 | |
| Download: ML20010A107 (2) | |
See also: IR 05000348/1981013
Text
..
-
-.
..
.,
,
I
,
.
d
JUL 171981
A
C
fh% .%
Alabama Power Company
b
Jh
h
ATTN:
Mr. R. P. Mcdonald
%9
-
h
G 101981m J
Vice President-Nuclear Generation
P. O. Box 2641
u.s. maa
~
k
- n mawa, @
Birmingham, AL 35291
Gentlemen:
Subject: Report Nos.
[3)nd 50-364/81-17
This refers to the special safety inspection conducted by Mr. J. J. Lenahan of
this office on June 29 - July 2,1981, of activities authorized by NRC License
Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our find-
ings held with Mr. J. D. Woodard, Assistant Station Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
.
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephc'.e within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanted by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement te address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit. If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
,
in the Public Document Room.
.
(i
I
8100110075 810717
PDR ADOCK 05000348
o
-
-
- -
-
-
-
- -
- -
-
-
-
-
-
-
- -
-
- -
- -
..
. . ,
,
Alabama Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
IN<t.
P. J. Kellogg, Acting Chief
Reactor Projects Branch #2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-348/81-13
and t0-364/81-17
cc w/ enc 1:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
R. E. Hollands, Jr. , QA Supervisor
bcc w/ encl:
NRC Resident Inspe: tor
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
State of Alabama
e
RII
RII
RII
RII
RII4
RII
I
QY
CEMurplhy
(#
0p/
JJLenahan:ht
T onlon
AFG1 son
a lee
PJKellogg
7////81
7//7/81
7/ 7 81
7// 81
7/p/81
7/ 7/81
/
/
.