Text
'-
UFFICIAI. col'Y
.
.
h#
%
'
UNITED STATES
8
NUCLEAR REG;" ATORY COMMISSION
o
$
$
REGION 11
% 'g[
101 MARIETTA ST
N.W.. SUITE 3100
_ -hs
ek
ATLANTA, GEORGIA 30303
./ \\ t d'
JUL141981
&
'S
dNNQ
4' ,f [/M
Tennessee Valley Authority
0
?.V
ATTN: Mr. H. G. Parris
[C'
Manager of Power
O -[#j
-
500A Chestnut Street Tower II
T
!
Chattanooga, TN 37401
,
centlemen:
\\)
[
/
Subject: Report Nos. 50-327/81-25 and 50-328/81-32
This refers to the routine inspection conducted by Mr. D. M. Montgomery of this
office on June 10-12, 1981, of activities authorized by NRC License No. DPR-77
and Construction Permit CPPR-73 for the Sequoyah facility and to the discussion
of our findings held with Mr. W. T. Cottle, Assistant Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it .is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established. Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity . :e considerations listed in -10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Jol
s
l (
-
8108040578 810714
PDR ADOCK 05000327
G
__
-.
_
_ _ . - .
_ _ _ _ _
--.
-
_ =
_ -
- - - - -
-
,
,
,
.
.
J
4
Tennessee Valley Authority
2
g j g jggj
'
,
j
Should you have any questions concerning this letter, we will be glad to discuss
l
them with you.
Sinc ely,
R. C. Lewis /4cting Dir[ctor
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-327/81-25
and 50-328/81-32
i
cc w/ encl:
H. J. Green, Director of Nuclear Power
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff