ML20009H506

From kanterella
Jump to navigation Jump to search
RO 50-327/81085:on 810719,during Linkage Interlock Test on Lower Containment Personnel Access Lock,Inner Door Slammed & Bounced Back While Outer Door Was Opened.Caused by Excessive Slack in Door Operating Linkage
ML20009H506
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/29/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-50-327-81085, NUDOCS 8108100193
Download: ML20009H506 (1)


Text

.

i ik;1F 0 , a G ~

p , n, o' "' nn om _ _ n"_______ _ . . . . . _ _ _ _ _ _ _

mow M E  ; ONAL DIRECTOR July 29, 1981 DEPUTY DIRECTOR ASSISTANT TO DIRECTOR DIRECTOR, RRPI U.S. Nuclear Regulatory Commission ~

DIRECTOR, EPOS Region II DIRECTOR, ENF/INV 101 Marietta street, w DIRECTOR, ETI Suite 3100 PUBUC AFFA'R" "'~1 .

Atlanta, Georgia 30303 SQRO-50-327/81085

-kog Reported under Technical Specification 3.6.1.3.a fj yf r Date of Occurrence: 7-19-81 Time of Occurrence: 0710CDT/ ,

N [h (\ ,

Technical Specification Involved: 6.9.1.12.e '

' O 7 I93I

  • 9' O, M ygyrew h Conditions Prior to Occurrence.  % y Unlt 1 in Mode 3 with RCS temperature and pressure at 537'F and M Identification and Description of Occurrence _

During performance of a linkage interlock test on the lower containment l

personnel access lock, the inner door was allowed to slam and bounce back.

j

'Ihe latch closed blocktng the door ajar. The outer door was then opened l violating containe.ent integrity for five seconds per Technical Specification l 3.6.1.3.a. 'Ihis event occurred on 7-19-81 and the required 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> phone call was made, but the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written follow-up was inadvertently not prepared or sent by the Sequoyah Compliance Staff. This omission was discovered on 7-28-81 during preparation of the Licensee Event Report. The Compliance Staff has been reinstructed to perforet a more detailed review of Potential Reportable Occurrences when they are initiated.

~ Apparent Cause_of Occurrence St0 Excessive slack in the door operating linkage allowed the door to bounce back far enough to allow the latch to block it open.

hp A OC OO S

I l _ - __ .. - _ _ _ . __ _

-. . . _ - . . . _ _.