ML20009G698
| ML20009G698 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/29/1981 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Oprea G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20009G699 | List: |
| References | |
| NUDOCS 8108040561 | |
| Download: ML20009G698 (2) | |
See also: IR 05000498/1981016
Text
n ,,
1
r
} ';
MUa
li <
j./
-
,
,
_-r
<
f
j
m
. -
,
g
,
,
y
/
~
..
1
In Reply Refer To:
RIV
- k@l / T@'/'
Dockets 50-498/Rpt. 81-16
50-499/Rpt. 81-16
'
AgTRy %.
]2
4
Jw f y
7
& O 3 1981 -
Houston Lighting and Power Company
9
ATTN: Mr. G. W. Oprea, Jr.
ua m a m n m rO.,
-)
" " ' "
Executive Vice President
fy
b<
Q/
Post Office Box 1700
'
g/
Houston, Texas 77001
,
Gentlemen:
'
This refers to the inspection conducted by Mr. J. I. Tapia of our staff
during the periods May 19-22 and June 3-11, 1981, of activities authorized
by NRC Construction Pemits CPPR-128 and CPPR-129 for the South Texas
Project, Units 1 and 2, and to the discussion of our findings with
Mr. M. E. Powell and other members of your staff at the conclusion of the
]
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and repmsentative records, interviews
with personnel, and observations by the inspector.
4
Within the scope of the inspection, no violatias or deviations were identi-
fled.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosed inspection m port will be placed in the NRC's
Public Document Room.
If this report contains any infomation that you
believe to be exempt from disclosure undr 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within 10 days from the date of
this letter of your intention to file a request for withholding; and (b) sub-
mit within 25 days from the date of this letter a wri% ten application to this
office to withhold such information.
If your receipt of this letter has been
delayed such that less than seven days are available for your myiew, please
notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied
by an affidavit executed by the owner of the information which identified the
f
document or part sought to be withheld, and which contains a full stetement of"N
'
,
the masons on the basis which it is claimed that the information should be
5
OS61 810629'
I[
h8yOCK0500049g
,
Q
Eg
EMS A /
. ,g- 3
RPB h h /
EIB
/
RK
'J1Tabia/g"'"REHall'"""]/MCrossMsW
'GLMsdssW g " 'WC56Tdis"8+
omcr >
nh
N':
l'ihr"
'
" * " " " " " " "
,,, _
6/g/81 ~-
6
/81- -
1/29/61- ""
6/b3/81 -
6#f/81" -
6/p/81~4~
-~~~~~~
.
DATE
.
.. .
.. . ...... ...
.. ........ . ... .
.... ..... ........
....... ...........
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . .
- = = -32"24
- hRC F ORM 318 40 BCI NRC M O2.10
OFFICIAL RECORD COP.Y
Old
& [V
,
9-
d- k
j' 7
.
liouston Lighting and Power
Company
-2-
withheld from public disclosure. This section further requires the staterent
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be wit'theid shall be incorporated as far as possible
.
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely.
ouw.u a a..ea em
w. c. s u oAA*
W. C. Seidle, Chief
Engineering Inspection Branch
Enclosure:
IE Inspection Report 50-498/81-16
50-499/81-16
bcc to Document Mgt. Branch for dist.
bcc dist. by RIV
'/- f - [/
7,7 g/
POR
Texas Dept. of Health Resources
LPDR
IE Files
Standards Development
ELD
AE0D
i
l
l
!
l
i
._,