ML20009G733

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/81-18 & 50-366/81-18 on 810521-0620.No Noncompliance Noted
ML20009G733
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/09/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20009G734 List:
References
NUDOCS 8108040603
Download: ML20009G733 (2)


See also: IR 05000321/1981018

Text

y y"

-

,i

r reog

OFFICIAL COIT -

D

o

UNITED STATES

.

!'

NUCLEAR REGULATORY COMMISSION

o

U

E

REGION li

k

101 MARIETTA ST., N.W.. SUITE 3100

8

ATLANTA. GEORclA 30303

g.....j

.

jut. 0 91981

[\\5b ie s

'/\\

. Georgia Power Company

-

p'9-

ATTN: Mr. J. H. Miller, Jr.

%

4

Executive Vice President

270 Peachtree Street'

D

ng@y

.

-

  1. q

Atlanta, GA 30303

Lj

g

Gentlemen:

9

9.$-

g

Subject: Report Nos. 50-321/81-18.and 50-366/81-18

%

,

This refers to the routine inspection conducted by Mr. R. F. Rogers of this

office on May 21 - June 20,1981, of activities authorized by NRC Operating

License Nos. DPR-57 and NPF-5 for the Hatch facility and to the discussion of our

findings held with Mr. M. Manry, Plant Manager, at the conclusion of the

l

inspection.

l

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, intervinws with

personnel, and observations by the inspector.

l

Within the scope cf this inspection, no violations or devica. ions were disclosed.

We have examined cctions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed-inspection report.

Ir. accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that ;tou:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention te file a request for withholding; and (b) submit withb twenty-five

days from tne date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed wch

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

S 601

s

.

8108040603 810709

/

PDRADOCK05000g

G

i

. . -

-

.l

.

.

..

'

jut 0 91981

'

Georgia Power Company

2

l

L

Should you have an: questions concernir.g this letter, we will be glad to. discuss

i

them with you.

,

I

Sinc

ly,

1

k,

TatTJ. Kefig, Acting

ief

Project Brant5 2, Division of Resident

and Reactor Project Inspection

Enclosures:

Inspection Ret ort Nos. 50-321/81-18

and 50-366/81-18

cc w/ enc 1:

J. T. Beckham, Jr. , Vice President and

l

General Manager-Nuclear Generation

(

M. Manry, Plant Manager