Forwards FEMA 810714 Memo Assessing Changes Made Since 810603 Rept Re Emergency Preparedness
ML20009G939
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/31/1981
From: Hoefling R
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Hand C, Johnson E, Kelley J
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OL, NUDOCS 8108050279
Download: ML20009G939 (2)


Text

.

Il July 26, 1901 Janes L. Kelley, Esq., Chairr.an Dr. Cadet H. Hand, Jr.,

Administrative Judge Adninistrative Judge Atonic Safety and Licensing Board c/o Bodega l'arine Laboratory U.S. Tsuclear Regulatory Comission University of California

, y ~g % g Washington, D.C.

20555 P. O. Box 247

., K Bodega Bay, California 94923 7

Adainistrative Judge

/S e Q'v l'.rs. Elizabeth B. Johnson, ey

'c

(

l Cak Ridge, Tennessee 37830

~

h.',' S[py i

  • D Oak Ridge National Laboratory P. O. Box X, Building 3500 i~

pf jy In the !!atter of

/

i SOUTHERii CALIFORfilA EDISON C0!:PAfiY, ET AL.

(San Onofre 1,'uclear Generating Station, Units 2 and 3)

Docket lios. 50-361 OL and 50-362 CL

Dear ikcbers of the Board:

~

In its ruling with respect to crergency preparedness rade on the record on July 10, 1981, the Board noted its interest in having in hand another report froo the Federal Energency I'anagenent Agency (FE!!A) assessing changes that have been nade since the June 3,1931 report previously provided to the Board and the parties (Tr. 3572).

Enclosed is a July 14, 1981 t'ecorandum to Brian Grines of the fiRC Staff fron Robert J. Taske of FEi!A which addresses the subject of another FEMA report.

DISTRIBUTIO.'1:

Sincerely, NRC Central LPDR/PD9s FF (2)

(6 S/E/C Rutberg Richard K. Hoefling Chandler Counsel for fiRC Staff Vogler Hoefling

Enclosure:

As stated FMiraglia HRooa gSol cc: Janice E. Kerr, Esq.

David R. Pigett, Esq. Chron.

Alan R. Watts, Esq.

Richard J. ilharton, Esq.

5

!!rs. Lyn Harris Hicks Charles R. Kocher, Esq.

/

David !!. Gilman Phyllis !!. Gallagher, Esq.

//l Charles l'cClung, Jr., Esq.

Atonic Safety and Licensing Board A. S. Carstens Atonic Safety and Licensing Appeal Board Secretary

  • SEE PREVIOUS YELLOW FOR CONCURRENCE OLLD E

0 ELD

..DE

. ],,..

x.......

.....ECh enbury omce) sun m a) gan:

RH LCh le JRutb g 7/

.. / 8.1.

..zs.i..

. (z...

..z.u1..

.. /..

.../3.....

8108050279 810731 N PDR ADOCK 05000361 OFFICIAL RECORD COPY uso m i m - m uo C

PDR

)

,, g nn c ry

-~,

N

\\

~

+

July 22, 1981 James L. Kelley, Esq., Chairman Dr. Cadet H. Hand, Jr.,

Administrative Judge Administrative Judge Atomic Safety and Licensing Board c/o Bodega l'.arine Laboratory U.S. Nuclear Regulatory Commission University of California Washington, D.C.

20555 P. O. Box 247 Bodega Bay, California 94923 Mrs. Elizabeth B. Johnson, Administrative Judge Oak Ridge National Laboratory P. O. Box X, Building 3500 Oak Ridge, Tennessee 37830 In the Matter of SOUTilERN CALIFORilIA EDISON COMPANY, ET AL.

(San Onofre fluclear Generating Station, Units 2 and 3)

Docket Nos. 50-361 OL and 50-362 OL

Dear l' embers of the Board:

In its ruling with respect to energency preparedness rade on the record on July 10, 1981, the Board rated its interest in having in hand another report from the Federal Emergency Managenent Agency (FEMA) assessing changes that have been made since the June 3,1981 report previously provided to the Board and the parties (Tr. 3572).

Enclosed is a July 14, 1981 l'amorandum to Brian Grimes of the NRC Staff from Robert J. Taske of FEt'A which addresses the subject of another FEHA report.

Sincerely, DISTRIBUTION:

LPDR NRC Central i

Richard K. Hoefling FF

)

Counsel for flRC Staff Sp Rutberg

Enclosure:

As stated Chandler cc: Janice E. Kerr, Esq.

David R. Pigott, Esq.

V gler Chron.

Alan R. Watts Esq.

Richard J. Wharton, Esq. Hoefling Mrs. Lyn Harris Hicks Charles R. Kocher, Esq.

gjglia r

David W. Gilman Phyllis !!. Gallagher, Esq Charles McClung, Jr., Esq.

Atonic Safety and Licensing Board A. S. Carstens Atonic Safety and Licensing Appeal Board Secretary AL /

o"'c4.... 0 % D.......

4.Q E L.D.......,,,,,0 EA D,,

= "* 4.R(1,qe,f,1,,i,ng;,a; m,LGban,d,1,e,r,,,,,JRu.tb.e.a....

.. ~.. _. _ _ _

^ " > ?L....... /.8.1....7.l.N.I.81.... ?/...../81,,,,,

  • " ' *3" *2
  • NRCFORM 318110,801 N RC M O24 0 OFFICIAL RECORD COPY

.Jr s 5wo:n

/9 i Federal Emergency Management. Agency

,k 5,

Washington, D.C. 20472 July 14, 1981 riemorandum For:

Brian Grimes Director Division of Emergerrcy7reparedness Office of Inspection an& Enforcement '

U.S. Nucleai Regulatory Commission I

Hobert T. J[aske/

/

From:

fgg Acting Directbr Hadiological Emergency Pre,paredness Division State and Local Prog (am jiupport

~-

Subject:

Emergency Preparedness and Support of San Unofre Nuclear Generating Station (SONGS)

In your June 16, 1981, memorandum you asked that we:

1)

Specify which of the deficiencies identified in the State and local ).lans and joint exercise in support of SONGS must be removed to allow a FEMA finding of adequate offsite preparedness;

2) Provide a schedule of actions FEMA is taking to reassess the offsite preparedness; 3)

Clarify that th'e evaluations included in our June 3,1981, memorandum do not apply to the low power operation of SONGS.

Item 3 is the subject of a separate memorandum.

The substance of item 2 was the sub. ject of a letter to you dated June 26, 1981, from K. P. daskin, Manager of Nuclear Engineering, Safety, and Licensing, Southern California Edison Company.

We have confirmed with FEMA Region IX that enclosures 1 and 2 of this letter represent agreed positions concerning FEMA's major concerns,

)

)

what needs to be done to correct them, and SCE's proposed actions (including

{

training) to assist in correcting the deficiencies.

FEMA Region IX will monitor the actions promised by SCE particularly as they relate to the State of California and the local jurisdictions.

FEMA Region IX will provide us with a monthly status report, which we will make available to 1

you, beginning with the period through July 31, 1981.

This report will include requirements for, and the results of, any tests, drills, or a mini-exercise.

Our current assessment is that another complete exercise will not be necessary but rather several limited ones to test specific systems or procedures.

The October 15, 1981, date for essentially completing the correct ive act ions would allow FrMA Hegion IX to complet e its evaluat ion we ant icipate providing NMC with FEMA findings and de t e rminat ions about Nosember 1, 1981.

This timing assumes that the State and local governments will make commitments that complement the commitment made by SCE.

FEMA will encourage the State and local governments to make such commitments.

Please keep in mind that these commitments could be affected Dy the expressed desire of the State of California for Emergency Planning Zones larger than required in NUHEG/0654 FEMA-REP-1 R cc:

Palumbo, Dir. Hegion IX