ML20009H153

From kanterella
Jump to navigation Jump to search
Addendum to Proposal to NRC for 3-Yr Program of Geologic/ Hydrologic Research at West Valley Ny Waste Burial & Storage Facilities.
ML20009H153
Person / Time
Site: West Valley Demonstration Project
Issue date: 05/07/1981
From:
NEW YORK, STATE UNIV. OF, ALBANY, NY
To:
Shared Package
ML20009H150 List:
References
NUDOCS 8108060202
Download: ML20009H153 (5)


Text

.

Addendum to the Proposal to the UtlITED STATES NUCLEAR REGULATORY COMMISSIOt1

? for a THREE YEAR PROGRAM 0F G'E0 LOGIC / HYDROLOGIC RESEARCH AT WEST VALLEY i!EW YOP,X WASTE BUP,IAL AtlD STORAGE FACILITIES Submitted by:  ;

flew York State Education Department

, State Museum and Science Service l -Geological Survey-l May 7, 1981 ,

I j .-

l l l 8108060202 810728 PDR ADOCK 05000201 .- ,

p PDR I

' Schedule of Tasks (with estimated person-year involvement) 1981 1982 1983 ,

l l

I. Surface Water Project '

i stream monitoring -------------------------------------------------------------

l (1.8) (1.5) (1.0)

Tf. Groundwater Project USGS Drilling Seismic, resistivity, Project (1.0) and

  • radar studies (1.5)

Surface Gravel Mapping (0.5)

J1!. Geology Project Sand Lens delineation (0.5),

  • Land slide study -------------------------- -----

Sedimentological Analysis------------------------------------------------------

(0.5) (0.5) (0.5)

Petrological Studies -------------------------------------------------------- --

(0.5) (0.5) (0.5)

~

IV. Geomorphic Project

  • Spring Freshet Study (0.5)

Buttermilk Creek Terrace

  • Study (0.2)

._. *Cattaraugus Creek History -------------------------- -

Project (0.8) (0.7)

V. Radiochemical Analysis

  • Water and Sediment samples---------------------------------------------------

(0.5) (0.5) (0.5)

VT. Data Analysis and Presentation Mapping and cross sections, Progress summaries --------------------------------------------------------

(1.0) (1.0) (1.0)

Final Report Production

, , (2,0)

i 1

1 Schedule of' Tasks (ccnt.) . 1 1983 VII. Site Closing and Decommissioning instru. mentation removal well plugging (1.0)

I l

l l

S 4

f I

I l

I e

  • 9 y

4 1

Program -of' Study I. Surface Water Project

1. Strean monitoring ,

a) collection of water and suspended sediment samples b) measurement of stream .".ow data c) measurement of meteorological parameters II. Groundwater Project

1. USGS Drilling project
2. Seismic survey, resistivity study, surface pulsed radar study
3. Surface graval napping project III. Geology Project
1. Sand lens definition and delineation l 2. Landslide Study l 3. Sedimentological Analyses -

l 4. Petrological studies l

TV. Geomorphic Project

1. Spring freshet study
2. Butterni:k Creek Terrace study
3. Cattaraugus Creek erosional history project V. Radiochemical Analyses -
1. Water and sediment samples analyzed for radionuclides l

VI. Data Analyses and Presentation

1. Mapping and cross sectioning of site features 2 Summaries of progress throughout the study
3. Production of final report VII. Site Closing and Decommissioning l 1. removal of instrumentation .

l 2. plugging of wells J

v

Budget 1981 1982 1983 Personnel (including Indirect Costs)

Coordinators 54682 60150 66166 Assistants 87044 95884 105324 Office Staff 13299 14629 28917 Contractual Services 32000 40000 35000 Supplies 9000 10000 11000 Equipment 3000 3000 3000 Publications 800 ,

1000 2000 l Travel (domestic only) 19000 21000 24000 1

218825 245663 275407 l

l l

l i

l l

~