Forwards IE Insp Repts 50-266/81-11 & 50-301/81-13 on 810601-30 & Notice of Violation
ML20009G875
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/15/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20009G876 List:
References
NUDOCS 8108050171
Download: ML20009G875 (2)


See also: IR 05000266/1981011

Text

.

.

.

.

,

.

l

] lh

I

4'

79

Docket No. 50-266

/>

,

Docket No. 50-301

- {-

j ['y

,

lf) 6

~

..

I A (h

Wisconsin Electric Power Company

[

~4 h O.j

'-

ATTN:

Mr. Sol Burstein

-

3

Executive Vice President

1

%, ,,2, ,'N c1

/ Y.J

Power Plants

'l

231 West Michigan

x

s u /' ,

D~i$ '

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. G. Guldemond

and R. L. Hague of this office on June 1-30, 1981, of activities at Point Beach

Nuclear Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24

and No. DPR-27 and to the discussion of our findings with Mr. G. A. Reed at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the

inspection.

Within these areas, the inspectica consisted of a selective examin-

ation of procedures and representative records, observations, and interviews

with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as described in the enclosed Appendix A.

With

respect to the items of noncompliance, the inspection showed that action had

been taken to correct the identified noncompliances and to prevent recurrence.

Consequently, no reply to these items of noncompliance is required and we have

no further questions regarding these matters at this time. However, since we

view Items 1 and 2 as important matters, we intend to pay particular attention

to these areas during future inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you or your con-

tractors believe to be exempt from disclosure under 10 CFR 9..i(a)(4), it is

necessary that you (a) notify this office by telephone within seven (7) days

from the date of this letter of your intention to file a request for with-

holding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such information.

8108050171 810715

[

PDR ADOCK 05000266

g

G

PDR

____ - ___

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. _ _ _ _ - _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ ____ _

____

_

.

,

.

.

,

.

Wisconsin Electric Power

-2-

Company

!

Section 2.790(b)(1) requires that any such application must be accompanied 1,y

an affidavit executed by the owner of the information which identifies the

j

document or part sought to be withheld, and which contains a full statement of

the reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requires the statement

i

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

'

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter and the

,

enclosed inspection report will be placed in the Public Document Room.

!

j

We will gladly discuss any questions you have concerning this inspection.

l

Sincer } O

I

j

injA )

.

.r-

. F. Heishman, Acting Director

Division of Resident and

Project Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

5

2.

IE Inspection Reports

i

No. 50-266/81-11 and

No. 50-301/81-13

cc w/encls:

G. A. Reed, Manager

}

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

,

Boiler Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chafrman

>

Public Service Commission

4

Rill

RIII

RIII

RII

)SSJ

Knop).C

M

(

H

hm

[Guldemond/db

-

Konklin

?/n/81

-

.

.

. -

. -

..