A CV UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION A
jf BEFORE THE ATOMIC SAFETY AND LICENSING BOARD I '3
'Ol y.
. ~ m Sut:ri 1 Crike
,-\\ c : _
s L :,ia g
h/]
In the Matter of
)
a
)
PENNSYLVANIA POWER & LIGHT COMPANY
)
)
and
)
Docket Nos. 50-387
)
50-388 ALLEGHENY ELECTRIC COOPERATIVE INC.
)
)
(Susquehanna Steam Electric Station,
)
Units 1 and 2)
)
to AFFIDAVIT OF JOHN M. VALLANCE IN SUPPORT OF r
q
SUMMARY
DISPOSITION OF CONTENTION 3 fYp 0.
, 1.".
2
/;UG 0 519818 t8 City of Washington
)
g u.s.wggj,b*"" h) ss.
sA
's 4
District of Columbia )
')
'O T1T John M. Vallance, being 6uly sworn according to law, deposes and says:
l 1.
I am a member of the firm of Pickard, Lowe and Garrick, Inc., which is a consultant to electric power i
utilities in economic and technical matters, and give this affidavit in support of Applicants' Motion for Summary Disposition of Contention 3.
I have personal knowledge of the matters set forth herein and believe them to be true and correct.
A summary of my professional qualifications and l
experience is attached as Exhibit "A" hereto.
n108050387 810728 PDR ADOCK 05000 i
$0 [
t 2.
Contention 3 alleges that "known and assured" reserves of uranium are insufficient to supply the lifetime fuel required for Susquehanna 1 and 2; that all estimated reserves of uranium will have been consumed prior to the end of the thirty year life of those units; that higher fuel prices will result from the depletion of the uranium reserves; and that "much uranium for the facility will have to be imported."
As will be shown below, all of these allegations are incorrect and in fact there will be an adequate supply of domestic uranium at moderate prices to provide fuel for the Susquehanna t..its throughout their lifetime.
The Uranium Industry 3.
The domestic natural uranium supply industry originally evolved to fulfill the needs of the U.S. government for the supply of uranium for defense purposes.
The government procurement program was successful, and due to its requirements being fulfilled, the government stopped purchasing natural uranium in 1971.
Until the mid-1960's, U.S.
law did not permit private ownership of enriched uranium and therefore there was essentially no private market for natural uranium.
At that time, the Atomic Energy Act was amended to permit private ownership of enriched uranium and a timetable was also set for the transition to private ownership of enriched uranium which had previously been leased from the government.
Since then, the domestic market for natural uranium has gradually evolved,. --
although 1978 was the first year in which annual production exceeded the levels experienced in the industry during the government purchasing era around 1960.
4.
Because the government's demand for natural uranium dropped off faster than the commercial power demand grew in the late 1960's and early 70's, an oversupply of uranium production capacity existed and the utility indnstry found it could then purchase uranium on a competitive-bid basis at very low prices.
This oversupply capability caused low prices to prevail until 1973.
At that time, two significant events occurred:
(1) the OPEC oil embargo; and (2) the government changed its contracting practices for enriching services.
The latter had the effect of locking utility customers into fixed schedules for supplying natural uranium feed to the government for enriching.
The former caused many fuel buyers to try to contract for fuel supplies further into the future.
The end result was that the uranium supply industry became overwhelmed with proposal requests exhibiting serious interest on the part of purchasers to buy uranium well into the future.
The uranium producers were not prepared for such an onslaught of buyer activity and rapidly became " sold out."
The producers then had to rely on ongoing expansion programs before they could enter into new suoply commitments.
The price of uranium increased rapidly from about $6 to $7/lb U0 in 1973 to $41/lb in 1976, then reached a peak of $43/lb 38 in 1978.
In 1979, the price began a rapid decline.
The price,
as of January 1981 was $25/lb.
It appears that due to the excessive delays that have taken place in reactor construction schedules, there will be an oversupply capability for at least several years.
In addition, the outlook for further future growth of nuclear power has diminished and the estimated future uranium demand will be reduced accordingly, as compared with the outlook at previous points in time.
Occurrence of Uranium 5.
In the United States, the most common uranium minerals are uraninite (uranium oxide) and coffinite (uranium silicate) (Reference 1).
These minerals were deposited through the circulation of uranium-bearing ground waters in permeable sandstone beds in which organic material or other reducing agents were present, resulting in the precipitation of the uranium over an extended period of time, thus producing ore deposits.
The uranium in the ground water is believed to have been derived from the weathering of overlying volcanics containing minute amounts of the element.
Most of the uranium deposits discovered so far in the United States are in sandstones.
1 6.
The known U.S.
reserves of uranium are in deposits ranging from a few hundred tons of ore to several millions of tens, mostly in the West.
About 90% of the l
reserves are in some 200 6eposits which range in size from 1
References are listed at the end of this affidavit.
_4_
500,000 tons of ore to 5 million tons or more (Reference 3).
Uranium ore is millgd to produce an ore concentrate.
The uranium content of ore concentrate is normally expressed in terms of its equivalent U 0 content.
Natural uranium is 38 usually purchased by utility companies in the form of ore concentrate, or sometimes in the form of uranium henafluoride (UF6), a m re refined product.
Uranium Resources 7.
The average abundance of uranium in the earth's crust is eetimated at 1.7 to 4 grams / metric ton (Reference 2).
On this basis, the U.S. portion of the earth's crust is estimated to contain 2.6 trillion tons of U 03 8 (Reference 2).
However, we can consider only those deposits of uranium which have a sufficient combination of concentration and accescibi-lity to permit economic recovery.
Such deposits are referred to as " resources."
The United States Department of Energy
(" DOE") prepares and publishes estimates of uranium resources annually.
8.
Estimates of uranium resources are generally structured into two major categories:
(1) reserves, and (2) potential resources.
Reserve estimates are based on a rela-tively large number of measurements and therefore are rea-sonably accurate.
Potential resources, on the other hand, are based on less complete and in some cases, very incomplete data, and therefore are less certain.
Reserves for individual.
deposits are calculated from measurements and interpretation of dri.11-hole logs made available to DOE by uranium companies.
Using established engineering, geologic and economic tech-niques, DOE makes estimates of the amount of uranium that can be produced from a deposit at various levels of forward cost.
t 9.
Potential resources are uranium deposits which 4
have not yet been sufficiently delineated to qualify as reserves.
The potential resources are subdivided into three classes:
probable, possible, and speculative; listed in the order of decreasing reliability.
" Probable" potential 1
resources are those believed to exist as extensions to known deposits or to occur in new deposits in areas known to be mineralized.
"Possible" potential resources are those believed to exist in formations which have been productive elsewhere under similar geologic conditions.
" Speculative" potential resources are the least reliable class and are allocated to areas that have been identified as having some geologic features believed favorable for uranium deposition but which in the past have not. been productive.
By their nature, the estimates of potential resources are less certain than those of reserves.
However, DOE tends to be conservative in its resource estimates, so use of their data is reasonable.
1 10.
Since the amount of uranium that is available depends on its recovery cost, DOE reports source data in l
several " forward cost" categories.
The forward cost concept takes into account the factors which will affect the cost of mining each individual deposit and permits estimates to be made -..-... ~.. - -. -.- - - - -. -.. - - - - - - - - -
of the quantity of reser7es and potential resources that will be minable at various cost levels.
Forward cost does not represent a projected price.
It includes capital and operating costs yet to be incurred.
It excludes past expenditures and taxes and return on investment.
2 11.
Table 1 provides data on the uranium reserves and resources estimated by DOE as of January 1, 1981.
The reserve and resource estimates for the higher forward cost categories, particularly above $50/lb, are conservatively low because the industry has e ly recently begun looking for higher cost deposits and most of the quantities now estimated in these higher cost categories have been found incidental to looking for lower cost material.
In addition to the amounts shown in Table 1, sufficient data exist to indicate that at least 5 million tons of U 0 are available from shale deposits at under 38
$100/lb forward cost (Reference 5).
It is doubtful that we will ever need to use such low grade material, but it is there if needed and effectively puts a ceiling on projections of uranium prices.
Uranium Exploration 12.
Ore bodies containing ' ~rge amounts of uranium can occur in physically small dimensions, be discontinuous from other bodies, and hence, can be difficult to find.
An ore body 2
Tables and figures are supplied at the end of this Affidavit..
containing a lifetime supply of uranium for a reactor could occur under a land area covering a few hundred acres.
Such discrete deposits are not uncommon.
13.
Uranium sometimes occurs along with other primary minerals with the other minerals governing the rate at which the uranium in such deposits is available for recovery.
Examples are uranium by-product from gold production in South Africa and uranium by-product from phosphate mining in the U.S., mainly Florida.
14.
Almost all of the uranium resources found so far in the U.S.
are in sandstone deposits.
Elsewhere in the world, large deposits exist in other geologic settings, such as quartz pebble conglomerates in Canada and South Africa and the metamorphosed sediments in Australia.
15.
In 1980, additions to reserves in the up to
$100/lb forward cost category amounted to 104,000 tons U 0 38 (Table 2).
Reserves removed from this cost category duc principally to the effect of cost inflation, amounted to 167,000 tons U 0 Therefore, the net reduction to the $100/lb 38 l
reserve category was 63,000 tons U 0 Pr duction was 25,000 38 tone.
16.
Drilling for uranium in 1980 was down from the four prior years, presumably due to a softer market.
In 1980, drilling was 23.2 million feet.
Table 3 gives drilling data for 1971-80.
17.
Figure 1 gives a picture of the extent of annual l
drilling for uranium since 1950.
-. -=.__.- _ = _
1 Uranium Production and Production Capacity - Past and Current 1
i 18.
Uranium ore is crushed and treated chemically at a urenium mill to yield ore concentrate (generally referred to as U 0 r yell wcake).
Annual concentrate production capacity 38 is determined by the availability of ore from the mines and by i
mill capacity.
As uranium requirements increase new mines are opened.
This may take several years depending on the size of the mine and other factors.
Underground mines require the sinking of several large shafes.
Open pit mines require the stripping of relatively large amounts of overburden.
The industry attempts not to over-build production capacity and therefore monitors projected uranium requirements carefully.
In spite of this, current production capability substantially exceeds current demand.
i 19.
The instantaneous production capacity of 7
4 l
l conventional uranium mills as of January 1, 1980 was about 49,000 tons ore / day.
For an ore grade of 0.11% and including non-conventional production, the January 1,1980 production capability was about 21,000 tons U 0 / year.
Actual production 38 in 1979 was 18,730 tons U 0 (P.eference 3) and in 1980 was 38 21,850 tons.
Table 4 lists U.S. uranium production capacity as of 1/1/80.
Concentrate production in the U.S. annually since 1956 is shown in Figure 2.
Effect of Enriching Operations on Natural Uranium Demand 20 U-235 is the only naturally occurring fissile :
l
-, - -. -. -,.,., ~,. - __,,., _.-.,,_ -
isotope.
Uraniun, as mined fron the earth's crust, normally contains 0.711% U-235, the balance being almost a]1 0-238.
This mixture of U-235 and U-238, in the above proportions, is referred to as natural uranium.
Light water reactors such as in the Susquehanna units utilize slightly enriched uranium as the fuel.
That is, uranium in which the U-235 concentration is higher than normally occurs in nature.
21.
Natural uranium can be enriched in its U-235 concentration in isotope separation plants.
Cur reratly, the U.S.
Government owns and operates several plants where en-riching of uranium is done for both domestic and foreign customers, at prices established by the government.
The government is expanding the capacity of these plants, which incidentally were originally built for national defense purposes, and is also planning to build new plants.
22.
The need for the U-235 isotope la the reactor fuel (typically, the uranium is enriched to 2.5 to 3% in its U-235 content), together with the way the enriching plant is operated, determines the requirement for natural uranium.
The enriching plant can ti operated to strip varying amounts of the U-235 1sotope from the uranium being fed to the plant.
- Thus, the plant can " work hard" and remove a large portion of the U-235 from the natural uranium feed, or it can be operated to remove only a small portion.
The measurement unit of the enriching work done is called a separative work unit (a SWU).
23.
The enriching plant can be considered to operate with (1) a feed stream of natural uranium, (2) a product stream of enriched uranium, and (3), a depleted uranium tailings stream containing the unrecovered U-235 (the U-235 concen-tration in this stream is referred to as the " tails assay").
There is a trade-off between the amount of separative work and the amount of natural uranium needed to produce a given quantity of enriched uranium.
More SWU's and less natural uranium can do the job, or alternatively, fewer SWU's and more natural uranium.
Of course, the more SWU's expended, the lower the resulting tails assay (i.e., more recovery of the U-235 in the feed).
24.
Data on specific quantitative relationships between SWU's, feed, and tails assay are given below.
These are set forth parametrically for various discrete tails assay values.
To Produce 1 Kg U at 3% U-235 Tails Separative Natural Uranium Assay Work Feed
%U-235 Kg SW Kg Nat. U 0.1 6.0 4.7 l
0.2 4.3 5.5 l
l 0.3 3.4 6.6 0.4 2.8 8.4 0.5 2.4 11.8 l
t 25.
Thus, it can be seen that considerable changes in the relative amounts of natural uranium feed and separative l
! l l
?
work can be effected to compensate for shortages or surpluses in either of them.
Depending on the cost of each of these components, there is a unique tails assay value that results in minimum product cost.
We call that value the " optimum tails assay."
Currently, and in the foreaeeable future, the optimum tails assay is expected to fall in the range of 0.20 to 0.30%.
The higher the natural uranium price, the lower the optimum tails assay.
The standard tails assay used by DOE for en-riching transactions is 0.2%, although DOE offers a selection to the user in the range of 0.16 to 0.30%.
A tails assay of 0.2% is used herein for calculations of natural uranium demand.
Demand For Uranium 26.
There ate two important non-reactor type uncertainties affecting the amount of natural uranium needed for a given reactor.
These are (1) the enriching plant tails assay discussed above, and (2) wnether or not recycle of recovered fuel is allowed.
Reprocessing of spent fuel, followed by recycle of the recovered uranium and plutonium, I
serves to reduce the natural uranium demand of a reactor by t
l about one-third.
l PP&L Reactors 27.
Each of the Susquehanna reactors, over a 30-year life, and assuming a lifetime average capacity factor of 70%,
an enriching tails assay of 0.2% and disposal of spent fuel (rather than recycle), will have a need for about 6100 tons of U0 to provide the enriched uranium needed.
This equates to 38 5.8 tons of U 0 /MW (electric).
38 Domestic Reactors 28.
Currently, there are about 161,000 MW (electric)
("MWe") of uranium fueled steam electric plants (comprising 165 units) in operation, being built or committed for construction in the U.S., some of which will not enter service until the 1990's and some of which may yet be cancelled or further 1
delayed.
29.
The status of domestic reactor projects as of the end of 1980 is summarized as follows:
1 l
l Nuclear Power Plants; Operating, Under Construction and Planned Number Of Units Gigawatts Status (No.) (Cum.)
(No.) (Cum.)
In Commercial Operation 67 67 51.4 51.4 Under Constructiott (including 77 144 85.1 136.5 plants awaiting operating license) l
)
Have C.P. but Const. not started 8
152 8.4 144.9 CP Application Pending 11 163 13.5 158.4 Indefinite Schedule 2
165 2.2 160.7 I.
30.
Using the Susquehanna reactor parameters, the lifetime requirecent of 161,000 MWe (30 year, 70% capacity factor, enriching tails assay = 0.2%) is about 935,000 tons U0 f r a non-recycle mode of operation.
About 175,000 tons 38 of this requirement has already been delivered to U.S. utility companies and another 192,600 tons is under contract to be delivered, leaving 568,000 tons yet to be placed under contract and 760,000 to be delivered (Ref. 3).
Thus, the outstanding needs of all domestic reactors currently in operation, under construction and on order can be met from current uranium reserves, which are 787,000 tons at $50/lb or less.
See rable 1.
31.
The future growth rate of uranium fueled steam electric plants is uncertain and this of course creates major uncertainties in natural uranium demand and the planning of production capacity expansion programs.
During the past two i
l years, a number of previous nuclear plant orders have been cancelled and no new orders have been placed.
32.
Based on current perceptions, it appears reasonable for planning purposes to assume the growth of nuclear fueled steam electric plants will lie within the range of 150 to 200 GWe (1 GWe = 1000 MWe) of operable plant capacity by year 2000.
For perspective, plants currently operable, under construction or planned amount to 161 GWe.
Figure 3 shows the nuclear power growth projections used herein for purposes of developing an estimate of a credible range in 1
natural uranium demand over the lifetime of the Susquehanna reactors.
The "high case" closely follows current announced completion dates for reactors not yet operable, plus some new reactors not presently planned coming into service in the latter 1930's.
The " low case" characterizes a condition of substantial additional plant slippages and terminations, with no new plants beyond those already planned.
As of 2013 (when the operating licenses of the Susquehanna units will expire),
the projected low case nuclear capacity is 150 GWe and the high case is 330 GWe, The most likely growth scenario lies between the high and the low cases.
Industry Uranium Demand 33.
As used in this affidavit, " demand" refers to delivery of U 0 to a converter, in order to subsequently 38 deliver UF to the enriching plants on schedules consistent 6
with the stated power growth curve.
The relationships between demand and required domestic production are discussed later.
34.
Tables 5 and 6 provida detailed data on annual uranium demand for the assumed growth rates.
The amount of uranium needed for initial cores, which is proportional to l
growth rate is shown; and the amount for reloads, which is proportional to total installed power and capacity factor is i
also given.
Fuel perfor;aance of all the reactors is assumed to be the same as the Susquehanna Units and plant capacity factor is assumed to average 70% over the life of the reactors.
The l l l
l
onriching plant tails assay is assumed to be 0.2% throughout the period.
35.
For the period 1980 to 2000, the average annual rate of increase in tranium demand for the high case is 5.4%
and for the low case is 3.6%.
These are rather modest produc-tion expansion rates and can easily be achieved by the industry, which is capable of expanding production c<. con-siderably higher rates.
36.
Figure 4 provides a visual comparison of the cumulative uranium demand over time and the current estimates of domestic uranium reserves and resources and provides a rather vivid picture of the adequacy of the resource base.
As shown by the figure, the domestic resource base is considerably larger than the cumulative uranium demand through the period covered.
The demand curve in Figure 4 is the demand through the stated point in time.
The high demand case shows a l
cumulative demand through 2013 (when the operating licenses of the Susquehanna units will expire) of 1,280,000 tons of U 0 3 8' which (taking into account that 175,000 tons have already been delivered) is only slightly larger than current proven domestic l
reserves, and well below the estimates of potential uranium l
resources.
For the low demand case, the cumulative demand is 802,000 tons, minus 175,000 already delivered--well within l
current domestic reserves.
For a most likely intermediate l
case, the cumulative demand would also lie well within current proven domestic reserves.
l 1
37.
Another way to look at the supply-demand situation is to compare the lifetime requirement of a given amount of nuclear power capacity with the resource base.
Using this approach, together with a reactor lifetime uranium requirement as listed above for the Sasquehanna Units (5.8 tons /MWe), gives a lifetime requirement for the high case year 2000 capacity (200 Gwe) of 1,160,000 tons U 0 and 870,000 tons 38 for the low case (150 GWe).
These amounts are also only a small fraction of the domestic resource base.
Also, for this lifetime demand comparison, it should be noted that of the total requirements of the above reactors, approximately 175,000 tons of U 0 has already been delivered.
38 38.
Thus, it appears there is no reason for concern about the adequacy of domestic natural uranium for the projec-ted U.S.
nuclear power capacity.
It appears likely there will also be substantial quantities of uranium potentially available from other countries for import into the U.S., which further assures a plentiful supply.
39.
If it ever appeared that there is a serious concern about the continued adequacy of uranium to sustain the existing and planned nuclear power plants for their normal lifetimes, a self-regulating corrective action would take place; namely, new reactors would no longer be planned and those in the planning stage would be terminated.
This natural feedback mechanism assures that the total nuclear power capacity constructed will not outstrip the available uranium supply..
Supply of Uranium From Non - U.S.
Sources 40.
Foreign resources are usually categorized as
" reasonably assured" and " estimated additional."
For the most part these are equivalent to the DOE definitions of " reserves" and " probable" resources respectively.
Estimates of resources in non-communist countries are given in Tables 7 and 8.'
41.
These resources are more than sufficient to meet the projected cumulative foreign demand through year 2000 even without plutonium recycle.
Because much of the world has not yet been adequately explored for uranium, it is reasonable to expect the foreign reserve picture to improve dramatically as exploration proceeds.
Resources do not seem to be a limiting factor to nuclear power expansion over the espected lifetime of the Susquehanna units.
42.
Because the U.S.
resources of uranium appear to be adequate to meet domestic demand, there is no need for the U.S.
to become dependent on the supply of foreign uranium.
Whether the U.S.
will in fact rely on importing a portion of its uranium requirements will probably depend largely on whether or not it is economically advantageous to do so.
However, until 1984, there are limitations imposed by the U.S.
government on the amount of foreign origin natural uranium that may be used as feed for the production of enriched uranium for domestic use, The permissible amounts are: 40% in 1981, 60% in 1982, 80% in 1983 and 100% in 1984 and after. __
l Current Uranium Supply Status of PP&L 43.
As of the end of 1980, PP&L had 1704 tons of U0
( r equivalent) either in process or in inventory a.3 38 follows:
Status Tonc U 0 38 At Conversion Facility 382 At DOE Enriching Facility 801 At Fuel Fabrication Facility 507 TOTAL 1790 In addition, as of the end of 1980, the following amounts of U0 re under contract to be delivered to PP&L:
38 Supplier Tons U 0 3g General Atomic Company 1266 United Nuclear Company 150 Mobil Oil Company 1380 TOTAL 2796 44.
These 4586 tons of uranium, either on hand or under contract, should be adequate to supply the initial core and 9 reloads for Susquehanna Unit 1 and the initial core and 8 reloads for Unit 2.
Therefore, PP&L has in hand or under contract sufficient uranium to satisfy the needs of the Susquehanna units through about 1993. PP&L also has additional uranium under contract, but its delivery is not firm.
If this
additional uranium were delivered, it would extend coverage of the needs of th' Susquehanna units through about 1996-1997.
Given the estimates of the availability of uranium in the future, it is expected that PP&L will have no difficulty obtaining contracts fer the supply of the additional uranium needed in the 1990's and later.
Uranium Prices - Historic Trends 45.
Production of uranium in substantial quantities began in the later 1940 's.
The Atomic Energy Commission purchased large quantities from U.S. producers during the period 1948 to 1971.
In the late 1960 's, the private uranium market began to evolve.
46.
Figure 5 is a plot of uranium price from 1948 to 1980.
In order to provide perspective regarding the trends in real price, these price data have been converted to constant January 1981 dollars.
The procedure used is to multiply the old price by the ratio of the Producer Price Index for Industrial Commodities at the desired current date (January 1981 is used) to its value at the old point in time.
This
- emoves the effect of inflation on the price, in that the resulting price ia in real dollars relative to the price of all industrial commodities.
47.
Cn a constant January 1981 dollar basis, the price peaked at $42.50/lb U 0 in 1953, then gradually declined 38 to about $14/lb in the early 1970 's.
In the early 1970's the
. t
price continJed declining and the market was depressed.
However, in.'973, the OPEC oil price increases and the change by AEC from requirements to fixed commitment enriching con-tracts apparently were major contributors to causing uranium buyers to attempt to line up their supply well into the future and this flurry of market activity caused a very substantial upward movement in the price of uranium, increasing from about
$15/lb in 1973 to $63/lb in 1976.
Since then, the real price has declined at a very substantial rate.
As of January 1981, the market price was about $25/lb U 0 3 8*
48.
In Figure 5, data published by the DOE were used the basis for the prices paid by AEC over the period 1948 to as 1971, and the " Exchange value.3 published by NUEXCO was used to characterize the market price for industry purchases over the period 1968 to 1981.
In both of these sets of data, the adjustment by the Industrial Commodity price ratio was made to the reported data, in order to place it in constant dollars.
49.
Figure 6 is a plot of the uranium market price since 1971.
The lower curve, labeled "Then-Current Dollars" is the price reported by NUEXCO as the exchange value as of the end of the month, and gives a reasonable representation of the market price in then-current dollars.
The upper curve, labeled l
" Constant January 1981 Dollars" is the adjusted price, which 3
Exchange Value is NUEXCO's judgment of the price at which transactions for significant quantities of natural uranium concentrates could be concluded.
- - ~
has removed from it the effect of the inflation that has been occurring so as to provide better perspective in real price trends.
50.
As can be seen from Figure 6, the decrease in price began in 1976, when the then-current price began to increase less rapidly than the rate of inflation.
Since then, the rate of decreare steadily accelerated and the market price as of early 1981 was $25/lb.
Future Market Price t
51.
The possible behavior of the future uranium 4
market was investigated using the EUREKA uranium market model.
Many computer runs were made so as to try to reasonably bracket the range in uncertainty in some of the more important input variables such as:
- the uranium demand trajectory.
- short term mine and mill expansion plans.
- the ultimate amount of uranium resources.
- the extent to which uranium is imported, l
52.
Some of these input variables are difficult to project and are themselves affected by the future market.
l Therefore, it is not possible for anyone to make an exact 4
The EUREKA uranium market model is an elaborate computer i
program simulation of the uranium supply industry, created by Pickard, Lowe & Garrick and Colorado Nuclear Corporation.
A brief description of the model is contained in Appendix A.
-22.-
projection of the inarket.
The results obtained for individual cases are best used in evaluating possible price trends and the likely effects of various potential actions by buyers and sellers on the market.
The price trend shown in Figure 7 reflects a judgment of the composite results of the cases a'd represents my projection of the trend in considered, n
uranium pricas in the future.
53.
The projected uranium prf es given herein are in
$/lb U 0, in January 1981 dollars.
The price given for year N 38 represents the estimated price for long term supply contracts entered into in year N, with the deliveries being made at that price during the period N + 2 tc N + 10 years.
As shown in Figure 7, I project the following prices: $35/lb in 1985 7
$39/lb in 1990, $55/lb in 1995 and $65/lb in 2000, and con-tinuing to rise at a gradual rate of about $1.5/lb per year after 2000, for an estimated price of about $85/lb in 2013.
Effect of Uranium Demand on Price 54.
Figure 8 shows the uranium prices projected by EUREKA for high and low demand cases and for a mf.d-case, which is the average of the high end low cases.
The high and 1cw cases used for these projections are very similar to those detailed in Tables 5 and 6.
55.
The price trajectory of the three cases is about the same, although the lower the demand, the larger the oscillations about the mean of the trajectory.
This general - -,
lack of sensitivity to demand is attributed to the fact that the demand is relatively low, even in the "high" case, and these demand levels can easily be met by the industry.
The demand estimated for the high case is 1,260,000 tons U 0 V'E 38 the period 1980-2013; the Susquehanna Units comprising about 1%
of the total.
Effect of Short Term Mine and Mill Expansion Plans 56.
Producers can defer uranium production expansion progr&ms when there is a surplus of production capacity and depressed prices.
This can cause a later deficiency in production capability and can therefore affect the future price.
57.
In our analysis of the market, if the market price is below the price needed for a given facility being constructed or being expanded to be profitable, the completion of such additional production capacity is assumed to be deferred.
Similarly, production from existing facilities is curtailed if the market price is not sufficient to permit continued operation at a profit.
58.
Thus, if there were a severe curtailment of producracn expansion programs in the future, the short-term price mignt become higher, which in turn would cause an I
l increase in production capacity and result in lower prices in the longer term.
l l
l _.
Effect of Ultimate Resource Base 59.
While domestic uranium resources appear large relative to demand, the EUREKA program was used to ascertain if there is any likely sensitivity between the calculated price and the assumed ultimate resource level.
The reference assumption is that the total domestic resources of uranium are 4.3 million tons.
Alternate cases were considered where the ultimate resource level was set at 3 and 2 million tons.
60.
With the EUREKA program, when the availability of sufficient resources limits the development of new reserves and production, the model predicts a steeply rising non-revers-ing price trend.
For the cases described herein, (and indeed for any cases which can be reasonably anticipated during the lifetime of the Susquehanna units) this condition was not encountered and there was little effect of the varying assumptions on the calculated prices.
61.
However, for the lower resource base cases, the model predicts increased import levels, which are discussed below.
Import of Oranium 62 In the mid and long term, it is assumed that there are no governmental limitations on the amount of uranium that can be imported.
The EUREKA model is basically a domestic market model and the affect of imports is studied by the use of.
the " trigger price" concept.
The trigger price is the price at which uranium for import is assumed to be readily available (with some limitations on the rate of growth).
Thus, if EUREKA calculates a market price that exceeds the specified trigger price, a portion of the forward demand will be absorbed by imports.
63.
The extent to which uranium will be imported depends on the supply / demand balance in the foreign sector and on the price that foreign producers put on the material.
It appears there will be an excess of foreign production capacity and much of the production will be at costs lower than U.S.
production.
This will encourage foreign producers to decrease prices to the degree necessary to enable them to achieve sales targets in the U.S.
Th$s may well act as a restraining force on the extent to which new higher-cost domestic production capacity is brought into service.
64 Imports could comprise a substantial portion of domestic uranium demand in the long term.
Utility policies which place a preference on ordering from domestic suppliers, and which assign specific cost or intangible adjustments to assurance of supply considerations in evaluating foreign versus domestic suppliers may be needed in order to prevent a serious l
loss by the domestic producers of a large share of the expanding domestic market.
If such policies were implemented, j
they would place a limit on uranium imports.
Nevertheless, the anticipated excess of foreign uranium production capacity will j l
~
help to assure the continued availability of uranium in the U.S.
at reasonable prices, f
Q= -
f John M. Vallance DISTRICT OF COLUMBIA
)
SS Sworn to and subscribed before me this 28th day of July
,1981.
xma>J Not y Public - Maureene A. Quick My Connission expires: April 30, 1986 l
l
-27~
l 1
References (1)
ERDA, NURE Preliminary Report, June 1976 (2)
USGS, United States Mineral Resources, Geologic Survey Professional Paper 820, 1973 (3)
DOE, Statistical Data of the Uranium Industry, GJO-100(80), dateo Jan 1, 1980 (4)
OECD, Uranium Resources, Production and Demand, dated December 1979, A Joint Report by the Organization for Economic Cooperation and Development (OECD) Nuclear Energy Agency and the International Atomic Energy Agency (IAEA).
(5)
DOE, Results of Low-Grade Uranium Studies, F.E.
- McGinley, Oct 1979 (6)
DOE Press Release 81-79, dated May 13, 1981 (7)
DOE, An Assessment Report on Uranium in the United States of America, GJO-lll(80), dated October, 1980 (8)
DOE Press Release 81-48, dated March 30, 1981 (9)
DOE Press Release 81-90, dated June 4, 1981 1
l
Table 1 U.S.
Uranium Resources as of January 1, 1981*
3 Forward Cost Estimated Recoverable Ore, 10 tons U 0 38 Catngory,$/lb Reserves **
Potential Total Probable Possible Speculative Total Up to 30 470 885 346 311 1542 2012 Up to 50 787 1426 641 482 2549 3336 Up to 100 1034 2080 1005 696 3781 4815 The reserves are as of January 1, 1981.
The potential resources are as of October 1, 1980.
In addition to these quantities, it is estimated that 140,000 tons U08 can be produced through year 2010 as a by-product of phosphate 3
and copper production.
Source:
References 6 & 7.
Table 2 Changes in Uranium Ore Reserves During 1980
$30 S50
$100 1/1/80 Reserve 645,000 936,000 1,122,000 i
New Properties 1,000 13,000 20,000 Reavaluation - Additions 21,000 48,000 84,000 Reevaluation - Subtractions (175,000)
(186,000)
(167,000)
Depletion - Production (22,000)
(24,000)
(25,000) 1/1/81 Reserve 470,000 787,000 1,034,000 Source:
Reference 6.
l l
t l
Table 3 HISTORICAL DRILLING DATA Number of Average Depth Total Footage Year Holes (Feet)
(Millions) 1971 38,900 400 15.5 1972 36,600 420 15.4 1973 34,300 480 16.4 1974 39,700 550 22.0 1975 55,900 4GO 25.5 1976 67,600 510-34.2 1977 106,000 430 45.6 1978 104,400 450 47.0 1979 90,600 450 40.8 1980 58,100 465 28.2 Source:
Reference 8 & 9.
i l
l l
l l
l l
~
Tablo 4 U.S. URANIUM PRODUCTION MILLS Operating as of 1/1/80 Nominal Capacity (Tons Convar'tional Mills Plant Location Ore / Day) (Tons U20./Yearl ANACONDA Copper Company Grants, New Mexico 6,000 Atlas Minurals Corporation Moab. Utah 1.400 Bear Creek Uranium Company Powder River Basin, Wyoming 2,000 Chevron Resources Company Hobson Texas 2,500 Conoco-Pioneer Nuclear Falls City, Texas 3,400 Cotter Corporation Canon City, Colorado 1,200 Dawn Mining Company Ford, Washington 450 Exxon Minerals Company. USA Powder River Basin, Wyoming 3.200 Federal-American Partners Gas Hills. Wyoming 950 Kerr-McGee Nuclear Corporation Grants, New Mexico 7.000 Path!!nder Mines Corporation Gas Hills, Wyoming 2,500 Pathfinder Mines Corporation Shiiley Basin,'Nyoming 1,800 Petrotomics Company Shirley Basin, Wyoming 1.500 Rio Algom Corporation La Sal. Utah 750 Sohio-Reserve Cebolleta, New Mexico 1.600 Union Carbide Corporation Uravan, Colorado 1.300 Union Carbide Corporation Natrona County, Wyoming 1,400 United Nuclear Corporation Church Rock, New Mexico 3,000 United Nuclear-Homestake Partners Grants. New Mexico 3,400 Wester 1 Nuclear, Inc.
Jeffrey City, Wyoming 1.700 Western Nuclear, Inc.
Wellpinit, Washington 2,000 Total 49.050 19.000-21,000 Solution Mining Operations Plant Location Everest Mineral Corporation Hobson. Texas IEC Corporation Three Rivers. Texas Mobil Oil Corporation Bruni. Texas Union Carbide Corporation Palangana. Texas United States Steel Corporation George West Texas U.S. Steel Niagara Mohawk George West Texas Uranium Resources, Inc.
Bruni. Texas Wyoming Mineral Corporation Bruni. Texas Wyoming Mineral Corporation Th ae Rivers. Texas Wyoming Mineral Corpora::e.)
Irigaray Wyoming Total 1,200-1,600 Phosphoric Acid Byproduct Plant Location Freeoort Uranium Recovery Corporation Uncle Sam. Louisiana Gardinier, Inc.
Tampa, Florida Uranium Recovery Corporation Mulberry, Florida Wyoming Mineral Corporation Pierce. Florida Total 500-700 Heap Leaching:
Dumps. Tailings, or Copper Dumps Plant Location Durita Development Corporation Naturita. Colorado Solution Engineering. Inc.
Falls City, Texas Union Carbide Corporation Maybell, Coloradu Wyoming Mineral Corporation Ringham Canyon, Utah Total 100-300 Grand Total 49.050 20,800-23.600 Source:
Reference 3.
~
l
a Table 5 Projected Industry Natural Uranium Demand High Case, Using Susquehanna Peactor Characteristics Thousands of Tons UjOg YEAR GW I.C.'S RELOADS TOTAL cut 1 TOT
= - _
19E:0 55.0 4.0 9.6 14.4 14.4 1981 66.0 8.4 11.5 19.9 34.3 1982 74.0 6.6 12.9 19.5 53.8 1993 38.0
- 4. 8 15.4 20.2 74.0 1984 99.0 7.0 17.3 25.1 99.1 1985 107.0 2.4 18.7 21.1 128.2 1986 120.0 3.6 21.0 24.6 144.7 1987 124.0 4.2 21.7 25.9 170.6 1988 130.0 3.0 22.7 25.7 19G.3 1989 137.0 2.4
?3.9 26.3 222.7 1990 142.0
- 2. 4 24.8 27.2 249.9 1'_i91 146.0 3.O-25.5 28.5 278.4 1992 150.0 3.0 2G.2 29.2 307.6 1993 155.0 3.0 27.1 30.1 337.7 1994 160.0
- 3. 6 28.0 31.6 369.3 1995 165.0
- 3. G 28.8 32.4 401.7 199G 171.0 3.G 29.9 33.5 435.2 1997 177.0 4.8 30.9 35.7 470.9 1993 183.0
- 5. 4 32.0 37.4 500.3 1999 191.0 6.0 33.4-39.4 547.7 2000
'200.0
- 6. 0 35.0 41.0 580.7 1
2001 210.0
- 6. 0 36.7 42.7 G31.4 l
2002 220.0 6.0 38.5 44.5 G75.0 2003 230.0 6.0 40.2 4G.2 722.1 2004 240.0 6.0 42.0 40.0 770.0 2005 250.0 6.0 43.7 49.7 819.7 2006 260.0
- 6. 0 45.5 51.5 071.2 2007 270.0 6.0 47.2 53.2 924.4 200G 280.0 6.O 49.0 55.O 979.4 2009 290.0 6.0 50.7 SG.7 1036.1 2010 300.0-
- 6. 0 52.5 50.5 1094.6 l
2011 310.0
- 6. 0 54.2 60.2 1154.8 l
2012 320.0 6.0 56.0 G2.0 1210.7 l
2013 330.0 6.0 57.7 G3.7 1280.5 l
2014 340.0
- 6. 0 5S.5 G5.5 1345.9 2015 350.0 6.0-61.2 G7.2 1413.1 I
GW = gigawatts (electric) of installed nuclear capacity at year end.
l I.C.'s = uranium required for initia' cores.
Reloads = uranium required for periodic refuelings.
_ ~, _
1 Table 6 Projected Industry Natural Uranium Demand Low Case, Using Susquehanna Reactor Characteristics Thcusands of Tons U 0 38 YEAR C44 I.C.'S RELORIls TOTAL CUM TOT 1980 54.0 3.6 9.4 13.0 13.0 1981 58.0 3.G 10.1 13.7 2G.7 1982 64.0 4.2 11.2 15.4 42.1 1983 70.0 4.8 12.2 17.0 59.1 1984 77.0 4.2 13.4 17.6 7G.0 1985 95.0 3.6 14.8 18.4 95.2 1986 92.0 4.2 18.1 20.3 115.5 1987 98.0
- 3. 6 17.1 20.7 13G.2 1989 IFS 0 3.6 18.3 21.9 158.1 1989 111.0 3.0 19.4 22.4 100.5 1990 117.0
- 3. 0 20.4 23.4 203.9 1991 122.0 3.0 21.3 24.3 228.3 1992 127.0
- 3. 0 22.2 25.2 253.4 1993 132.0 1.8 23.1 24.9 278.3 1994 137.0 1.8 23.9 25.7 304.1 1995
! CI. a 1.8 24.5 26.3 330.3 1996 144.0 1.2 25.0 2G.2 35G.5 1997 146.0
.6 25.5 26.1 382.G 1998 148.0
.G 25.9 2G.5 409.1 1999 149.0
.0 26.0 26.0 435.1 2000 150.0
.0 2G.2 26.2 461.3 2001 150.G
.0 2G.2 2G.2 487.G 2002 150.0
.0 28.2 2G.2 513.8 2003 150.0
.6 28.2 26.2 540.0 2004 150.0
.0 2G.2 2G.2 56G.2 2005 150.0
.0 26.2 26.2 592.4 2006 150.0
.0 26.2 26.2 618.G 2007 150.0
.0 26.2 26.2 G44.8 2000 150.0
.0 26.2 26.2 671.1 2009 150.0
.0 2G.2 26.2 G97.3 2010 150.0
.0 2G.2 26.2 723.5 2011 150.0
.0 28.2 26.2 749.7 2012 150.0
.0 28.2 2G.2 775.9 2013 150.0
.0 2G.2 26.2 802.1 2014 150.0
.0 2G.2 26.2 820.4 2015 150.0
.0 2G.2 2G.2 854.5 GW = gigawatts (electric) of installed nuclear capacity at year end.
I.C.'s = uranium reg-ired for initial cores.
R21oads = uranium required for periodic refuelings.
Table 7 REASONABLY ASSURED RESOURCES ~
(1.000 tonnes U)
Data available 1st January, IMS
<s80/kg U TOTAL COST RANGE 880-130/kg U RESERVES AT < st:0/kg U Al ge ria....................
28 0
28 A rgentica..................
23 5.1 28.1 Australia 290 9
299 Austrias...................
- 1. 8 0
- 1. 8 Bolivia 0
0 Botswana 0
- 0. 4
- 0. 4 B ra z il.....................
74.2 0
74.2 CanadaI....................
215 20 235 Central African Republic.....
18 0
18 -
C h il e......................
0 0
0 De n ma rk...................
0 27 27 E gypt......................
0 0
0 Finland....................
0
- 2. 7
- 2. 7 France 39.6
- 15. 7 55,3 Gabons...................
37 0
37 Germany, Federal Republic ol.
4
- 0. 5
- 4. 5 Ind ia.......................
29.8 0
29,8 Ita ly.......................
0
- 1. 2
- 1. 2 Japan......................
- 7. 7 0
- 7. 7 Korea, Republic of4.........
0
- 4. 4
- 4. 4 Madagascar 2...............
0 0
0 Mexico 3 6
0 6
Namibia 117 16 133 Nigert.....................
160 C
160 2
Philippines O. 3 0
- 0. 3 Po rtuga!...................
- 6. 7
- 1. 5
- 8. 2 8
Somalla 0
- 6. 6
- 6. 6 South Africa................
247 144 391 Spain......................
- 9. 8 0
- 9. 8 Sweden 8...................
0 301 301 Turkey
- 2. 4
- 1. 5
- 3. 9 United Kingdom.............
0 0
0 United States of America.....
531 177 708 Yugoslavia.................
- 4. 5 2
- 6. 5 2
Zarre
- 1. 8 0
- 1. 8 Total (romed)............,.
1,850 740 2,590
- less than 100 tonnes J.
1.
The material reported as reserves is mineable at prices up to
- CAN 125/kg U and other Reasonable Assuced Pesources are mineable at grices between S CAN 125 anJ t CAN 175/kg U.
2.
Source of data: Uranium Resources. Production and Demand. Paria,1977.
i 3.
Data refer to resources 'in-situ", rather than recoverable.
4.
Reported as 13. 000. 000 tonnes of ore with an average grade, of 0.M U Og.
3 5.
No uranium productics attowed in a deposit of 300.000 tonnes U due to a veto by the local authorities for environmental reasons.
Source:
J.eference 4.
y 9
w
+%y....
-=
g y
9
-w w
---+
g-
,ye-
,p-
-.y y-g-
,--w-t
Table C ESTIMA'IED ADDITIONAL RESOURCES (1,000 tonnes ID Data available 1st January,1979 TOTAL COST RANGE
< 880/kg U 840-130/kg U AT < $130/kg U
-t Alge ria.....................
0
- 5. 5
- 5. 5 A rgentina...................
- 3. 8
- 5. 3 9.1 Australia 47 6
53 Austria 2....................
0 0
0 Bolivia 2....................
0
- 0. 5
- 0. 5 Botswana 0
0 0
B ra zil......................
- 90. 1 0
90.1 Canada 1.....................
370 358 728 Central African Republic.....
0 0
0 C h ile.......................
5.1 0
5.1 Denma rk....................
0 16 16 E gypt.......................
0 5
5 Finland.....................
0
- 0. 5
- 0. 5 France 26.2 20 46.2 Gabon 2.....................
0 0
0 Germany, Federal Republic of 7
- 0. 5
- 7. 5 India
- 0. 9 22,8 23.7 0
2 2
Italy Japan.......................
0 0
0 Korea, Republic of...........
0 0
0 Madagascar 2................
0 2
2 Mexico 8
- 2. 4 0
- 2. 4 Namibia 30 23 53 2
53 0
53 Niger 2
Philippines 0
0 0
l Po rtugal....................
- 2. 5 0
- 2. 5 Somalla8 0
.a ;
3, 4 South Afries.
54 85 139 Spain
- 8. 5 0
- 8. 5 l
Sweden 0
3 3
l Turkey.....
0 0
0 I.htted Kingdom..............
0
- 7. 4
- 7. 4 L'nited States of America 773 385 1,158 Yugoslavia..................
5 15.5 20,5 2
Zaite
- 1. 7 0
- 1. 7 Total (rounded) 1,00 970 2,450 1), 2). 3) - As in footnotes to Table 1.
NB: A number of occurrences of uranium are not well enough defined to be included in Tables 1 and 2 but are described in Part III, the country reporn.
Source:
Reference 4.
~-~
_c_
_-. =,
i Figure 1 SUFFACE DRILLING FOR URANIUM IN TIIE UNITED STATES MILLIONS OF FEET BY YEAR 50
[
40
~
i Ed N
30 wo g
O l
H l
j 20 H
- El r-10 r
1950 1960 1970 1980 YEAR Source:
Reference 3 and 8
Figure 2 U.S.
CONCENTRATE PRODUCTION IN TONS CONTAINED U 0 BY m R 38 20,000 r-15,000 W
I o
m o
10,000 mz 8
e 5,000 l
5 0
1950 1960 1970 1980 YEAR Source:
Reference 3 & 8
. ~
i i
Figure 3 i
Nuclear Power Capacity Projection l
300 i
s J'
250 l
l uso8 200
<a 4
3 i
n tn
-ri j
Ifigh Case 0
i l
v 150
.a U
rd fle l
'O U
e Low Case l
l i
100 f
50 a
a a
a a
9 a
R 0
1980 1990 2000 2010 Year End
Figure :4 PROJECTED U.S.
REQUIREMENT FOR NATURAL URANIUM AND U.S. NATURAL URANIUM RESOURCE LEVELS (up to $50/lb Forward Cost) i 5
4
[
m Specu-U lative 3
r-mZ O
Possible O
m g
2
=
Reserve.c and g
Resources d
Probable 2:
High
> Demand Low Proven 4
0 8
8 1980 1990 2000 2010 YEAR Source:
Requirements - Tables 5 and 6.
Resources - Table 1.
wn Figurc 1 Long Term Historical U 0 Prices, I; Constant January 1981 Dollars 3 -8
-~~)
i r
. i Ef j li i
t t
. 4 i
r i l ! # j j a i i i ii j i 6
t i ie i
j (i, { i
_i i i i,
e i i i :
I 1 i e i ' I i iii.
i 6. !
? #
il e
iil i }
j 6 j I
.}
j i
e i i i
. 1 I i
i i i i i
e
, i,
i i !
=
. i,,
70 -
l I
I t
I j
l L1_ J _.
u__
_J -
' ' ' ' L
- - e
i ' ' l
. ;_w:
l7-_
' i
,g_,
- _p_ __._ __n
~
-P
-n
,r-
~-
P~~
, i -
i-H T ~-*~ M g-T-
-r
-- r -",
7 i-*",,
1 F- - -
i 4 i
-~
60
- v..
- :q.
i ' i i ' !
i J ;_ i g\\ t l'
{ i
' i i
e e i
t
! _, 4 I
' g i i
- i i
3
+
! ! ! ! t i i
! Iia !e i
!\\
e i ii
- _ w -
.6
,'ii
,T L1,_ n,, i i
,. i
- 1 i
i
- i i, i i
., i
,g..
i, i.
f
_ ' i '
i
' !'i i I 8
3 1 II f '
_ Aj j l !.
l'f 8 I i i i !
4 i i ! I t !i!'ii i 1..
e i ' i i i 1
- L i. i Q:,1,-t i i
wi
-(] TT. 7Ii,-'ri g' '
i i i i i I
, i.i !
i { i { i i.ii i. i.
i i i i i.
i l
,i i i
+r~!,
. i i ; j i1
_i 1 ', 1 i i t- -'*
, g r-i i e i
Li L_. -
.r
- _.,1. _j '
' i a
I
' i t !.
t i I:.!
i i
i
_4 M ', '.
,' i,,'
Purchases by
' i 1
50 - 4. ' '
4,
t~ ; b. e Industry i i.
i i !T
,,i.
, i 4
i ii,
,.. i i i !,
i,, i
_-._ g!
..t i I
. i ! i i !!1
! i i
, i !, i
!.ii, l
t..
3.i i!
iL i
i 9
! !I i
! i8 I i ' '
'I
!i i
!I i I i I i !
ii.'I
. i
!. t ! I i l' i 6 v9 !
i, i
i !,
..ii 4,
i,, i i i i i iyi i i s
,,4
, 4 !.. i st
,, i i,
i
, 4
'C i I i i !
e I it i e I e ij i
s i i 1 i i
i i i N
i i t, ji !
i e i i i i ! l e !
i
'-t m{r mm s i ii - *j i ij,i I i
, e i i i i,
6 i ! I N,xi i i, i 6, t i t i 6
i t,,
e r i
, 6
- j i ii i ! !l i i j i i i i
1 4
, i ;
i i i.,
O
'T i
m 40 m' ',
,4
,, x.i,,. -
1,1 u.
3
, i.
,e i !
.( ;
i e ! #
e e i i.i j,
., !,ii*e i i j j T( i...
! e { ! l j i
, i !
6
,Gy
. 6 i i i, e i i N
6 i-'l i i e 6 i i
i y_p',.
l i
.. i,..
i.
g
,, i t
i i,,
.\\i i i, I i
,, i, i l, i i
.je j i
a i I l
\\l i[ i l i
! e i ;{
a r
a g
i e i i
1! i e i !
i.. i.
1 i,i,.
i r.
i T! !Il *
- i g
i i, t E',
.i i,
e ;
! j i
, i. i i
i i, :,,,
i i i
,Ji j
. a e i 6 I
5 i,
- jili, i *
'r i i,
.... iii i
i r.
i f,-
r;,
,,,,ii,ii i i,,
i e.,gi!,
i pWi
,,,,,,,ii i,..
- i i
i,ii i
g
_gi,\\,
i I o 30
, i,
i T,,
, i U
0
t
_D,,_ _,_j ',,
i t-k
!,'l',,,
\\l..'
i,
1 i
w.
4,.
,i
,e g:
a e
i+i f-
. Q)$y ' i e
[
ie p,
i i t iii i i i
, i e e 1!
p u
i i.i.
g
/.
. i.
i i i
i i,,..
l i i H/
'l ll,r 6,,,,
'll l
-1
,-- /-.
,,l i
l
.x t
.i, y
v, 1
20 i
'zu o
> >i
': T Purchases by AEC:
!/, -
i l
- d L
i ii i. i 4 1 m.
.i i
..a Q = Average Annual Price Pald by AEC
.:_1 4
1 d
_,i (Adl us ted) d i
10
' O = Average Annual Prices (NUEXCO Value-Adjusted)
Y-
a = January 1981 Price (NUEXCO Exchange l
Value)
~2 l
~I e
' ~
' ~ -
0 S
50 55 60 65 70 75 80 Year Note: Prices are adjusted to January 1981 dollars using the Producer Price Index for Industrial Commodities.
~
Figure 6 Historical U O Price in Current and Constant Dollars 3-8 Monthly Prices Vs Time
-- T--
(.4 q. _._
,.,.r--
- r--
- -r-.'..
., _ ~ ~.- -.,.
r+ + - *
.u g+ :__-
i,:
- + - * *
.-r---
s
_ - _ - _ - -.__.u..._
- .i.
70
.h 1
. i. J a.4.+ '.
_y 4+..
u
=__
\\.
.,.a
. _7t
. z..
i
,,- a _;
a._.t
.r
,2 n
._=
u.a
- L.
iL 41 J.di.L.
1.
h' 41' a._j
.a_
,,_M.. -y...
+- a
,. 1
.h._.
, 4.
C..
._ N., 4
.g
- .g.a g.
60 1..
" trn
- d. _ -
d, N.,._,m
/-
t.
i t
y r.u W..-. a._i
._ J
{.';
p
- l,*
-a J '
.2 ifp2... _
- p. -
u2 3',
_2 3;_
Qa.y. _ _..
.2u,.
a__ _.
.s.a
- ".;; r.,g
. i -.
Lat
. :.a_
2_
- . y y-.g.._,
m x
p;;.
't'
_i..
11 g_
!L'.
- I j p; i
w u
.a
_ p.a 1 __...._:.
.J _..
61 l
'4Lt L
_-._f--- - : jL
'a c
t
' q.1.
8,14 j.,p i *
.4 1L..
-l-1_.
17
?
- t-r-"
i.
4
.n.
2u p.q.u..,;; '.
1.2 '
t o
.. 44
. _1
- - w a
.,,. u. w i-
- i
.L_:
eq
.a ii a;
ul-
_.2.1_p
, y,e 3.;
_1
.t i
i o
4Lt 1
40 3
I-
.O
- I
./
..;. aA 4
'e
L.4 :
_ O!
l-if 4Q 4 g,,,, _.
'd g,. l.,.;.
p
-i Constant
..' n1 '
4 t.;
i-
_,. January 1981 Dollars -
..e 2;
brte x
2<
'~
m"
'~~
2 m.
./ :
-tti,tp-e %..g:,.',
-t-
. 7 p
..y.._.._.._~ y.. ___._. _.,.
.y 7
.;u, m_
y 7..--
..... w.
trT-- +r,,
- -.^ Q...
c)
. 7 4t PTt -
- t *--- T *--
pq.
. aa
.8 I
- 444
,.4 4
- e4 14.
.12 _L a..'_
. 1 1~
,.,_..j r'
8 L
- - J4- _.f
.2Li
. 1u n.' ; -.-- 14L.
' *i' al.L L 14 4LaJ..
't pa4; a.;ui 2. _;t t 3 m
1 p2
.22._
.'2
/.a r+,
a _.;
1H"
" : + - - J---l ! '.. FF- - r--'2
_-- H e{, -
_t.
. :-_.a 2.
.t; w.
au 2.
A....
a ;_.
et
.Ni.% p. f - g.4
- '-f O. *N E *** N *l-M
[g Edb h
Afl EA 9.;..
u.
k.
9,..- t*
---**'e*~' * * * ' * -
f
+-f. d.
g
,.. 4 20
., -_7
- 7 p.7
-.+
L ;,.
_. p..
.\\.
r'd f t*
+ r_ t d- - * '... + - '. +
.a
_ a.e _p-
- 9..p.
.y3 p-.
..L 1
i A;.._
+1
..h I&.
4 q : _ _ q.2 _w'.
.,.p j.g,- gpp 4.,g, ag.
- i,
t,22 4 p2 9
.2 e
7y.
7,-
r 77 p...
L
->__ a_
.. ;1L
. 4
.444
- JJ.'J+1 &.
4' 4
24 :
g...-M....
my Dollars
'M itu
.~
4,..
- .n... y
- .y
- :;i
- ,-. inu.. Then-Current i.~ i H+ L'! ;' ttr>+ P4-t F,
- .4,;iM 7, ;H4 -W.
a
_t..
u n.
7_7 If rH Hu ae to
+ +F i :
. F4 Fttr -t - r+ *H"i 2
-' " t-+--
+-
H 7.._. P. iMtr. _... a; !I'I.4}_4
[i i r r" %.....++ i. +' cryu*
t
+ + - - - e1 44, 44 - '+
l '
i- -.
4'4 _a 4 ph.i 4j+.r.4 I'I-;
- - t 4.d.
7 yjl4 t
eM4a
'ff in A4 44' '4{,p y.
. g,2 21.p"
{; Ja a ;_;. 4i Q
.*l' r,::'. G H++ - +' '-t-HAN +'-t
-H HH" r
- rr t*+-+ J-; t r u.,x,'. ',,. p;a.. a,za..a =,. v, f.,:
a.
T
. u,st w +.s.a t,1 e, T,,- a.., u. y. n, :.
.sT..,T s, 1<
.=
L. u..
a
"{,"- -
.'T] '
i i.
'+i i
6 Hb
! +t -1+- HM +4 N 4' -*4 ++---
' - ~ +
--+
- tt ' ' J !'t' '- - rt T lt*i' t
, fY-H+ r?
t_m
..r.,
4 u,,
- it-**d f' I A*-
W-4 2H4
{1+;-
1
+
th44
'4 -t
- t* t*$
b*d*
- 4at.4 E+'t+- A M
}$E h 4 ' t A+ kt*h.!!!l f M*-i tr T*+-+
- M E'
~
t 0
e.
,~
- u...
e.
v.
e.
e.
...~
v.
1072-
- 9 M 19 M 19 T 19 74 19_77 19 78 1979 19 M 19 81 _.
(Exchange values reported by NUEXCO, and adjusted herein)
FIGURE 7 Historic and Projected U S e
end 38 (in Constant January 1981 Dollars) s
.Z:f.z_:Z Z
- z.p _:L
-r d.
h h.
f:
~~
~
z f
Z~ Z:$ ZT Z1
~
- zz-ZZ o
+
,I[ g &
+
vi
,9 7-a_. :2Z zr
-T-j.
-~
- E n z__ z-"
_r z z-
- r z.. Z Zr
.z-: :Zz z-..Z._ 4__...
T Zn ir J
~~.
}-,
t g
v
..{i
~
~
~ J~
ZZ: -id ZZ
- Z::
_h _1Z~ :Zr ME
- 1. 1..lzt Z
- r ZZ
. lz -_.i [
- j g-
=
- :=
=-
_ =
2
- =t z;=
=Z
- =
==
=
g
=_ p
- n p g:!% I 8
~
~~
~
4 W
T 4j
.r g-zx pg m
1 60 I~~
t
~~~
~
~~
~
~~~
~
~
~~~
~~~~~
~-
~~~
y
~~
~
- ~.
~~
~~~Y
~
z
' :t J L]
Projecrion bA
~
C
~~
L Z
=:
z
=L
- =
=
- u-
_ =
- 2
- Z:
- :z
_t-
~
~
11
.._l
~
~ ~TZ ZZ
- 1Z Z__
ZZ Z~~
T~T:
_.1--
~T :TZ Zi~~ -Z
~
~~~
ZT~
~~~
~
~
f~
$p $ ((~
= E2 T2 ZIPurchases byZ ZZl ~~%
t/
y
-+ t
=
- = =
=
=
=
=
Z=
==
==
=
- ='= =
=
z_
- : i l
El ZT T11 Z
TZ Z[
f I
I~
T =zr-- -=- =z-xx
_ :r-Industry
.xx -Q xx
-2 7x_
- -:n ugr4 t-gi L
so t
=
k_
=
=
=
=
z=- ::y =
=
=
=
2:n:
y
,o, a
y t
40 T'~
~
~
l
~
~
n L1
^
+
x a.... P K-
= :-z
_ =:=
- =\\ =
==
- tifa z
l i f w
_.r d
~
~
~ 'k
-~-~
~
~
~ ~ _-
-~~-~~
--'H m
p.
..__4 LZ--
-f
-~--
~~
~
r
__ -]
m T_
_1
~
Z
_ E-
T ZZ ZZZ ZZ l_
E Z xp Z:
ZZ l_
Z
~~
~
^~
~
j[
~
':[ Q
~ f
/z:
- Z JZ
. z-- Zr JZ
~ z:. Z:1 Z:
1
~
~
g, f
L
~
c.
n 3g
- x_:
_ Z: =
~ Zz m
f =
=
z nz~ 1__
z z;-
4 8
20 P
chases S
/
- l Y
p
~
E l~
Z ZZ Zi Z~
T
~
~
~ q Mi: =
!zN?%
mx xx 2.
- =
u
__ cfx =
cx n
_ x1L T.
=
~
4
^ec
-: 1_
Z-t- =
c-- :---:
I-- =
. =
-- =
==
- =
---r
)v f:1
- A$
_fn Q
=
=
r:
- =
=
- - =
zi j7.j j~~~
-r z
z- :
- r z
- x... 9N:n zu: zz 1
cx z_
r
- x1
~
y.:
4
~~
~~{
~
~~
q'_
. 4 y
' 1 gr.] ; q g g-
- g. g-g- g
]:
. }
q:
{
}
~
~
=
=
=_ :
=
- =__
. =.
2.
=
=
=
=
Z 0
1950 1960 1970 1980 1990 2000 Year (Midpoint)
FIGURE 8 Projected Uraniuin Price Trend and EUREKA Program Results for Three Demand Cases 100 80 m
Om f
o g
Projected Trend
}
60 I
~m s
cn
~
High Demand 40 Mid 8
Case d
n.
20 0
1985 1990 1995 2000 Year
APPENDIX A DESCRIPTION OF EUREKA URANIUM MARKET MODEL Introduction The EUREK7 program is a computer model of the domestic uranium market which simulates the interaction of current and projected demand and supply, projects the extent to which the supply can be changed to meet demand, and forecasts the price associated with achieving this supply level.
The program has an extensive library of information on the nature of U.S.
resources and on the costs of finding, developing, and producing from these resources.
These libraries are kept current and are used in the program to determine when, with a specified rate of return, new resources should and can be developed and put into production to meet projected demand.
The program, which basically simulates the decision-making activities of buyers and produ :ers, can accommodate many input assumptions regarding these activities in order to analyze the market effects of a wide range of decision-making factors and related conditions.
The program can also be utilized to test pricing sensitivity to various input parameters.
Methodology In broadest terms, the program attempts to model buyer and supplier decision processes.
Of these decision processes, the two most important involve suppliers' decisions concerning:
(1) when to put new properties into preduction, and (2) how much exploration to conduct.
c Two main factors influence the f irst of these decision processes:
(1) the short-term economics of starting new production, and (2) the long-term need for such production.
The relationship between these two, often opposing consider-ations is one of the most important and complex decision processes in the model.
Similarly, opposing considerations influence the second of these decision processes, the short-term economics of exploration and the long-term need for such exploration.
For example, there may be a considerable need for exploration but little incentive in terms of current prices.
The weighting of factors which influence decisions by the model may be altered.
Such factors include, for example, the presumed ability of the suppliers to clearly perceive future demand or the average industry conservatism in making production investments.
These subjective conditions are justed by a number of variables which range from "conserva-t,7e" to " speculative" viewpoints and, therefore, has latitude in the decision modeling to reflect the user's perceptions.
Physical and cost bases for decisions are also entered into the model.
For example, a value for ultimate level of resources is entered and the program will develop reserves based not only on the exploration efforts, but on adjustable assumptions on the success of finding uranium for various levels of efforts.
These assumptions may be further subdivided into finding success versus depth, and so forth.
Cost parameters may be varied at successive levels of detail.,_.
The buyer decision factors which may be altered by the user include such items as inventory level, conditions for buying or using that inventory, and average contracting periods.
The model projects the future by building on the
" instantaneous" conditions in the calculation or decisions made for a given year based on contemporary conditions.
For instance, it allows normal (but again, adjustable) time lags to cccur and then implements these decisions.
The implementation creates new conditions of supply, demand, costs and reserves.
In light of these, a new series of decisions is made.
- Thus, all previous actions feed into the present and the present feeds into the future.
As the calculations proceed, the prevailing economics and even the projected uranium demand may change.
Initially i
established conditions are not static.
For example, cutoff l
grades, and hence production capability, change with market price; initially predicted demand can be caused to decrease or increase, causing a change in forward planning; buying into inventory may change depending on price and production capac-ity, etc.
All these changes are reflected in their influence on contemporary decisions.
Each year, the short-term supply / demand pressures are the primary driving force as to whether the market price will increase or decrease.
There are some additional price adjustments made on the long-term considerations of exploration i
needs.
As with all other functions that cannot be expressed with established analytical form, the user has some control over how these pressures affect price.
Finally, the output is not just market price.
This would be almost useless in the absence of other information.
Equally important to these stuoies are projections of mine and mill capacities, required capital expenditure patterns, exploration activities and results, average prices for forwaril deliveries, reserve status, and several other factors.
Because the program is one of complex feedback, it cannot easily be described in the order of a calculational sequence.
Rather, it is best understood as a series of operations.
All through the operations, the forecaster may insert his own judgment.
Data Sources Source data fall into two broad categories:
(1) those pertaining to geology, and (2) those pertaining to costs.
The geologic data source is primarily from DOE compilations.
However, the program requires more detail on reserve statistics than is actually available, and the DOE data must be combined with certain interdependent assumptions which require addi-tional analyses.
Cost data come from published sources and independent analysis.
Mine cost data all fall into this latter category.
Essentially, all cost data are user adjustable.
_4_
... o JOHN M.
VALLANCE Summary of Qualifications and Experience EDUCATION B.S.,
Chemical Engineering, Rensselaer Polytechnic Institute, Troy, New York, 1952 Graduate, Oak Ridge School of Reactor Technology (ORSORT),
Oak Ridco, Ter.aessee, 1958 EMPLOYMEHT EXPERIENCE 1967 - present Pickard, Lowe and Garrick, Inc., Wa3hington, DC Consulting in preparation of nuclear fuel bid specifications; evaluation of nuclear fuel supply proposals; negotiation of supply arrange-ments; administering on-going supply arrangements; preparing nuclear fuel operating plans, supply requirements and procurement strategy; planning and negotiating enriching services arrangements i
with DOE; preparation of special analytic studies regarding fuel supply; nuclear fuel cost analyses and projections; projections of the component costs of nuclear fuel materials and services; projections of nuclear fuel and reactor performance; risk analyses for nuclear power or other facilities concerning aircraft hit prabability; preparation and presentation af testimony at licensing hearings, State Energy Commission hearings or PUC hearings; special studies of the uranium market; probabilistic analyses of supply and demand for nuclear fuel and of fuel costs.
1959 - 1967 U.S. Atomic Energy Commission -
Washington Headquarters, Germantown, MD Engaged in the civilian nuclear power progrLat of the Division of Reactor Development.
Participated in planning and evaluating reactor programs and alternate fuel cycles.
Active participant in most of the AEC studies on the utilization of nuclear power for peaceful purposes during 1959-1967.
Served as an official U.S.
Delegate to and presented a paper at the Third International Conference EXIiIB'I ft
..e JOHN M. VALLANCE EMPLOYMENT EXPERIENCE (continued) on the Peaceful Uses of Atomic Energy, Geneva, Switzerland, 1964.
Delegate to and presentor of a paper at the Inter-American Conference on Economic and Technical Aspects of Nuclear Power Generation in Latin America, Mayaguez, Puerto Rico, 1965; U.S. A.E.C. participant and presenter of paper at the World Power Conference of 1966, Tokyo.
1955 - 1959 U.S. Atomic Energy Commission - Hanford Operacions, Richland, Washington Participated in planning and supervision of the production of special nuclear material and in the reprocessing of irradiated fuel.
While employed at Hanford, U.S. ASC sponsored his attendance at the one-year graduate level program of nuclear engineering, the Oak Ridge School of Reactor Technology, which involved six months graduate study at U.C.L.A.
and six months further work at Oak Ridge National Laboratory.
1954 - 1955 American Brakeshoe Company - Mahwah, NJ Engaged in chemical engineering in unit operations for the process development for the manufacture of various friction materials.
1952 - 1954 U.S. Army Served as a Lieutenant in the Chemical Corps.
Primary assignments included Post Chemical Office and Instructor at a Chemical Corps School.
PROFESSIONAL MEMBERSHIPS American Nuclear Society Atomic Industrial Forum l
l.
JOHN M.
VALLANCE i
SELECTED PUBLICATIONS The Effects of Current U.S. Nuclear Energy Policy on Uranium Enricting Operations.
Presented at 84th National Meeting of the American Institute of Chemical Engineers, Atlanta, GA, Feb 1978.
The Throwaway Fuel Cycle (Co-authdr).
Presented at'Alv Fuel Cycle Meeting held in Atlanta in April 1975.
Nuclear Fuel Capital Requirements, 1973-1990.
Presented at AIF Seminar, " Nuclear Power-Financial Considerations,"
Monterey, California, September 19, 1973.
Uranium Enrichment - A Report of an Ad Hoc Forum Policy Committee, 1972.
Principal author of the section of the report on Economic Considerations.
Power Plant Economics.
Presented at Southern Interstate Nuclear Board Briefing on Nuclear Power to the Coal Industry, September 1966.
Nuclear Electric Power - Economics of the Conversion of Nuclear Energy to Electricity.
Presented at American Chemical Society Fuel and Energy Symposium, April 1965.
Economic and Financial Aspects of Nuclear Power Generation (Co-author).
Presented at Inter-American Conference on Economic and Technical Aspects of Nuclear Power Generation in Latin America, Mayaguez, Puerto Rico, February 1965.
Fuel Cycle Economics of Uranium Fueled Thermal Reactors.
Presented at 1964 U.N. Conference on the Peaceful Uses of Atomic Energy, Geneva, Switzerland (paper No. 247).
Civilian Nuclear Power - A Report to the President.. 1962:
~
Principal contributor, hublished by USAEC. __-__ _._