!o -

qG.

,j 9

'Public Service Company of Colorado Docket 50-267/81-11 NOTICE OF VIOLATION L

Based on the results of an NRC inspection conducted during the period of May 1-31, 1981, and Lin accordance with the Interim Enforcement Policy, 45 FR 66745 (October 7,1980), the following violations were identified.

l 1.

' Technical Specification LC0 4.8.2(a) states that "the maximum instan-taneous release rate of radioactive liquid effluents from the site.shall be such that the concentration of radionuclides in the cooling-tower blowdown water discharge does not exceed the values-in Table II, Column 2,10 CFR 20, Appendix B, for unrestricted areas."

Contrary to the above, on May 14,~1981, at 1:00 p.m., it was determined by the licensee.that the concentration of tritium in the cooling tower blowdown water discharge which was made on May 12, 1981, was 3.55E-3pCi/cc, exceeding the limiting concentration for tritium (3.00E-3pCi/cc).

This is a Severity Level IV Violation.

(Supplement I.D.2) 2.

Technical Spcification 7.4.a, Procedures Administrative Controls, states in part that " Written procedures shall be established, implemented, and maintained...."

Procedure P-2, " Equipment Clearances and Operation Deviations," paragraph 4.2.13 instructing the reactor operator, states:

" Removes Operation Deviation Sheet from the ' Systems. Abnormalities Book' and initials the form to indicate the system is in its normal condition," and paragraph 4.2.14 states " verifies all subtags listed on the deviation form have

[

been returned."

l Operations Order 81-01 states in part that "the responsible operator l

will initial the deviation form as indicated when the equipment i3 i

normal.

Reactor operator.will check accountability of subtags on the deviation fonn and transfer all paper and tags to shift supervisor."

l l

Contrary to the above, on May 19, 1981, it was determined by the NRC inspector that two deviation forms which had been initialed as " equip-l ment normal," were still in the Systems Abnormalities Book although the system status tags were still in place on the specified equipment.

The system status tags were numbers 2196,and_2249.

This is a Severity Level IV violation (Supplement 1.D.3) l 8108040656 810624' PDR ADOCK 05000267 G

PDR

O O

2 Pursuant to the provisions of 10 CFR Part 2.201, Public Service Company of Colorado is hereby required to submit to this office within 25 days of the date of this: Notice,.a written statement or explanation in reply, including (1) the l corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Consideration may be given to extend your. response. time for good cause shown.

(1//4 /7/

h$']/fcck.

Dated G. L. Madsen, Chief Reactor Projects Branch l

i

-r.