ML20009G294

From kanterella
Jump to navigation Jump to search
Requests Verification by 810812 That Prompt Emergency Notification Sys Will Be Installed,Including Schedule,Sys Description & Listing of Potential Problems.Fema Expected to Review Sys
ML20009G294
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 07/15/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Byran J
UNION ELECTRIC CO.
References
NUDOCS 8108040100
Download: ML20009G294 (2)


Text

..

~.

i

.DTSTRIBUTI0ii:

' Docket:Filem bcc:

LB#1 Rdg.'

"" ~ TERA JUL 151981 DEisenhut PDR1 JYoungblood LPDR MRushbrook NSIC GEdison TIC l

i SHanauer ACRS (16)

Docket Nos.:.STN 50-483'%

RVollmer and STri 5D-486 TMurley 2

RMattson RHartfield, MPA Mr. J. K. Bryan OELD Vice President 0IE (3)

Union Electric Company BGrimes P. 9. Acx 149 FPagano St. Louis, Missouri 63166 RLTedesco/ADromerick t

Dear bryan:

SUJJECT: PROMPT liOTIFICATION IN Tile EVENT OF AN EMERGENCY 10 CFR 50, Appendix E, Section IV.D.3 requires applicants for nuclear power reactor licenses for powr operation to der.onstrate that administrative and physical means have been established for alerting and providing prompt instruc-tions to the public within the plume exposure EPZ in the event of an energency.

As part of our review for an operating license for Callaway please provide confirmation by isugust 12, 1981 that a prompt notification. system will be installed including-a schedule for installation, a description of the system, and a description or listing of the problems that may hinder impleacntation.,

Your verification that a public notification system meeting the regulations is in place is required prior i.0 issuance of a license for power operation. We expect that the Federal Emerger.cy Managenent Agency will review the adequacy of the system by evaluating the results of an actual system test, probably during the joint exercise of your facility with offsite authorities.

A copy of your response should be provided to Brian Grimes, Director, Division of Emergency Preparedness, Washington, D.C. 20555.

Since ely, i

I 0 g'ul e, rA im l

iw,rt L. hm l

Robert L. Tedesco, Assistant Director 1

for Licensing Division of Licensing cc: See next page 8108040100 810715 i

PDR ADOCK 05000483 l

F pga nf,l n

Dkfk.8h........DL M,y,4,,,

DLdpL,,,,,,,,

omer,

..I.Edj,s,g,n,,,,,,,,BJ,Y o" ood,RLTed,es,co,,,,,

sun, core

....f..u..9, 7/8/81 7/14/Q1 7/

mu>

y.............

Nac ronu sie 06@ Nacu cao~

-OFFICIAL RECORD COPY usceanuwam

~...

Mr. J. K. Bryan Vice President - Nuclear Union Electric Company P. O. Box 149 St. Louis, Missouri 63166 cc: Mr. Nicholas A. Petrick Mr. !4illiam Hansen Executive Director - SNUPPS Resident Insoector/Callaway NPS 5 Choke Cherry Road c/o USNRC Rockville, Maryland 20S50 Steedman, Missouri 65077 Gerald Charnoff, Esq.

Shaw, Pittman, Potts &

Trowbridge 1800 M Street, N. W..

Washington, D. C.

20036 Mr. J. E. Bi rk Assistant to the General Counsel Union Electric Company P. O. Box 149 St. Louis, Missouri 63166 Dr. Vern Starks Route 1, Box 363 Ketchikan, Alaska 99901 Ms. Trevalicarn, Assistant General Cnunsel Missouri Public Service Commission P. O. Box 360 Jefferson City, Missouci 65102 Mr. D. F. Schnell Manager-Nuclear Engineering Union Electric Company P. O. Box 149 St. Louis, Missouri 63166

, -