{{#Wiki_filter:9 . . #. OFFICIAL COPY .g% 0 UNITED STATES p F ~ f. NUCLEAR REGULATORY COMMISSION E REGION ll . h [[ 101 MARIETTA ST., N.W., SUITE 3100 . << ATLANTA, GEORGIA 30303
JUL 141981 ' git ,h i G\\ '/h ' ' /Su[h,N \\s 6Nh Alabama Power Company ATTN: Mr. R. P. Mcdonald c- * fdkp pl V Vice President-Nuclear Generation P. O. Box 2641 {E u o d Ji ok Birmingham, AL 35291 . Gentlemen: D . C, i s Subject: Report No. 50-348/81-14 'i' . This refers to the routine safety inspection conducted by Mr. H. Bibb of this office on June 23-25, 1981, of activitics authorized by NRC Operating License No. NPF-2 for the Farley 1 facility and to the discussion of our findings held with Mr. J. D. Woodard, Assistant Plant Manager, at the conclusion of the inspection. , Areas examined during the inspection and our findin5s are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no violations or deviations were disclosed. In accordance wit".10' CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room. If the report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by telephone within ten days from the date of this. letter of your intention to file a request for withholding; and (b) submit within twenty-five days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less thar, seven days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with section 2.790(b)(1), such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part thereof sought to be withheld, and a full statement of the reasons on the basis of which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room. TGol s / . 8108040399 810714 DR ADOCK 05000 - . _- . - - _ _ -_ - ._- - - _ _ - . ., . . .
o . . Alabama Power Company 2 JUL 1415g1 Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, ? / 61/ ,, Paui J. wi p9g, Acdiig dlif ef Projects Branch 2, Division of Resident and Reactor Project Inspection Enclosure: . Inspection Report No. 50-348/81-14 cc w/ enc 1: W. O. Whitt, Executive Vice President F. L. Clayton, Jr., Senior Vice President H. O. Thrash, Manager-Nuclear Generation 0. D. Kingsley, Jr., Manage , Nuclear Engineering and Technical Services J. W. McGowan, Manager-0perations Quality Assurance W. G. Hairston, III, Plant Manager . 9 }}