ML20009F772
| ML20009F772 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/07/1981 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Scherer A ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| References | |
| NUDOCS 8107310605 | |
| Download: ML20009F772 (2) | |
Text
a 1
m l
s t
t 4
Q V
$}L 7 F
.e hk', a
'g[
f Docket Nos.: 50-361/362 Mr. A. E. Scherer A3198lam 51 Director of Licensing (9460-1922)
' Qp Combustion Engineering Inc.
O p
100 Prospect 11111 Road k
Windsor, con acticut 06095 kgg g -
Dear Mr. Scherer:
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSU*tE (SAN ON0FRE NUCLEAR GENERATING STATION, UNITS 2 AND 3)
By letters dated May 29 and June 8,1981 Southern California Edison submitted the following and requested that the documents be withheld from public dis-closure pursuant to 10 CFR 2.790:
" Responses to NRC Concerns on Applicability of the CE-1 CHF Correlation to the SONGS Fuel Design," CEN-165(S)-P, May 1981 (sumbitted 5/29/81) 2.
"CETOP-D Code Structure and Modeling Methods for San Onofre Nuclear Generating Station, Units 2 and 3 " CEN-160-(S)-P, May 1981 (submitted 6/8/81)
Each of the submittals included an affidavit signed by you, providing reasons for your requests that the documents be withheld from public disclosure. The affidavits stated, among other things, that:
(a) the information in the documents it customarily held in confidence by Combustion Engineering; (b) the informtion is not available in public sources; and (c) the information provides Combustion Engineering with a competitive economic advantage because development of the information required a considerable amount of man-hours and expense, and competitors would incur similar expenditures of time and money to develop equivalent information.
We have reviewed your affidavits and material based on the requirements and criteria of 10 CFR 2.790 and have determined that CEN-165(S)-P and CEN-160(S)-P contain trade secrets, confidential, proprietary commercial or financial infomation.
(
We riso have found at this time that the right of the public to be fully apprised as to the bases for and effects of the proposed action does not outweigh the demonstrated concern for protection of your competitive position.
l Accordtngly, we have detemined that the information should be withheld from l
public disclosure.
8107310605 810707 PDRADOCK05000g s
q
-e-
--.q, y
4
-t-e t
--ew
--w-e
1 N.
.,'ya g
i, JULi GM We therefore approve your request for withholding pursuant to Section 2.790 of 10 CFR Part 2 and are withholding CEN-165( S)-P and CEN-160-(S)-P from public inspection as proprietary.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document's. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, assure that the consultants have signed the appropriate agreements for handling proprietary data.
If the basis for withholding this information from public inspection should change in the future such that the infomation could then be made available for public inspection, you should promptly notify the NRC.
Sincerely.
Original signed by Robert L Teuse Robert L. Tedesco, Assistant Director for Licensing Division of Licensing DISTRIBUTION:
cc: Mr. Robert Dietch
. Docket File bec: ACRS (16)
Vice P(esident NRC PDR -
NSIC Southern California Edison Company Local POR TERA 2244 Walnut Grove Avenue OELD TIC P. O. Box 800 LB#3 Rdg File Rosemead, California 91770 HRood JLee Mr. D. W. Gilman I&E (3)
Vice President - Power Supply Tedesco San Diego Gas & Electric Company MRushbrook 101 Ash Street EShomaker P. O. Box 1831 San Diego, California 92112 h,
,hD v[,h,.
f B#3 DL. /L omt >
DL LB#3,
..DL : LB,#,3
,.D.L,: L B p.3,.
5=^*5) h w t....
..tlRo.od. b,. Me d M k...
.EShomaker
.EJ(Ivi al10..
..RBMSEO..
- " ' ' >6/.h/.81.....
. 6l.N.l.81..
610.Y.8.1....(,.h/.8.1...
.fl..G/8L
&.h.l8.1.....
Ec ronu scwe soinacu o2do OFFICIAL RECORD COPh' '
" ' n w n e2.