MONTHYEARML20009H1541981-05-0707 May 1981 Proposal to NRC for 3-Yr Program of Geologic/Hydrologic Research at West Valley Ny Waste Burial & Storage Facilities. ML20009H1531981-05-0707 May 1981 Addendum to Proposal to NRC for 3-Yr Program of Geologic/ Hydrologic Research at West Valley Ny Waste Burial & Storage Facilities. 1981-05-07
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20082D1431991-06-28028 June 1991 Off-Gas Constituents for Waste Solidification Sys Intermediate Milestone 20-3706-001-005 for Task 1 (Draft SER on Vitrification Off-Gas Sys),Subtask a ML20245D0471987-12-31031 December 1987 Simulation of Groundwater Flow Near Nuclear Fuel Reprocessing Facility at Western New York Nuclear Svc Ctr, Cattaraugus County,Ny. W/One Oversize Drawing ML20245D0941987-12-31031 December 1987 Surface Water Hydrology of Western New York Nuclear Svc Ctr,Cattaraugus County,Ny ML20245D1001987-12-31031 December 1987 Geohydrologic Conditions at Nuclear Fuels Reprocessing Plant & Waste Mgt Facilities at Western New York Nuclear Svc Ctr Cattaraugus County,Ny. W/One Oversize Drawing ML20129F4371985-05-30030 May 1985 Notification of Contract Execution,Mod 5,to West Valley Waste Burial. Contractor:State Univ of New York ML20088A9721983-06-30030 June 1983 Evaluation of West Valley Neutralized Waste Tank Photographic,Video Television & Ultrasonic Measurement Insp Records ML20084M0421983-03-31031 March 1983 Geologic and Hydrologic Research at the Western New York Nuclear Service Center,West Valley,New York.Annual Report. August 1981 - July 1982 ML20069H8711982-07-31031 July 1982 Geomorphic Processes and Evolution of Buttermilk Valley and Selected Tributaries,West Valley,New York ML20054K9101982-06-15015 June 1982 Insp & Evaluation of NFS High Level Waste Storage Sys, Monthly Progress Rept for May 1982 ML20054F8481982-06-0303 June 1982 Notification of Contract Execution,Mod 3 to West Valley Waste Burial. Contractor:State Univ of Ny at Stoneybrook ML20054F8531982-06-0303 June 1982 Mod 3,extending Period of Performance to 821231,to West Valley Waste Burial ML20052H3661982-05-31031 May 1982 Geologic and Hydrologic Research at the Western New York Nuclear Service Center,West Valley,New York.Progress Report, August 1979-July 1981 ML20039E5071981-12-31031 December 1981 Seismic Resistance Capacity Evaluation of Spent Fuel Storage Racks and Fuel at West Valley,New York.Appendices ML20039E5131981-12-31031 December 1981 Seismic Resistance Capacity Evaluation of Spent Fuel Storage Racks and Fuel at West Valley,New York ML20052F8901981-10-31031 October 1981 Review of DOE Waste Package Program Subtask 1.2 - Assessment of West Valley Waste Package Program, Draft Rept ML20009H1531981-05-0707 May 1981 Addendum to Proposal to NRC for 3-Yr Program of Geologic/ Hydrologic Research at West Valley Ny Waste Burial & Storage Facilities. ML20009H1541981-05-0707 May 1981 Proposal to NRC for 3-Yr Program of Geologic/Hydrologic Research at West Valley Ny Waste Burial & Storage Facilities. ML19339A3561980-10-31031 October 1980 Geotechnical Analysis of Soil Samples and Study of Research Trench at Western New York Nuclear Service Center,West Valley,New York ML19339A3661980-10-31031 October 1980 a General Investigation of Radionuclide Retention in Migration Pathways at West Valley,New York LOW Level Burial Site.Final Report.October 1978-February 1980 ML19225A6391979-04-27027 April 1979 Quarterly Environ Monitoring Rept for Jan-Mar 1979 ML19291C2791979-03-31031 March 1979 Seismic Analysis of Acid Liquid Waste Tanks at Western Ny State Nuclear Svc Center,West Valley,Ny. 1991-06-28
[Table view] |
Text
.
Addendum to the Proposal to the UtlITED STATES NUCLEAR REGULATORY COMMISSIOt1
? for a THREE YEAR PROGRAM 0F G'E0 LOGIC / HYDROLOGIC RESEARCH AT WEST VALLEY i!EW YOP,X WASTE BUP,IAL AtlD STORAGE FACILITIES Submitted by: ;
flew York State Education Department
, State Museum and Science Service l -Geological Survey-l May 7, 1981 ,
I j .-
l l l 8108060202 810728 PDR ADOCK 05000201 .- ,
p PDR I
' Schedule of Tasks (with estimated person-year involvement) 1981 1982 1983 ,
l l
I. Surface Water Project '
i stream monitoring -------------------------------------------------------------
l (1.8) (1.5) (1.0)
Tf. Groundwater Project USGS Drilling Seismic, resistivity, Project (1.0) and
Surface Gravel Mapping (0.5)
J1!. Geology Project Sand Lens delineation (0.5),
- Land slide study -------------------------- -----
Sedimentological Analysis------------------------------------------------------
(0.5) (0.5) (0.5)
Petrological Studies -------------------------------------------------------- --
(0.5) (0.5) (0.5)
~
IV. Geomorphic Project
- Spring Freshet Study (0.5)
Buttermilk Creek Terrace
._. *Cattaraugus Creek History -------------------------- -
Project (0.8) (0.7)
V. Radiochemical Analysis
- Water and Sediment samples---------------------------------------------------
(0.5) (0.5) (0.5)
VT. Data Analysis and Presentation Mapping and cross sections, Progress summaries --------------------------------------------------------
(1.0) (1.0) (1.0)
Final Report Production
, , (2,0)
i 1
1 Schedule of' Tasks (ccnt.) . 1 1983 VII. Site Closing and Decommissioning instru. mentation removal well plugging (1.0)
I l
l l
S 4
f I
I l
I e
4 1
Program -of' Study I. Surface Water Project
- 1. Strean monitoring ,
a) collection of water and suspended sediment samples b) measurement of stream .".ow data c) measurement of meteorological parameters II. Groundwater Project
- 1. USGS Drilling project
- 2. Seismic survey, resistivity study, surface pulsed radar study
- 3. Surface graval napping project III. Geology Project
- 1. Sand lens definition and delineation l 2. Landslide Study l 3. Sedimentological Analyses -
l 4. Petrological studies l
TV. Geomorphic Project
- 1. Spring freshet study
- 2. Butterni:k Creek Terrace study
- 3. Cattaraugus Creek erosional history project V. Radiochemical Analyses -
- 1. Water and sediment samples analyzed for radionuclides l
VI. Data Analyses and Presentation
- 1. Mapping and cross sectioning of site features 2 Summaries of progress throughout the study
- 3. Production of final report VII. Site Closing and Decommissioning l 1. removal of instrumentation .
l 2. plugging of wells J
v
Budget 1981 1982 1983 Personnel (including Indirect Costs)
Coordinators 54682 60150 66166 Assistants 87044 95884 105324 Office Staff 13299 14629 28917 Contractual Services 32000 40000 35000 Supplies 9000 10000 11000 Equipment 3000 3000 3000 Publications 800 ,
1000 2000 l Travel (domestic only) 19000 21000 24000 1
218825 245663 275407 l
l l
l i
l l
~