Nf) L
,i';w Q j
//
.
.
.
.
AN 2 915 E'
In Reply Refer To:
RIV
Docket Hos. 50-498/Rpt. 81-23
h
- 'q
50-499/Rpt. 81-23
'
{}
Houston Lighting and Power Company
'
0 3 sg7 % i
'u
ATTN: Mr. G. W. Opera, Jr.
Dgron
Executive Vice President
C>
,
Post Office Box 1700
.
N' /
{tof
Houston, Texas
77001
4 j
Gentlemen:
This refers to the inspection conducted by our Resident Reactor Inspector,
Mr. H. S. Phillips, during June 1981, of activities authorized by NRC
construction Permits No. CPPR-128 and 129 for the South Texas Project,
Units No. I and 2, and to the discussions of our findings with Mr. R. A.
Frazar and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observation by the inspector.
Within the scope of the inspection, no violations or deviations were identified.
We have also examined actions you have taken with regard to previously identified
inspection findings. The status of these items is identified in paragraphs 2
and 3 of the enclosed report.
In accordance with 10 CFR 2.790 of the Counission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within 10 days from the date of
this letter of your intention to H;e a request for withholding; and (b) sub-
mit within 25 days from the date . this letter a written application to this
office to withhold such information.
If your receipt of this letter I.as been
delayed such that less than seven days are available for your review, please
notify this office promptly so that a new due date may be established.
p/
.s
//
etoe04oS68 $ h e
PDR ADOCK o
PDR..
y'
,
G
.pPU/PSM/&. . . P.S3. /t#1
.RPB.M.h.
.. .
I
..
. .
. .
. .... . ...
om
. ...
.
""+(AP.billips/.dn. . WCr.ossman.
..GLMadsen A.
... JGp 1.iardo.
.
1.i ns . . .
. . . . . .
. ...
....
""* 6/24/.81. .
. . . seg/81. . . . . . 6/g!/8L ...
..g.u/81....j...
t.m...
.... ..
.....
. . . . . . . . .
NRC FORM 318 (10-80) NRCM Ono
OFFICIAL RECORD COPY
-
If#b b
-
[ fy&
,
'
Houston Lighting and Power Company
2
Consistent with Section 2.790(b)(1), any such application must be accompanied
by an affidavit executed by the owner of the information which identified the
document or part sought to be withheld, and which contains a full statement
of the reasons on the basis which it is claimed that the infomation should be
withheld from public disclosure. This section further requires the statement
to address with specificity the sonsiderations listed in 10 CFR 2.790(b)(4).
The infomation sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely
..w 2.n :. .
-a w
c, e. .- . acurr-
G. L. Nadsen, Chief
hactor Projects Branch
Enclosure:
IE Inspection Report flo. 50-498/81-23
50-499/81-23
7[/[f/
bec distrib. by RIV:
bec to DMB:
TEXAS STATE DEPT. HEALTH RESOURCES
IE FILES
.STP RRI
STANDARDS DEVELOPMENT
W. CROSSMAN
ELD
EIB
NRR (8 cys)
LPDR
t
J