ML20009G600

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-498/81-21 & 50-499/81-21 on 810609-11.No Noncompliance Noted
ML20009G600
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/01/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20009G601 List:
References
NUDOCS 8108040464
Download: ML20009G600 (2)


See also: IR 05000498/1981021

Text

16 HOS

I

O

'

?.

'

-

.,

=

%.

m,

C

(j

g

4.-

w

.

s

JUL i

1981

In Reply Refer To:

RIV

Dockets 50-498/Rpt. 81-21

-r -

50-499/Rpt. 81-21

d d8w//.g,

1

/\\Q

.

k

ly

I ] fe - 0 3 g7 % Q

Houston Lighting and Power Company

g

(Q-, y# "c @ g wmG

ATTN: Mr. G. W. Oprea, Jr.

Executive Vice President

Post Office Box 1700

CA

h

y,fj

Houston, Texas 77001

'

M'

t g 'i M /

Gentlemen:

'

'

This refers to the inspection conducted by Mr. D. P. Tomlinson of our staff

during the period June 9-11, 1981, of activities authorized by NRC Construc-

tion Permits CPPR-128 and CPPR-129 for the South Texas Project, Units 1 and 2,

and to the discussion of our findings with Mr. R. A. Frazar of your staff at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were identi-

fled.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

In accordance with 10 CFR 2.79C of the Comission's regulations, a copy of

~.f60/

5

this letter Lnd the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

j

/

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

/

'

that you (a) notify this office by telephonc within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

office to withhold such information.

If your receipt of this letter has been

delayed such that less than seven days are available for your review, please

notify this office promptly so that a new due date may be. established.

8108040464 810701

PDR ADOCK 05000498

G

PDR

o "'c ' > . .E

Y

. . . . .EfEdYd'

.RS3A P . RPB.. M ,,,, . EIBAd.,

@ [V,,,,,,,.

,, , ,,, ,,, ,

,

l sum,,,t) DPTomlinson/ nh REHall

WACrossman

GLMadsen

WCSeidle

(

Collins

s

"6730/81" '

'6/30/81"

'7/ 7 /81"" "7f r/81" ' ' "6/W/81" ~ " * "J . g81 "

'"

'"

'"

'

=>

. . . . . . .

. . . . .

.

. ..

...

.

..

.

.

. .. . . .

" " " * * * * "

--

- - _ _

-- .

. OFFICIAL RECORD COPY - - - - - .

. - -

i NRC FORM Jt8 MO 80i NRCM 0140

-

, - -

-

-.

_.

'

'

'

,

0

Yh

Houston Lighting and Power

g;

jgg;

Company

-2-

Consistent with Section 2.790(b)(1), any sucit application must be accomoanied

by an affidavit executed by the owner of the infomation which identifies the

document or part sought to be withheld, and which contains a full statement of

the reasons on the basis which it is clained that the information should be

withheld from public disclosure. This s ction further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The infomation sought to be withheld shall be. incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

,, - i s uo en

.. a

w,c. cac'A'

W. C. Seidic, Chief

Engineering Inspection Branch

Enclosure:

IE Inspection Report 50-498/81-21

50-499/81-21

bec to Document Management Branch for dist.

bcc dist. by RIV

,j , d - ' ^

AD/RCI

</ d-//

PDR

Texas Dept. of Health Resources

IE Files

LPDR