Text
,
-
k
OFFICIAL COPY
%
[pg
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
g.
ae
REGION 11
o,
f
101 MARIETTA ST., N.W., SulTE 3100
/
ATLANTA, GEORGIA 30303
Jtm 0 9198)
Florida Power and Light Company
ATTN: Mr. R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100
Miami, FL 33152
Gentlemen:
Subject: Report No. 50-389/81-07
This refers to the routine safety inspection conducted by Mr. B. R. Crowley of
this office on May 12-15, 1981, of activities authorized by NRC Construction
Permit No. CPPR-144 for the St. Lucie facility.
Our preliminary findings were
discussed with Mr. B. J. Escue, Plant Manager, at the conclusion of the Mspec-
tion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations.of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was. found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
,
requirements are listed in the Notice of Violation enclosed herewith as Appen-
,
dix A.
Elements to be included in your response are delineated in Appendix A.
One new unresolved item is ide'ntified in the enclosed inspection report. .This
item will be examined during subsequent inspections.
'
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any infcrmation that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
~
are available for your review, please notify this office promptly so that a new
due date may be established. Con::istent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
O
G
__
_
_ . _
. - . .
_
_ _
.
_
_ _ . - - _ .
_
_ - - . _ . . _ -
,
2
JUN 0 91981
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
sb?,l:,
R. C.
ewis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-389/81-07
cc w/ encl:
B. J. Escue, Plant Manager
N. Weems, Assistant QA
Construction Manager
.