ML20009G863
| ML20009G863 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/23/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML20009G864 | List: |
| References | |
| NUDOCS 8108050157 | |
| Download: ML20009G863 (2) | |
See also: IR 05000483/1981014
Text
l
,
.
FJUL 2 31981
.
$p #LQpdEl ff
'
\\
-
M
Docket No. 50-483
B? u/]yU O 'l 1981u b
-
Union Electric Company
, ** (
"
'
a
ATTN:
Mr. John K. Bryan
~ - -
J
Vice President - Nuclear
k
Post Office Box 149
q,
9
St. Louis, MO 63166
ui
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. S. Love
i
and R. L. Lee of this office on June 16-19, 1981, of activities at the
Callaway Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-139
and to the discussion of our findings with Mr. W. H. Weber and others of
,-
the Callaway staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Uithin these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulatices, a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
,
office by telephone within seven (7) days from the date of this letter of
l
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such informaticn. Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
r/*!
- di
ShAS288Wa!8@i
G
O
O
Union Electric Company
-2-
JUI 2 3 1981
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, a copy of this
letter, the enclosures, and your response to this letter will be placed
in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
d d.]loM
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-483/81-14
cc w/encls.
W. H. Weber, Manager
Nuclear Construction
DMB/ Document Control Desk ' RIDS)
Resident Inspector, RIII
Region IV
K. Drey
Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
"&f
"4 f)L
"3
"D
"'
Love /db
Lee
Ko lin
Wik
ms
Spassard
Noreliigg
7/7/81
1M