Forwards SEP Topic Assessments Schedules Re SAR Proposed in NRC
ML20009G896
Person / Time
Site: Yankee Rowe
Issue date: 07/31/1981
From: Kay J
YANKEE ATOMIC ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-RR FYR-81-116, NUDOCS 8108050203
Download: ML20009G896 (3)


Text

_ --- -

l l

i YANKEE ATOMIC ELECTRIC COMPANY

~

P 1671 Worcester Road, framingham, Massachusetts 01701

,Yaixes July 31, 1981 (4

4[

[f-FYR 81-116 j

gN'-

"Ja United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation J-I,UG 0 41981 * %

Washington, D.C. 20555 p

\\

camassat Attention:

Mr. Darrell G. Eisenhut, Diractur

/

Division of Licensing D

to

References:

(a) License No. DPR-3 (Docket No. 50-29)

(b) USNRC Letter to All SCP Licensees, dated suly 7, 1981 Subje ct :

Systematic Evaluation Program (SEP) Topic Assessments

Dear Sir:

This letter responds to your request that we review the schedule proposed in of Reference (b) for completion of safety assessment reports (SAR) for the remaining SEP topics. This review has been conducted and a modified schedule is presented in Table 1.

We feel that this schedule is consistent with the SEP redirection, yet allows sufficient time for qualit7 topic safety assessments to be developed.

We wish to note that Table 1 reflects only those items from your schedule designated as licensee topic SAR submittal dates.

For other topics designated in Enclosure 2 as being developed by the NRC or its contractors, we commit to an expeditious review of the draft safety evaluation reports, consistent with other requirements imposed by the NRC.

Furthermore, in a meeting held on July 15, 1981, you requested additional commitments to provide sufficient resources to support the proposed SEP redirection approach. This letter will, therefore, serve to reconfirm our intention to complete the Systematic Evaluation Program in an expeditious manner.

We trus t you will find this information satisfactory. However, if you have any questions, please contact us.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY a fa J. A. Kay Senior Engineer - Licensing JAK/sec fh\\

eggegggggagggggg, g

P PDR

o-YANKEE ATOMIC ELECTRIC COMPANY TABLE 1 Topic.No.

Title Sch-aule II-1.A Exclusion Area Authority and Control 2/15/82 II-4.D Stability of Slopes 2/15/82 II-4. F Settlement of Foundations 'and Buried Equipment 8/31/81 III-2 Wind and Tornado Loadings '

1/15/82 III-3.A Effects of High Water Level on Structures 2/15/82 III-3.C Inservice Inspection of Water Control Structures 12/31/81 III-4. A Tornado Missiles 1/15/82

17. I-4. C Internally Generated Missiles 2/15/82 III-5.A Effects of Pipe Brcak on Structures, Systems and 10/30/81 Components Inside Containment III-5.B Pipe Break Outside Containment

'10/30/81 III-7.D Containment Structural Integrity Test 2/15/82 IV-2 Reactivity Control Systems Including Functional.

8/31/81 Design and Protection Against Single Failures VI-l Organic Material and Post Accident Chemistry 2/15/82 VI-2. D Mass and Energy Release for Possible Pipe 12/15/81 Break Inside Containment VI-3 Containment Pressure and Heat Removal Capability 12/15/81 IX-1 Fuel Storage 12/31/81 IX-3 Station Service and Cooling Water. Systems 8/31/81 IX-4 Boron Addition System 8/31/81 IX-5 Ventilation Systems 9/30/81 XV-1 Decrease in Feedwater Temperature, Iacrease in 12/31/81 Feedwater Flow, Increase in Steam Flow and inadvertent Opening of a Steae Generator Relief or Safety Valve

'XV-4 Loss of Non-Emergency A-C Power to the Station 12/31/81 Auxiliaries XV-6 Feedwater System' Pipe Breaks I side and Outside 12/31/81 Containment (PWR)

XV-8 Control Rod Misoperation (System Malfunction or 12/31/81-Operator Error)

e To pic No.

Title Schedule XV-16 Radiological Consequences of Failure of Small Lines 12/31/81 Carrying Primary Coolant Outside Containment XV-17 Steam Generator Tube Failure (PWR) 12/31/81 XV-19 Loss-of-Coolant Accident Resulting from Spectrum 9/30/81 of Postulated Piping Breaks within the Reactor Coolant Pressure Boundary i

--.