Submits Info in Response to NRC & 810623 & 24 Site Visit Re Environ Rept - OL Stage Review
ML20009H397
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/04/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Houston D
Office of Nuclear Reactor Regulation
References
NUDOCS 8108100059
Download: ML20009H397 (2)


Text

-

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P o Box 5000 m CLEVELAND OHIO 44101 e TELEPHONE f 216) 622 9800 e ILLUMIN ATING BLDG e 55 PUBLIC SoUARE Serving The Best Location in the Nation Dilwyn R. Davidson viCE PRESIDENr August 4, 1981 gJ sysitu cNo'NtcmNo ANo coNsisuctioN r

6.r PIfo

'rj 9

Mr. Dean Houston 9-U. S. Nuclear Regulatory Commission C 0 7193; u.,7 Division of Licensing u.a. semaAs asau4 roe, N

Mail Stop 116 Washington, D. C.

20555

/

Perry nuclear Power Plant Cd N

Docket Hos. 50-440; 50-4h1 Response to Request for ER-OL l

Reference Documents

Dear Mr. Houston:

This letter is submitted to transm't the reference documents which were requested l

I in Darrell G. Eisenhut's letter dated June 9,1981., and those documents which the staff reviewers requested during the environmental site visit on June 23 and 24, 1981 concerning the Environmental Report - Operating License stage review.

l As you requested at the environmental site visit, the following documents are being transmitted directly to you:

Site Report, Perry-Macedonia-Inland 345 KV Transmission Line, volumes I l

and II, the Cleveland Electric luminating Company, 1975 l

{

Ohio Power Siting Commission, Op*nion and Final Order Granting Certifi-cate of Environmental Compatibility and Public need With Conditions, Case no. 02-00001 - Application of the Cleveland Electric Illuminating Company for a Certificate of Environmental Compatibility and Public Need auth-orizing the construction, operGtion, and maintenance of a 345,000 volt transmission line, known as the Perry-Macedonia-Inland transmission line, filed March 29, 1976.

Site Report, Perry-Hanna 345 KV Transm5 m on Line: the Cleveland Electric Illuminating Company and the Ohio " hson Company, 1978.

Ichthyoplankton Study Pcport, 1974 data, Perry Huc'. ear Power Plant.

316 (a) Study Reports for each of the Cleveland Electric Illuminating Compan.y's stea:a electric generating facilities; Ashtabula, Avon, East-1ske and Lake Shore.

316 (b) Study Reports for each of the Cleveland Electric Illumirmting Company's steam electric generating facilities; Ashtabula A & B, Ashtabula C, Avon, Eastlake and Lake Shore.

f**k*

t-8108100059 810804

[gl 8 pec PDR ADOCK 05000

Mr. Dean Houston August 4, 1981 Noise Analysis of the Perry Nuclear Power Plant, September 1974.

Ohio Environmental Protection Agency authorization to discharge under the National Pollutant Discharge Elimination System (NPDES) for the construction of the Perry Nuclear Power Plant Units 1 and 2.

Ohio Environmental Protection Agency 401 Certification for the Perry Nuclear Power Plant, June 21, 1974.

Investigation of Mathematical Model for Cooling Tower Plumes and Drift, A. J. Policastro, et al., ANS meeting, November 12-16, 1979.

1974 Annual Report of the Aquatic Ecological Program at Perry Nuclear Power Plant Site, May 1975 Compilation of Aquatic Construction Monitoring Data, s

(5/1/72 - 4/30/74 cnd 9/1/77 - 8/31/ years of onsite meteorological data Magnetic tape containin6 the three 78).

l Very truly yours, ij t

Dal R. Davidson Vice President System Engineering and Construction i

DRD:dlp i'