ML20009G344

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-483/81-13 on 810615-18.No Noncompliance Noted
ML20009G344
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/22/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML20009G345 List:
References
NUDOCS 8108040154
Download: ML20009G344 (2)


See also: IR 05000483/1981013

Text

_

,

-

-

_

._

_

_ _ _ -

-__ _._ __ ___

__

.

.

.

!

!

I

JUL 2 2199f

-

F<fNfl@.nk~U

D

/'UG O 31981> n

.

~

-

-

I

Docket No. 50-483

C-*4

y,s, wcaa uouusn ~-

--\\

comasas

Union Electric Company

's

ATTN:

Mr. John K. Bryan

,

Vice President - Nuclear

cv

g

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. M. Erb

of this office on June 15-18, 1981, of activities at the Callaway Plant,

Unit 1, authorized by NRC Construction Permit No. CPPR-139 and to the

'

discussion of our findings with Mr. W. H. Weber and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days t 3m the date of this letter of your intention to file a request for

withholaing; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

sd/

e10eO40154 e10 m

I

PDR ADOCK 05000483

G

PDR

.

.

Union Electric Company

-2-

Jg( p g ;gg)

j

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection Report

No. 50-483/81-13

cc w/ enc 1:

W. H. Weber, Manager

Nuclear Construction

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Region IV

K. Drey

Ronald Fluegge, Utility

Division, Missouri Public

Service Commission

!

!

!

1

!

l

I

\\

RII

RIII

RIIls

RIII

RIII

)2

s

b/jp

..

.

r

Danie son

Spessard

l

7/15/81

7 fpgy

ql jg,

i

_