ML20009G733
| ML20009G733 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/09/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20009G734 | List: |
| References | |
| NUDOCS 8108040603 | |
| Download: ML20009G733 (2) | |
See also: IR 05000321/1981018
Text
y y"
-
,i
r reog
OFFICIAL COIT -
D
o
UNITED STATES
.
!'
NUCLEAR REGULATORY COMMISSION
o
U
E
REGION li
k
101 MARIETTA ST., N.W.. SUITE 3100
8
ATLANTA. GEORclA 30303
g.....j
.
jut. 0 91981
[\\5b ie s
'/\\
. Georgia Power Company
-
p'9-
ATTN: Mr. J. H. Miller, Jr.
%
4
Executive Vice President
270 Peachtree Street'
D
ng@y
.
-
- q
Atlanta, GA 30303
Lj
g
Gentlemen:
9
9.$-
g
Subject: Report Nos. 50-321/81-18.and 50-366/81-18
%
,
This refers to the routine inspection conducted by Mr. R. F. Rogers of this
office on May 21 - June 20,1981, of activities authorized by NRC Operating
License Nos. DPR-57 and NPF-5 for the Hatch facility and to the discussion of our
findings held with Mr. M. Manry, Plant Manager, at the conclusion of the
l
inspection.
l
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, intervinws with
personnel, and observations by the inspector.
l
Within the scope cf this inspection, no violations or devica. ions were disclosed.
We have examined cctions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed-inspection report.
Ir. accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that ;tou:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention te file a request for withholding; and (b) submit withb twenty-five
days from tne date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed wch
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
S 601
s
.
8108040603 810709
/
PDRADOCK05000g
G
i
. . -
-
.l
.
.
..
'
jut 0 91981
'
Georgia Power Company
2
l
L
Should you have an: questions concernir.g this letter, we will be glad to. discuss
i
them with you.
,
I
Sinc
ly,
1
k,
TatTJ. Kefig, Acting
ief
Project Brant5 2, Division of Resident
and Reactor Project Inspection
Enclosures:
Inspection Ret ort Nos. 50-321/81-18
and 50-366/81-18
cc w/ enc 1:
J. T. Beckham, Jr. , Vice President and
l
General Manager-Nuclear Generation
(
M. Manry, Plant Manager
j
C. E. Belflower, Site QA Supervisor
l
l
_
G
G
9
4e.
-
,
--c
--
%--
~_
g--
,- ~
c
-
--
y
--
,