ML20009G159

From kanterella
Jump to navigation Jump to search
Forwards LER 81-055/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009G159


LER 81-055/03L-0:on 810416,cold Leg Injection Accumulator Declared Inoperable Due to High Level Alarm.Caused by Cold Leg Accumulator Discharge Check Valves Leaking.Valves to Be Repaired & Retested
ML20009G164
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/16/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G164 (1)
Forwards LER 81-055/03L-0.Detailed Event Analysis Encl
ML20009G158
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/15/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G158 (2)